NLS2004112, Response to Request for Additional Information Regarding Revision of Technical Specification Surveillance Requirement 3.3.2.1.4 and Table 3.3.2.1-1

From kanterella
Jump to navigation Jump to search
Response to Request for Additional Information Regarding Revision of Technical Specification Surveillance Requirement 3.3.2.1.4 and Table 3.3.2.1-1
ML042780489
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/28/2004
From: Minahan S
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2004112
Download: ML042780489 (4)


Text

.-

Nebraska Public Power District Always themewhen you need us NLS20041 12 September 28. 2004 U.S. Nuclear Regulatory Commission Attn: Docuincut Control Desk Washington, D.C. 20555-0001

Subject:

Response to Request for Additional Information Regarding Revision of Technical Specification Surveillance Requirement 3.3.2.1.4 and Table 3.3.2.1 -

Cooper Nuclear Station, Docket 50-298, DPR-46

Reference:

Letter to Rt. K. Edington, Nebraska Public Powecr District, from nM. C. Hloncharik, U.S. Nuclear Regulatory Commission, dated August 13, 2004, '"Request for Additional Intonnation Regarding Revision of Technical Specification Surveillance Requirement 3.3.2.1.4 and Table 3.3.2.1 -I (TAC No. MC0629)

The purpose of this letter is for the Nebraska Public Power District to submit lo the U.S. Nuclear Regulatory Commission the response to the request for additional infonnation provi(ded by teie relCerence letter. The response is attached.

It you have any qluestions regarding this matter please call Paul Flerning, Licensing Manager, at (402) 825-2774.

I declare under peinalty of perjury that the foregoing is true and correct.

Executed on: Y/ L Y0 (date)

Stewvart B. Minahian General Manager of Plant Operations

/c1b Attachment 4DID COOPER NUCLEAR STAMON P.O. Box 98 / Brownville, NE 68321.0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

NLS20041 12 Page 2 of 2 cc: Regional Administrator xv/attachment USNRC - Region IV Senior Project Manager xv/attachment USNRC - NRR Project Directorate IV-I Senior Resident Inspector w/attachment USNRC Nebraska Health and Human Services w/attachment Department of Regulation and Licensure NPG Distribution w/attachment Records w/attachment

NLS2004112 Attachment Page 1 of I Response to Request for Additional Information Regarding Revision of Technical Specification Su rveillancc Requirement 3.3.2.1.4 and Table 3.3.2.1-1 Cooper Nuclear Station, Docket 50-298, DPR-46 NRC Request The response to question I stated: "The calculationConclusion Section lists a set ofpermissible rod block valuesfor AL, A V and OperatingSelpoint, based on different AMCPR [mi71ninnlm c)itical power ratiol limits... Therefore, the sctpointsfor the various regions were selected based on a MCPR Limit of 1.30... " How does the NPPDjustiy using what appearsto be a slighttly less conservative value of APCR?

CNS Response Note: This question refers to question I of NLS2004006, "Response to Request for Additional Information Regarding Licensing Amendment Request to Revise Technical Specifications (TS)

Surveillance Requirements and TS Table for Mathematical Symbols and Use of Allowable Values in the Place of Analytical Limits" dated March 9, 2004.

Extended Load Line Limit and ARTS Improvement Program Analyses for Cooper Nuclear Station Cycle 14, (NEDC-21892P, Rev 1, DRF B13-01512 Dated May 1991) Section 5.5 reads "Any set of RBM setpoints with a corresponding OLMCPR equal to or less than that of the limiting plant OLMCPR based on the other transient results can be utilized. The higher RBM setpoints (with a higher OLMCPR value) will afford more control rod movement flexibility without unnecessary alarms and rod blocks."

The Nuclear Regulatory Commission approved use of the Extended Load Line Limit and ARTS Improvement Program Analyses for Cooper Nuclear Station Cycle 14, NEDC-21892P, Rev I, May 1991 by Amendment 151 dated December 31, 1991.

I ATTAC IhlENT 3 LIST OF REGULATORY COMMITIMENTSOK Correspondence Number: NLS2004112 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal rel)resent inten(led or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMIMITTED DATE COMMITMENT OR OUTAGE None PROCEDURE 0.42 P l REVISION 15 PAGEJ 18 OF 24 P