N Nebraska Public Power District Aluays there when you need us NLS2004123 October 11, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Report for September 2004, Docket 50-298 The purpose of this letter is to provide the Cooper Nuclear Station Monthly Operating Report for September 2004. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of September. In accordance with Technical Specification 5.6.4, this report also includes documentation of challenges to the safety/relief valves.

Should you haave any comments or require additional infonnation regarding this report, please contact Paul Fleming at (402) 825-2774.

/c)

Enclosure cc: NRC Regional Administrator W. J. Felirman NRC Senior Resident Inspector W. D. Shanks ANI Library R. K. Edington C. C. Warren J. M. Cline B. Lexvis A. L. Dostal G. XW. Griffith J. C. Roberts J. XV. Dutton S. Moffitt R. L. Gunirm INPO Records Center Records 0---

Tilq COOPER NUCEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

APPENDIX A OPERATING DATA REPORT DOCKFT NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 1011112004 COMPLETED BY Christine Parkvn TELEPHIONE (402) 825-5,487 Reporting Period: Septemher 2004 This Month Yr-to-Date Curnulatfie

1. Design Electrical Rating (Net Mte). 778.0 N'A N'A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2. Maximum Dependable Capacity (Net NMU e): 764.0 NA N'A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
3. Number of Hours the Reactor Was Critical. 720.0 6.575.0 205.591.3 The total number of hours during the gross hours of the reporting period that the reactor w'as critical.
4. Number of I lours the Generator Was Ott Line. 720.0 6.575.0 202.681.3 (Also called Scrv ice Hlours). The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus.

The sum of the hours the generator wias on line plus the total outage hours should equal the gross hours in the reporting period.

5. Unit Reserve Shutdown Ifours. 0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6. Net Electrical Energy (MtWII). 536.463.0 4.923219.0 138.077224.0 The gross electrical output of the unit measured at the output tenstinals of the turbine-gencrator minus the nonnal station service loads during the gross hours of the reporting period. expressed in mega-watt hours. Negative quantities should not be used.

20/11/2C04 9:4C kti

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-0298 UNIT NAME Cooper Nnclear Station DATE 10/1 1/2004 COMNPLETED BY Christine l'arkyn TELEPHONE (402) 825-5487 REPORT MINONTII September 2004 NO. Date FORCED DF Juration (110or) Reason (1) Method (fShiutting CAUSE/CORRECTIVE ACTIONS COMMENTS

.S: SCHEDULED J .1. 4 4 4 4 I I I SUMIAR)': None (I) Reason:

A - Equipment Failure (Explain)

-. Maintenance or Test C- Rerfueling D - Regulatnry Restriction E - Operator TrainingII.Ieense Examination F- Administrative G - Operational Error (EpIaln)

II - Other (Eiplalan)

(2) Mrethod:

I - Manual 2 *lManual Trip/Scram 3 . Automatic Trip/Scram 4 - Continnatlon 5 - Other (Explain) 10/11/2004 9:40 All

APPENDIX C SAFETY/RELIEF VALVE CHALLENGES SEPTEMBER 2004 There were no challenges to the safety/relief valves during the month of September.

I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTSl Correspondence Number: NLS2004123 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None 4-4.

I PROCEDURE 0.42 l REVISION 15 l PAGE 18 OF 24

Text

N Nebraska Public Power District Aluays there when you need us NLS2004123 October 11, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Report for September 2004, Docket 50-298 The purpose of this letter is to provide the Cooper Nuclear Station Monthly Operating Report for September 2004. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of September. In accordance with Technical Specification 5.6.4, this report also includes documentation of challenges to the safety/relief valves.

Should you haave any comments or require additional infonnation regarding this report, please contact Paul Fleming at (402) 825-2774.

/c)

Enclosure cc: NRC Regional Administrator W. J. Felirman NRC Senior Resident Inspector W. D. Shanks ANI Library R. K. Edington C. C. Warren J. M. Cline B. Lexvis A. L. Dostal G. XW. Griffith J. C. Roberts J. XV. Dutton S. Moffitt R. L. Gunirm INPO Records Center Records 0---

Tilq COOPER NUCEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

APPENDIX A OPERATING DATA REPORT DOCKFT NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 1011112004 COMPLETED BY Christine Parkvn TELEPHIONE (402) 825-5,487 Reporting Period: Septemher 2004 This Month Yr-to-Date Curnulatfie

1. Design Electrical Rating (Net Mte). 778.0 N'A N'A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2. Maximum Dependable Capacity (Net NMU e): 764.0 NA N'A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
3. Number of Hours the Reactor Was Critical. 720.0 6.575.0 205.591.3 The total number of hours during the gross hours of the reporting period that the reactor w'as critical.
4. Number of I lours the Generator Was Ott Line. 720.0 6.575.0 202.681.3 (Also called Scrv ice Hlours). The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus.

The sum of the hours the generator wias on line plus the total outage hours should equal the gross hours in the reporting period.

5. Unit Reserve Shutdown Ifours. 0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6. Net Electrical Energy (MtWII). 536.463.0 4.923219.0 138.077224.0 The gross electrical output of the unit measured at the output tenstinals of the turbine-gencrator minus the nonnal station service loads during the gross hours of the reporting period. expressed in mega-watt hours. Negative quantities should not be used.

20/11/2C04 9:4C kti

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-0298 UNIT NAME Cooper Nnclear Station DATE 10/1 1/2004 COMNPLETED BY Christine l'arkyn TELEPHONE (402) 825-5487 REPORT MINONTII September 2004 NO. Date FORCED DF Juration (110or) Reason (1) Method (fShiutting CAUSE/CORRECTIVE ACTIONS COMMENTS

.S: SCHEDULED J .1. 4 4 4 4 I I I SUMIAR)': None (I) Reason:

A - Equipment Failure (Explain)

-. Maintenance or Test C- Rerfueling D - Regulatnry Restriction E - Operator TrainingII.Ieense Examination F- Administrative G - Operational Error (EpIaln)

II - Other (Eiplalan)

(2) Mrethod:

I - Manual 2 *lManual Trip/Scram 3 . Automatic Trip/Scram 4 - Continnatlon 5 - Other (Explain) 10/11/2004 9:40 All

APPENDIX C SAFETY/RELIEF VALVE CHALLENGES SEPTEMBER 2004 There were no challenges to the safety/relief valves during the month of September.

I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTSl Correspondence Number: NLS2004123 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None 4-4.

I PROCEDURE 0.42 l REVISION 15 l PAGE 18 OF 24