Text
Nebraska Public Power District Always there when you need us NLS2004017 February 13, 2004 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report for January 2004, Docket No. 50-298 The purpose of this letter is to provide the Cooper Nuclear Station Monthly Operating Report for January 2004. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of January. In accordance with Technical Specification 5.6.4, this report also includes documentation of challenges to the safety/relief valves.
Should you have any comments or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.
Sincerely, John Christensen Plant Manager
/cb Enclosure cc: NRC Regional Administrator W. J. Fehrman NRC Senior Resident Inspector W. D. Shanks ANI Library R. K. Edington C. C. Warren J. M. Cline B. Lewis A. L. Dostal G. W. Griffith J. W. Dutton S. Moffitt R. L. Gumm INPO Records Center Records COOPERNUCLEARSTATION P.O. Box 98 / Brownville, NE 68321.0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com
APPENDIX A OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 213/2004 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 Reporting Period: January 2004 This Month Yr.-to-Date Cumulative
- 1. Design Electrical Rating (Net MWe). 778.0 NA NIA The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
- 2. Mlaximum Dependable Capacity (Net Me): 764.0 N 'A N!A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
- 3. Number of Ilours the Reactor Was Critical. 744.0 744.0 199760.3 The total number ofhours during the gross hours of the reporting period that the reactor was critical.
- 4. Number of Ilours the Generator Was On Line. 744.0 744.0 196850.3 (Also called Service lours). Thc total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
- 5. Unit Reserve Shutdown lours. 0.0 0.0 0.0 The total number or hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
- 6. Net Electrical Encrgy (MWII). 570190.0 570190.0 133724195.0 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega-watt hours. Negative quantities should not be used.
2/4/2C04 2: rM
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 2/13/2004 COMPLETED BV Rod rick Wilson TELEPHONE (402) 825-5135 REPORT MNONTIJ Januarv 2004 No. Date F: FORCED Duration (llonr) Reason (I) Method Of Shutting CAUSE/CORRECTIVE ACTIONS COMMENTS S: SCEDUEDD Down (2) i t I i i I
£ _______________________ 1. J. I_________________ I SU.MNIARY: None (I) Reason:
A - Equipment Failure (Explain) n -%Maintenanceor Test C . Refueling D -Regulatory Restriction E -Operator Training/License Examination F- Administrative G - Operational Error (EFplaln) 11 - Other (Explain)
(2) Method:
I - Mannal 2 -Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation S - Other (Explain) 2/4/2004 1:15 PM
APPENDIX C SAFETY/RELIEF VALVE CHALLENGES JANUARY 2004 There were no challenges to the safety/relief valves during the month of January.
I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTSl Correspondence Number: NLS2004017 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None 4-4-
4-4-
4-I PROCEDURE 0.42 l REVISION 14 l PAGE 15 OF 17
Text
Nebraska Public Power District Always there when you need us NLS2004017 February 13, 2004 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report for January 2004, Docket No. 50-298 The purpose of this letter is to provide the Cooper Nuclear Station Monthly Operating Report for January 2004. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of January. In accordance with Technical Specification 5.6.4, this report also includes documentation of challenges to the safety/relief valves.
Should you have any comments or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.
Sincerely, John Christensen Plant Manager
/cb Enclosure cc: NRC Regional Administrator W. J. Fehrman NRC Senior Resident Inspector W. D. Shanks ANI Library R. K. Edington C. C. Warren J. M. Cline B. Lewis A. L. Dostal G. W. Griffith J. W. Dutton S. Moffitt R. L. Gumm INPO Records Center Records COOPERNUCLEARSTATION P.O. Box 98 / Brownville, NE 68321.0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com
APPENDIX A OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 213/2004 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 Reporting Period: January 2004 This Month Yr.-to-Date Cumulative
- 1. Design Electrical Rating (Net MWe). 778.0 NA NIA The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
- 2. Mlaximum Dependable Capacity (Net Me): 764.0 N 'A N!A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
- 3. Number of Ilours the Reactor Was Critical. 744.0 744.0 199760.3 The total number ofhours during the gross hours of the reporting period that the reactor was critical.
- 4. Number of Ilours the Generator Was On Line. 744.0 744.0 196850.3 (Also called Service lours). Thc total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
- 5. Unit Reserve Shutdown lours. 0.0 0.0 0.0 The total number or hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
- 6. Net Electrical Encrgy (MWII). 570190.0 570190.0 133724195.0 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega-watt hours. Negative quantities should not be used.
2/4/2C04 2: rM
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 2/13/2004 COMPLETED BV Rod rick Wilson TELEPHONE (402) 825-5135 REPORT MNONTIJ Januarv 2004 No. Date F: FORCED Duration (llonr) Reason (I) Method Of Shutting CAUSE/CORRECTIVE ACTIONS COMMENTS S: SCEDUEDD Down (2) i t I i i I
£ _______________________ 1. J. I_________________ I SU.MNIARY: None (I) Reason:
A - Equipment Failure (Explain) n -%Maintenanceor Test C . Refueling D -Regulatory Restriction E -Operator Training/License Examination F- Administrative G - Operational Error (EFplaln) 11 - Other (Explain)
(2) Method:
I - Mannal 2 -Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation S - Other (Explain) 2/4/2004 1:15 PM
APPENDIX C SAFETY/RELIEF VALVE CHALLENGES JANUARY 2004 There were no challenges to the safety/relief valves during the month of January.
I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTSl Correspondence Number: NLS2004017 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None 4-4-
4-4-