Nebraska Public Power District - Letter - Revisions to the Strategic Improvement Plan Cooper Nuclear Station Docket 50-298, DPR-46 Dated March 30, 2004
ML041050198
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/30/2004
From: Edington R
Nebraska Public Power District (NPPD)
To: Mallett B
NRC Region 4
References
NLS2004038, TAC MA7618
Download: ML041050198 (12)


Text

Nebraska Public Power District Always there when you need us NLS2004038 March 30, 2004 Bruce Mallett Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011

Subject:

Revisions to The Strategic Improvement Plan Cooper Nuclear Station, Docket 50-298, DPR-46

Reference:

1. Nebraska Public Power District letter NLS2002141 to Ellis W. Merschoff (U.S. Nuclear Regulatory Commission) dated November 25, 2002, "The Strategic Improvement Plan (TIP) Revision 2"
2. Nebraska Public Power District letter NLS200301 0 to Ellis Merschoff (U.S. Nuclear Regulatory Commission) dated January 21, 2003, "Revisions to Proposed Commitments for Inclusion in a Confirmatory Action Letter"
3. Letter to Clay C. Warren (Nebraska Public Power District) from Ellis W.

Merschoff (U.S. Nuclear Regulatory Commission) dated January 30, 2003, "Confirmatory Action Letter"

4. Nebraska Public Power District letter NLS2003017 to Ellis Merschoff (U.S. Nuclear Regulatory Commission) dated March 14, 2003, "Revisions to Confirmatory Action Letter" The purpose of this letter is to inform the Nuclear Regulatory Commission (NRC) of changes to The Strategic Improvement Plan (TIP) Action Plans. On March 18, 2004, Paul V. Fleming, Licensing and Regulatory Affairs Manager at Nebraska Public Power District, and other members of the Cooper Nuclear Station (CNS) staff, discussed these changes with Kriss Kennedy, Chief, NRC Region IV Branch C. On March 25, 2004, Mr. Fleming had further discussions with Mr. Kennedy concerning the subject changes.

Reference 1 transmitted TIP, Revision 2, to the NRC and identified TIP actions that were appropriate for inclusion in a Confirmatory Action Letter (CAL) as regulatory commitments.

Reference 2 provided a revised list of commitments for inclusion in the CAL. Reference 3 COOPER NUCLEAR STATION P.O. Box 98 / Browrville, NE 68321-0098 Telephone: (402) 825-811 / F3:Y: (402) 825-5211 www.npFd.com

NLS2004038 Page 2 of 5 subsequently transmitted the CAL. Reference 4 documented a revision to the CAL. Included among the CAL commitments identified in References 3 and 4 were TIP Action Plans 5.2.1.2, 5.2.7.1, 5.3.1.2.e, 5.3.1.2.i, and 5.3.3.3. Steps within these Action Plans have been revised and are the subject of this correspondence.

TIP Action Plan 5.2.1.2 addresses Operability Determinations (ODs). Reference 4 added Action Step 10 of this Action Plan to the scope of the CAL. Step 10 involved formation of a core group of Operations and Engineering personnel that would perform or review and approve ODs for six months in order to improve consistency and quality. In 2Q/03, Step 11 was being pursued to apply a Systematic Approach to Training to the OD process. As a result of this effort, the decision was made to train a large target population of individuals on the fundamentals of the OD process. It was believed that this action to expand the knowledge base of personnel involved with the OD process would effectively meet the intent of Step 10, which was to improve consistency and quality of ODs. In addition, an oversight group had been established in accordance with Step 7 to monitor the OD process and capture lessons learned to improve the OD process. After several months of reviews, the oversight group identified no significant issues concerning OD quality and consistency. Therefore, it was determined that formation of the core group as called for in the original step was not warranted. As a result of the interim effectiveness assessment directed by Step 13 and subsequent evaluation of the results, it was determined that although improvements had been made, the knowledge level of personnel performing ODs is still not at a level that will ensure sustained performance. Therefore, a decision was made to take additional actions to raise the knowledge and proficiency of personnel performing ODs. Step 10 was revised to include actions to develop a new training qualification for performing ODs, followed by qualification of a select group of personnel to the revised training qualification. This revised Step 10 addresses Action Plan causal factors 3 and 6 in addition to those addressed by the original Step 10. This action will be completed by the existing Step 10 due date of IQ/04. As a further enhancement, a new Step 15 has been added to this Action Plan to implement the Entergy OD procedure in 2Q/04. Review of the Entergy OD procedure determined that it was clearer and more concise and that it would be beneficial to replace the existing CNS OD procedures and desktop guides with the Entergy OD procedure. The Entergy OD procedure has been proven to be effective at other sites and should simplify the process for producing quality ODs at CNS.

The Entergy OD procedure addresses Action Plan 5.2.1.2 causal factors 1, 2, 5, 8, and 9.

Because previously completed steps in Action Plan 5.2.1.2 resulted in changes to the existing CNS procedures and desktop guides, they have been reviewed to determine if the actions are appropriately addressed in the Entergy procedure and/or other CNS procedures. Following is a discussion of those items that will not be carried forward along with a justification why this is appropriate:

Action Step 4 implemented requirements for additional reviews of ODs. It has been determined that additional reviews by Operations Management, a second Shift Supervisor, and System Engineering Management are no longer necessary. The improvements made through this Action Plan to increase the knowledge base for personnel who perform and approve ODs is the appropriate mechanism to drive improved

NLS2004038 Page 3 of 5 performance, rather than requiring more reviews. The reviews specified by the Entergy procedure (Shifl Manager and Responsible Engineering Manager) will provide an appropriate level of review.

Action Step 9 resulted in the development of an overview procedure to more effectively direct the entire Generic Letter (GL) 91-18 process and make ties to other CNS procedures that interface with the process to ensure that GL 91-18 issues are corrected in a manner commensurate with safety. With the adoption of the Entergy OD procedure, an additional overview procedure is no longer required. The revised CNS 0.5.OPS procedure, which will incorporate the Entergy OD procedure, will be used to perform ODs, and CNS Procedures 0.5.NAIT and 0.40 will prioritize and resolve the conditions.

No direct tie between the procedures is required since each procedure independently fulfills its intended function.

TIP Action Plan 5.2.7.1 addresses improved use of the corrective action program to effectively resolve station problems. Action Step l a has been revised in this Action Plan. Step I a pertains to reinforcement of the "take action now" philosophy through coaching and monitoring in Condition Review Group review of notifications, with use of the Closed Based on Actions Taken (CBOAT) indicator to monitor effectiveness. This step was revised to reflect that performance will be measured by an indicator that combines CBOAT and TREND actions as both are methods to provide immediate disposition of issues. Trending documents an immediate management decision that corrective action is not currently warranted. The combination of CBOAT and TREND into a common performance indicator is consistent with industry practices.

The deliverable for this step was also revised to remove the 35% criterion for the CBOAT indicator. As written, the deliverable was unclear as to the length of time in the monitoring period that performance must meet the 35% criterion and it was also determined that setting a goal that could be perceived as establishing a "quota" was not appropriate. Rather the deliverable was revised to reflect improved application of CBOAT and TREND classification of notifications as evidenced by an improved performance trend over the period of this Action Step.

TIP Action Plan 5.3.1.2.e addresses a long standing equipment issue related to wvater sulfates.

Action Steps 7 and 8 have been revised in this Action Plan. Step 7 previously stipulated that a Change Evaluation Document (CED) would be developed to install catch basins in various plant locations to prevent groundwater in-leakage from entering the floor drain system. This step was revised to state that a CED would be developed to prevent groundwater in-leakage from building penetrations. Rather than installing catch basins, the problem will be corrected by eliminating ground water in-leakage into the floor drain systems through installation of improved penetration seals. This solution eliminates the need to install catch basins in various plant locations. The deliverable was also revised such that it still requires an approved CED, but removed the specific reference to installation of catch basins. The deliverable for Step 8 was also subsequently revised to remove the reference to installation of catch basins, but still requires CED implementation.

TIP Action Plan 5.3.1.2.i addresses a long standing equipment issue related to air systems.

Action Step 8b requires approval of a CED to replace the current station air compressors. This

NLS2004038 Page 4 of 5 step was originally scheduled to be completed by 1Q/04, but has been extended to 2Q/04. Delays were encountered in the review/comment resolution process, as well as in selecting the final vendor to supply the new air compressors. Step 8c in this Action Plan pertains to installation of the new service air compressors. The start and end dates of Step 8c will not be impacted by the delay in CED approval.

TIP Action Plan 5.3.3.3 addresses completion of the Unauthorized Modifications Follow-up Project. The deliverable for Action Step 5 wvas revised in this Action Plan. This step requires the revision of configuration documents to reflect the Engineering Evaluations/Change Evaluation Documents developed in Action 4 and the authorized configuration changes identified in Actions I and 2. This population includes certain drawing changes that require entry into a steam affected radiation area to "as-build." Entering steam affected radiation areas at power for this activity would result in unwarranted radiation dose and is inconsistent with station As Low As Reasonably Achievable (ALARA) policy. Therefore, the deliverable was revised to reflect that drawing changes requiring "as-building" in steam affected radiation areas will be brought to "pending" status, notifications generated to complete the "as-building," and work activities scoped and scheduled for completion in the next refueling outage. As the related modifications have now been authorized and the drawings brought under the station's configuration control program, there is no safety significance associated with delaying final drawing revision until plant conditions allow and controlling the conduct of such revisions outside the scope of this TIP Plan.

Attachment I provides the specific revisions to the Action Plans discussed above.

The attached List of Regulatory Commitments contains those revised commitments within the scope of the CAL.

Should you have any questions concerning these revised TIP Action Plans, please contact Mr.

Paul Fleming at (402) 825-2774.

Sincerely, Randall K. Edington Vice President - Nuclear and Chief Nuclear Officer

/lb Attachment

NLS2004038 Page 5 of 5 cc: U.S. Nuclear Regulatory Commission w/attachment Attn: Document Control Desk Washington, D.C. 20555-0001 Senior Project Manager Nv/attachment USNRC - NRR Project Directorate IV-1 Kriss Kennedy w/attachment Chief, Branch C U.S. Nuclear Regulatory Commission Region IV Senior Resident Inspector w/attachment USNRC NPG Distribution w/attachment Records w/attachment

NLS2004038 Attachment I Page 1 of 6 REVISIONS TO THE STRATEGIC IMPROVEMENT PLAN ACTION PLANS

NLS2004038 Attachment I Page 2 of 6 Revision to TIP Action Plan 5.2.1.2, Step 10 and New Step 15 Operability Determinations NO. ACTION START END DELIVERABLE DATE DATE 10 flPLUVe conusistency and quality of 2Q +"Q/04 R prures inuccorJcith lessns Opseability DetLknk1inations. by ffming-a 1Q/04 10/04 leaLed fruoi thlis effoll. Issuc a filal L t core group, of E8pCrati01ns alld EnlginlctC11Tg SU111111al;ZGing thlC grOUP'S C01A,1tusioUM lo tlC,e personel that wvould per fbL111 .iC;Wer0tiUons Mvanaager and ELIgIL  ;,g iu1gS i and app~ve upe.iablity dete..imiiationsi fbr Marager.

6 miunths.

  • New training qualification developed Develop new training qualification for for performing operability performing operability determinations and determinations.

qualifv select personnel to the new qualifications.

15 Implement the Entergy Operabilit 10/04 2/04 Entergv Operability Determination procedure Determination procedure. (ENN-OP-1 04) implemented.

NLS2004038 Page 3 of 6 Revision to TIP Action Plan 5.2.7.1, Step la Improve Use of CAP to Effectively Resolve Station Problems NO. ACTION START END DELIVERABLE DATE DATE la Re-enforce the "take action now" 3Q/02 IQ/04 Usc ofthe CBOAT iJdiatino hiu,.vukk philosophy through coaching and > 35%. (Overall results will lbe i monitoring in Condition Review Group utiliLation1 of CAP pr t IvC55UC (CRG) review of notifications. Use quickly). Improved application of CBOAT established Closed Based on Actions Taken and TREND classification of notifications as (CBOAT)/TREND indicator to monitor evidenced by an improved performance trend and trend effectiveness at taking action on over the period of this Action Step.

the spot.

NLS2004038 Attachment I Page 4 of 6 Revision to TIP Action Plan 5.3.1.2.e, Steps 7 and 8 Water Sulfates (Long Standing Equipment Issue)

NO. ACTION START END DATE DELIVERABLE DATE 7 Develop Change Evaluation Document 2Q/03 IQ/04 Approved CED to install modification allow (CED) to install catch bains in ;StallatiUi uf anteL bnsiLs.

pant locations to prevent groundwater in-leakage from terin o drai system building penetrations.

8 Implement CED. IQ/04 3Q/04 ea t ch basins isXtalled and verified tu be.

functional CED installed and inspected satisfactorily.

NLS2004038 .9 Attachment I Page 5 of 6 Revision to TIP Action Plan 5.3.1.2.i, Step 8b Air Systems (Long Standing Equipment Issue)

NO. ACTION START END DATE DELIVERABLE DATE 8b Develop a CED to replace the SA 3Q/03 -Q/04 Approved CED to replace the current station Compressors with current generation 20/04 air compressors.

design units.

NLS2004038 Attachment I Page 6 of 6 Revision to TIP Action Plan 5.3.3.3, Step 5 Unauthorized Modifications Follow-Up Project Completion NO. ACTION START END DATE DELIVERABLE DATE 5 Revise configuration documents to reflect 2Q/03 1Q/04 Revised drawings, databases and procedures the EE's/CED's developed in Action 4 as as appropriate. Drawing changes requiring well as authorized configuration changes "as-building" in steam affected radiation identified in Actions 1 and 2. areas are not required to be statused-as "Complete." but must be brought to "Pending" status.

Notifications are assigned for "Pending" drawing changes. "Pending" drawing changes are scoped and scheduled as work activities for completion in the next refueling outage (RE22).

ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© Correspondence Number: NLS2004038 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE Action Plan 5.2.1.2, Step 10 - Develop new training qualification for performing operability determinations and 1Q104 qualify select personnel to the new qualifications.

Action Plan 5.2.7.1, Step la - Re-enforce the "take action now" philosophy through coaching and monitoring in Condition Review Group (CRG) review of notifications. Use established 1Q104 Closed Based on Actions Taken (CBOAT)/TREND indicator to monitor and trend effectiveness at taking action on the spot.

Action Plan 5.3.1.2.e, Step 7 - Develop Change Evaluation IQ/04 Document (CED) to prevent groundwater in-leakage from building penetrations.

Action Plan 5.3.3.3, Step 5 - Revise configuration documents to reflect the EE's/CED's developed in Action 4 as well as IQ/04 authorized configuration changes identified in Actions 1 and 2.

PROCEDURE 0.42 REVISION 14 I PAGE 15 OF 17