|
---|
Category:Letter type:NLS
MONTHYEARNLS2024006, Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022050, Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library2022-11-0909 November 2022 Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library NLS2022048, Management Change and Correspondence Update2022-11-0101 November 2022 Management Change and Correspondence Update NLS2022047, Core Operating Limits Report, Cycle 33, Revision 02022-10-14014 October 2022 Core Operating Limits Report, Cycle 33, Revision 0 NLS2022042, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2022-10-0707 October 2022 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2022037, Emergency Plan, Revision 80, Summary of 50.54(q) Analyses2022-08-18018 August 2022 Emergency Plan, Revision 80, Summary of 50.54(q) Analyses NLS2022035, Evacuation Time Estimate Report for Cooper Nuclear Station2022-08-16016 August 2022 Evacuation Time Estimate Report for Cooper Nuclear Station NLS2022031, Licensee Guarantees of Payment of Deferred Premiums2022-07-19019 July 2022 Licensee Guarantees of Payment of Deferred Premiums NLS2022005, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-06-16016 June 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements NLS2022025, Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring2022-06-0606 June 2022 Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring NLS2022016, Annual Radiological Environmental Report2022-05-10010 May 2022 Annual Radiological Environmental Report NLS2022020, Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report2022-05-0202 May 2022 Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report NLS2022014, Annual Radioactive Effluent Release Report2022-04-27027 April 2022 Annual Radioactive Effluent Release Report NLS2022010, Annual Report of Individual Exposure Monitoring2022-04-0505 April 2022 Annual Report of Individual Exposure Monitoring NLS2022009, Property Insurance Coverage2022-03-23023 March 2022 Property Insurance Coverage NLS2022011, Preparation and Scheduling of Operator Licensing Examinations2022-03-18018 March 2022 Preparation and Scheduling of Operator Licensing Examinations NLS2022004, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 12022-02-0707 February 2022 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 1 NLS2022003, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20212022-01-20020 January 2022 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2021 NLS2021067, ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-16016 December 2021 ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan NLS2021069, Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-12-15015 December 2021 Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021066, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 32021-12-10010 December 2021 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 3 NLS2021065, Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-012021-12-0606 December 2021 Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-01 NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements 2024-01-25
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARNLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021018, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-05-11011 May 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NLS2021015, (CNS) - Technical Specification Bases Changes2021-04-16016 April 2021 (CNS) - Technical Specification Bases Changes NLS2020007, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-04-0101 April 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process NLS2020004, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2020-04-0101 April 2020 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules NLS2019022, Application for Technical Specifications Improvement to Eliminate Requirements for Hydrogen/Oxygen Monitors (TSTF-447, Rev. 1)2019-05-23023 May 2019 Application for Technical Specifications Improvement to Eliminate Requirements for Hydrogen/Oxygen Monitors (TSTF-447, Rev. 1) NLS2019020, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit Mcpr.2019-05-23023 May 2019 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit Mcpr. NLS2019011, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2019-02-28028 February 2019 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. NLS2018010, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-06-11011 June 2018 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. ML18137A2102018-05-10010 May 2018 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2016046, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify Surveillance Requirement Usage Rule Application to Section 5.5 Testing.2016-08-26026 August 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify Surveillance Requirement Usage Rule Application to Section 5.5 Testing. NLS2016038, Supplement to License Amendment Request to Replace Figure with Text in Technical Specifications2016-06-13013 June 2016 Supplement to License Amendment Request to Replace Figure with Text in Technical Specifications ML16120A3702016-04-21021 April 2016 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2016010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2016-03-22022 March 2016 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program NLS2016002, Application to Revise Technical Specifications to Adopt TSTF 535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2016-03-11011 March 2016 Application to Revise Technical Specifications to Adopt TSTF 535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. NLS2015103, License Amendment Request to Replace Figure with Text in Technical Specifications2015-09-0808 September 2015 License Amendment Request to Replace Figure with Text in Technical Specifications NLS2014087, License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function2015-01-15015 January 2015 License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function NLS2014030, License Amendment Request to Delete Condensate Storage Tank as an Alternate Source of Makeup Water2014-08-26026 August 2014 License Amendment Request to Delete Condensate Storage Tank as an Alternate Source of Makeup Water NLS2014028, License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications2014-07-17017 July 2014 License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications NLS2014035, License Amendment Request to Eliminate Requirements for Post Accident Sampling System for Boiling Water Reactors Using the Consolidated Line Item Improvement Process2014-07-14014 July 2014 License Amendment Request to Eliminate Requirements for Post Accident Sampling System for Boiling Water Reactors Using the Consolidated Line Item Improvement Process NLS2014022, License Amendment Request - Revision of Cyber Security Plan Implementation Schedule2014-03-14014 March 2014 License Amendment Request - Revision of Cyber Security Plan Implementation Schedule NLS2013014, License Amendment Request to Revise License Renewal License Condition 2.E2013-02-12012 February 2013 License Amendment Request to Revise License Renewal License Condition 2.E NLS2012042, Nebraska Public Power District (NPPD) - License Amendment Request for DPR- 46 for Cooper Nuclear Station to Revise the Physical Protection Protection License Condition Related to the Cyber Security Plan2012-06-14014 June 2012 Nebraska Public Power District (NPPD) - License Amendment Request for DPR- 46 for Cooper Nuclear Station to Revise the Physical Protection Protection License Condition Related to the Cyber Security Plan ML12157A2062012-05-30030 May 2012 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2012006, Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c)2012-04-24024 April 2012 Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c) NLS2011071, License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a2011-09-16016 September 2011 License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a NLS2011026, License Amendment Request for Administrative Revisions to Technical Specifications and to Remove an Expired One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve2011-03-26026 March 2011 License Amendment Request for Administrative Revisions to Technical Specifications and to Remove an Expired One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve ML1101002912011-01-0505 January 2011 Cooper - License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2010043, License Amendment Request on Non-Conservative Battery Terminal Voltage and Specific Gravity in Technical Specification Surveillance Requirements2010-10-29029 October 2010 License Amendment Request on Non-Conservative Battery Terminal Voltage and Specific Gravity in Technical Specification Surveillance Requirements NLS2010006, License Amendment Request to Correct Power Factor Limit and to Incorporate a Generic Revision in Technical Specification Surveillance Requirement 3.8.1.92010-02-25025 February 2010 License Amendment Request to Correct Power Factor Limit and to Incorporate a Generic Revision in Technical Specification Surveillance Requirement 3.8.1.9 ML1001900422010-02-0303 February 2010 Summary of Telephone Conference Call Held on 1/8/2010, Between the U.S. NRC and Nebraska Public Power District Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper Nuclear Station ML0934309332009-12-0707 December 2009 SAMA Meteorological Anomaly Related to the Cooper Nuclear Station License Renewal Application Cooper Nuclear Station, Docket No. 50-298, DPR-46 NLS2009084, License Amendment Request for Approval of the Cyber Security Plan2009-11-19019 November 2009 License Amendment Request for Approval of the Cyber Security Plan NLS2009034, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2009-06-0202 June 2009 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process NLS2009010, License Amendment Request to Revise Nonconservative Battery Resistance Technical Specification Surveillance Requirements2009-03-11011 March 2009 License Amendment Request to Revise Nonconservative Battery Resistance Technical Specification Surveillance Requirements ML0829107682008-10-13013 October 2008 Cooper Nuclear Station - License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML0830302502008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Environmental Report, Figure 2.1-1 - Figure 2.3.3 ML0830302462008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Appendix E, Environmental Report ML0830302512008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Environmental Report, Figure 2.4-1 - Figure 2.12-2 ML0830302442008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Appendix D, Technical Specification Changes ML0830302362008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Cover Page ML0830302412008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Appendix a, Updated Safety Analysis Report Supplement ML0830302422008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Appendix B, Aging Management Programs and Activities ML0830302432008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Appendix C, Response to BWRVIP Applicant Action Items 2023-09-06
[Table view] Category:Technical Specification
MONTHYEARNLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2022005, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-06-16016 June 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021015, (CNS) - Technical Specification Bases Changes2021-04-16016 April 2021 (CNS) - Technical Specification Bases Changes NLS2020004, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2020-04-0101 April 2020 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules NLS2020007, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-04-0101 April 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process NLS2019020, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit Mcpr.2019-05-23023 May 2019 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit Mcpr. NLS2019022, Application for Technical Specifications Improvement to Eliminate Requirements for Hydrogen/Oxygen Monitors (TSTF-447, Rev. 1)2019-05-23023 May 2019 Application for Technical Specifications Improvement to Eliminate Requirements for Hydrogen/Oxygen Monitors (TSTF-447, Rev. 1) NLS2017048, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control2017-08-0707 August 2017 Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control NLS2017033, Technical Specification Bases Changes2017-04-0707 April 2017 Technical Specification Bases Changes NLS2016002, Application to Revise Technical Specifications to Adopt TSTF 535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2016-03-11011 March 2016 Application to Revise Technical Specifications to Adopt TSTF 535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. NLS2015040, Technical Specification Bases Changes2015-04-15015 April 2015 Technical Specification Bases Changes NLS2014028, License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications2014-07-17017 July 2014 License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications NLS2013050, Submittal of Technical Specification Base Changes2013-04-25025 April 2013 Submittal of Technical Specification Base Changes ML12319A0552012-11-21021 November 2012 Correction to Amendment No. 242 Technical Specification (TS) and Safety Evaluation, Revise TSs to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a NLS2011093, Submittal of Technical Specification Bases Changes2011-10-14014 October 2011 Submittal of Technical Specification Bases Changes NLS2010029, Technical Specifications Bases Changes2010-04-15015 April 2010 Technical Specifications Bases Changes NLS2008091, Technical Specification Bases Changes for Time Period from 03/15/2007 Through 09/04/20082008-10-13013 October 2008 Technical Specification Bases Changes for Time Period from 03/15/2007 Through 09/04/2008 ML0830302442008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Appendix D, Technical Specification Changes NLS2008002, License Amendment Request to Revise Technical Specification 3.7.3, Reactor Equipment Cooling System2008-03-24024 March 2008 License Amendment Request to Revise Technical Specification 3.7.3, Reactor Equipment Cooling System NLS2008009, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448-A, Revision 3, Using the Consolidated Item Improvement Process2008-01-14014 January 2008 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448-A, Revision 3, Using the Consolidated Item Improvement Process ML0722803152007-08-10010 August 2007 Cooper - License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2007032, SSP-07/405-C, Rev. 1, Gardel BWR - Power Distribution Uncertainties, Enclosure 52007-05-11011 May 2007 SSP-07/405-C, Rev. 1, Gardel BWR - Power Distribution Uncertainties, Enclosure 5 NLS2007036, Technical Specification Bases Changes2007-04-30030 April 2007 Technical Specification Bases Changes NLS2006042, License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation2006-06-16016 June 2006 License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation ML0722803162006-05-0404 May 2006 Cooper, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Cycle 24 (GNF-A Report No. eDRF-0000-0046-6413), Enclosure 2 ML0612304672006-05-0202 May 2006 Technical Specifications Inoperability of Snubbers NLS2006010, Request for Exemption from Certain Requirements of 10 CFR 50, Appendix J and Corresponding Change to Technical Specifications 5.5.12, Primary Containment Leakage Rate Testing Program, Cooper Nuclear Station2006-03-15015 March 2006 Request for Exemption from Certain Requirements of 10 CFR 50, Appendix J and Corresponding Change to Technical Specifications 5.5.12, Primary Containment Leakage Rate Testing Program, Cooper Nuclear Station ML0601706232005-10-27027 October 2005 Tech Spec Pages for Amendment 212 Revision of the Required Channels Per Trip System for Primary and Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation NLS2005061, Letter to Provide Changes to Plant Technical Specification Bases Implemented Without NRC Approval2005-07-25025 July 2005 Letter to Provide Changes to Plant Technical Specification Bases Implemented Without NRC Approval NLS2004088, Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports2004-11-22022 November 2004 Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports NLS2004099, License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio2004-10-25025 October 2004 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2004122, License Amendment Request to Revise the Required Channels Per Trip System for Primary and Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation2004-10-25025 October 2004 License Amendment Request to Revise the Required Channels Per Trip System for Primary and Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation ML0425100922004-09-0101 September 2004 Tech Spec Page for Amendment 206 Regarding LOCA Dose Methodology and Resolution of Remaining License Condition 2.C.(6) NLS2004007, License Amendment Request - One-Time Extension of Surveillance Requirements2004-01-30030 January 2004 License Amendment Request - One-Time Extension of Surveillance Requirements NLS2004005, License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves Figures 3.4.9-1, 3.4.9-2, and 3.4.9-32004-01-29029 January 2004 License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves Figures 3.4.9-1, 3.4.9-2, and 3.4.9-3 NLS2003098, Technical Specification Bases Changes2003-09-0505 September 2003 Technical Specification Bases Changes NLS2003066, License Amendment Request to Revise Technical Specification 3.5.1 to Incorporate TS Task Force (TSTF) 318 for One Low Pressure Coolant Injection (LPCI) Pump Inoperable in Each of the Two Emergency Core Cooling Systems (ECCS) Divisions2003-08-25025 August 2003 License Amendment Request to Revise Technical Specification 3.5.1 to Incorporate TS Task Force (TSTF) 318 for One Low Pressure Coolant Injection (LPCI) Pump Inoperable in Each of the Two Emergency Core Cooling Systems (ECCS) Divisions NLS2003077, License Amendment Request to Revise Technical Specification (TS) Surveillance Requirement (SR) 3.3.2.1.4 and TS Table 3.3.2.1-1 for Mathematical Symbols and Use of Allowable Values2003-08-25025 August 2003 License Amendment Request to Revise Technical Specification (TS) Surveillance Requirement (SR) 3.3.2.1.4 and TS Table 3.3.2.1-1 for Mathematical Symbols and Use of Allowable Values ML0320306102003-07-15015 July 2003 Issuance of License Amendment 200 Re. Changes to Title of Shift Supervisor to Shift Manaager and Changes Plant-Specific Titles to Generic Titles Consistent with TSTF-65, Rev. 1 NLS2003022, License Amendment Request to Revise TS Surveillance Requirements for Locked, Sealed, or Secured Secondary Containment Isolation Valves2003-07-15015 July 2003 License Amendment Request to Revise TS Surveillance Requirements for Locked, Sealed, or Secured Secondary Containment Isolation Valves NLS2002098, Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2002-09-26026 September 2002 Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process ML0213004672002-05-0909 May 2002 Tech Spec Pages, Amendment No. 191 Correction of Errors in Technical Specification ML0204500312002-02-12012 February 2002 Technical Specification Page for Correction of Typographical Error in Amendment 178 2023-09-06
[Table view] Category:Amendment
MONTHYEARNLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2022005, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-06-16016 June 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements NLS2017048, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control2017-08-0707 August 2017 Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control NLS2014028, License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications2014-07-17017 July 2014 License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML12319A0552012-11-21021 November 2012 Correction to Amendment No. 242 Technical Specification (TS) and Safety Evaluation, Revise TSs to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a NLS2008002, License Amendment Request to Revise Technical Specification 3.7.3, Reactor Equipment Cooling System2008-03-24024 March 2008 License Amendment Request to Revise Technical Specification 3.7.3, Reactor Equipment Cooling System NLS2008009, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448-A, Revision 3, Using the Consolidated Item Improvement Process2008-01-14014 January 2008 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448-A, Revision 3, Using the Consolidated Item Improvement Process ML0722803152007-08-10010 August 2007 Cooper - License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2007032, SSP-07/405-C, Rev. 1, Gardel BWR - Power Distribution Uncertainties, Enclosure 52007-05-11011 May 2007 SSP-07/405-C, Rev. 1, Gardel BWR - Power Distribution Uncertainties, Enclosure 5 ML0722803162006-05-0404 May 2006 Cooper, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Cycle 24 (GNF-A Report No. eDRF-0000-0046-6413), Enclosure 2 ML0612304672006-05-0202 May 2006 Technical Specifications Inoperability of Snubbers ML0601706232005-10-27027 October 2005 Tech Spec Pages for Amendment 212 Revision of the Required Channels Per Trip System for Primary and Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation NLS2004088, Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports2004-11-22022 November 2004 Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports NLS2004122, License Amendment Request to Revise the Required Channels Per Trip System for Primary and Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation2004-10-25025 October 2004 License Amendment Request to Revise the Required Channels Per Trip System for Primary and Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation NLS2004099, License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio2004-10-25025 October 2004 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML0425100922004-09-0101 September 2004 Tech Spec Page for Amendment 206 Regarding LOCA Dose Methodology and Resolution of Remaining License Condition 2.C.(6) NLS2004007, License Amendment Request - One-Time Extension of Surveillance Requirements2004-01-30030 January 2004 License Amendment Request - One-Time Extension of Surveillance Requirements NLS2004005, License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves Figures 3.4.9-1, 3.4.9-2, and 3.4.9-32004-01-29029 January 2004 License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves Figures 3.4.9-1, 3.4.9-2, and 3.4.9-3 NLS2003077, License Amendment Request to Revise Technical Specification (TS) Surveillance Requirement (SR) 3.3.2.1.4 and TS Table 3.3.2.1-1 for Mathematical Symbols and Use of Allowable Values2003-08-25025 August 2003 License Amendment Request to Revise Technical Specification (TS) Surveillance Requirement (SR) 3.3.2.1.4 and TS Table 3.3.2.1-1 for Mathematical Symbols and Use of Allowable Values NLS2003066, License Amendment Request to Revise Technical Specification 3.5.1 to Incorporate TS Task Force (TSTF) 318 for One Low Pressure Coolant Injection (LPCI) Pump Inoperable in Each of the Two Emergency Core Cooling Systems (ECCS) Divisions2003-08-25025 August 2003 License Amendment Request to Revise Technical Specification 3.5.1 to Incorporate TS Task Force (TSTF) 318 for One Low Pressure Coolant Injection (LPCI) Pump Inoperable in Each of the Two Emergency Core Cooling Systems (ECCS) Divisions ML0320306102003-07-15015 July 2003 Issuance of License Amendment 200 Re. Changes to Title of Shift Supervisor to Shift Manaager and Changes Plant-Specific Titles to Generic Titles Consistent with TSTF-65, Rev. 1 NLS2003022, License Amendment Request to Revise TS Surveillance Requirements for Locked, Sealed, or Secured Secondary Containment Isolation Valves2003-07-15015 July 2003 License Amendment Request to Revise TS Surveillance Requirements for Locked, Sealed, or Secured Secondary Containment Isolation Valves ML0213004672002-05-0909 May 2002 Tech Spec Pages, Amendment No. 191 Correction of Errors in Technical Specification ML0204500312002-02-12012 February 2002 Technical Specification Page for Correction of Typographical Error in Amendment 178 2023-05-03
[Table view] |
Text
Nebraska Public Power District 50.90 Always there when you need us NLS2003022 July 15, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
License Amendment Request to Revise Technical Specification Surveillance Requirements for Locked, Sealed, or Secured Secondary Containment Isolation Valves (SR 3.6.4.2.1)
Cooper Nuclear Station, Docket 50-298, DPR-46
Reference:
TSTF-45, Revision 2, "Exempt Verification of CIVs that are not Locked, Sealed, or Otherwise Secured" The purpose of this letter is for the Nebraska Public Power District (NPPD) to request an amendment to Facility Operating License DPR-46 in accordance with the provisions of 10 CFR 50.4 and 10 CFR 50.90 to revise the Cooper Nuclear Station (CNS) Technical Specifications (TS). The proposed amendment would modify TS requirements for surveillance of the status of Secondary Containment Isolation Valves and Blind Flanges (SCIVs) in Surveillance Requirement (SR) 3.6.4.2.1. This change will add a provision to exempt SCIVs that are locked, sealed, or otherwise secured in the closed position from the 31 day requirement for verifying they are in the proper position. This will lessen the burden on CNS personnel and potentially reduce the occupational dose received while performing this surveillance. The proposed change is consistent with the Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF45, Revision 2, "Exempt Verification of CIVs that are not Locked, Sealed, or Otherwise Secured."
NPPD requests NRC approval of the proposed TS change and issue of the requested license amendment by January 31, 2004. Once approved, the amendment will be implemented within 60 days.
Attachment I provides a description of the TS change, the basis for the amendment, the no significant hazards consideration evaluation pursuant to 10 CFR 50.9 1(a)(1), and the environmental impact evaluation pursuant to 10 CFR 51.22. Attachment 2 provides the proposed changes to the current CNS TS and Bases (provided for information) on marked up pages. provides the revised TS and Bases pages in final typed format.
COOPER NUCLEARSrATION Co P.O. Box 98 / Brownville, NE 68321-0098 Teephone: (402) 825-387 / Fax: (402) 825-527 www.nppd.com
NLS2003022 Page 2 of 3 This proposed TS change has been reviewed by the necessary safety review committees (Station Operations Review Committee and Safety Review and Audit Board). Amendments to the CNS Facility Operating License through Amendment 198 issued March 17, 2003, have been incorporated into this request. NPPD has concluded that the proposed change does not involve a significant hazards consideration and that it satisfies the categorical exclusion criterion of 10 CFR 51.22(c)(9). This request is submitted under oath pursuant to 10 CFR 50.30(b).
By copy of this letter and its attachments, the appropriate State of Nebraska official is notified in accordance with 10 CFR 50.91(b)(1). Copies to the NRC Region IV office and the CNS Resident Inspector are also being provided in accordance with 10 CFR 50.4(b)(1).
Should you have any questions concerning this matter, please contact Mr. Paul Fleming at (402) 825-2774.
Sincerely, Warren Vice President of Nuclear Energy
/rar Attachments cc: Regional Administrator w/ attachments USNRC - Region IV Senior Project Manager w/ attachments USNRC - NRR Project Directorate IV- 1 Senior Resident Inspector w/ attachments USNRC Nebraska Health and Human Services w/ attachments Department of Regulation and Licensure NPG Distribution w/o attachments Records w/ attachments
NLS2003022 Page 3 of 3 Affidavit STATE OF NEBRASKA )
)
NEMAHA COUNTY )
Clay C. Warren, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this correspondence on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his knowledge and belief.
(/lkJ2AA'
,91 Clay C. Warren Subscribed in my presence and sworn to before me this /5 day of 3 w 2003.
NOTARY__________________________
PUBLICA NOTARY PUBLIC
_ - I4s 1M.
NOTAR- StatEf Nebma ommPcL_ WERNER a
f d2 0 o I
NLS2003022 Attachment I Page I of 7 NPPD's Evaluation 1.0 Introduction 2.0 Description of Proposed Amendment 3.0 Background 4.0 Regulatory Requirements and Guidance 5.0 Technical Analysis 6.0 Regulatory Analysis 7.0 No Significant Hazards Consideration (NSHC) 8.0 Environmental Consideration 9.0 Precedents 10.0 References
NLS2003022 Attachment I Page 2 of 7 LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS FOR LOCKED, SEALED, OR SECURED SECONDARY CONTAINMENT ISOLATION VALVES (SR 3.6.4.2.1)
Cooper Nuclear Station, NRC Docket 50-298, DPR-46 Revised Pages 3.6-37 B 3.6-77 1.0 Introduction This letter is a request to amend Operating License DPR-46 for Cooper Nuclear Station (CNS).
The proposed change would revise the surveillance requirements of Surveillance (SR) 3.6.4.2.1 for Secondary Containment Isolation Valves and Blind Flanges (SCIVs) by adding a provision to exempt SCIVs that are locked, sealed, or otherwise secured from the 31 day position verification surveillance requirement.
2.0 Description of Proposed Amendment This proposed change will revise SR 3.6.4.2.1 to exempt locked, sealed, or otherwise secured SCIVs from the requirement to verify them closed on a 31 day basis. The proposed change is consistent with the Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-45, Revision 2, "Exempt Verification of [Containment Isolation Valves] CIVs that are not Locked, Sealed, or Otherwise Secured," (Reference 2).
The Technical Specification Bases for SR 3.6.4.2.1 will be revised to include a statement that the SR does not apply to valves and blind flanges that are locked, sealed, or otherwise secured in the closed position, since these were verified to be in the correct position upon locking, sealing, or securing.
3.0 Background The CNS Updated Safety Analysis Report Section V-3.1 indicates that Secondary Containment is designed to limit the ground level release to the environs of airborne radioactive materials resulting from a design basis fuel handling or loss of coolant accident (LOCA) so that off-site doses will be below the values stated in 10 CFR 100, and Control Room occupant doses are within the limits of General Design Criteria (GDC) 19.
NLS2003022 Page 3 of 7 SCIVs form a part of the secondary containment boundary. The function of the SCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following the postulated Design Basis Accidents (DBAs). The SCIVs help ensure that an adequate secondary containment boundary is maintained during and after an accident by minimizing potential paths to the environment. This proposed change will reduce the operator burden and potentially reduce the occupational dose received by CNS Operations personnel while conducting this surveillance.
4.0 Regulatory Requirements and Guidance Secondary Containment is designed to limit the ground level release to the environs of airborne radioactive materials resulting from a design basis fuel handling or LOCA so that off-site doses will be below the values stated in 10 CFR 100, and Control Room occupant doses are within the limits of GDC 19. The SCIVs consist of either passive devices or active (automatic) devices. Manual valves, de-activated automatic valves secured in their closed position (including check valves with flow through the valve secured), and blind flanges are considered passive devices. These passive devices are considered operable when manual valves are closed or open in accordance with appropriate administrative controls, automatic SCIVs are de-activated and secured in their closed position, and blind flanges are in place as verified by SR 3.6.4.2. 1.
The proposed change credits the fact that the SCIVs that are locked, sealed or secured were verified to be in the proper position at the time of locking, sealing or otherwise securing. This change is consistent with the NRC approved Industry/TSTF Standard Technical Specification Change Traveler, TSTF-45, Revision 2, "Exempt Verification of CIVs that are not Locked, Sealed, or Otherwise Secured."
5.0 Technical Analysis The Design Basis of the SCIVs is not affected by the proposed change to the surveillance requirements. The locked, sealed, or otherwise secured SCIVs are verified to be closed at the time they are locked, sealed, or secured and are administratively controlled to remain in the required position. Thus, exempting them from the requirement to be verified in the correct position during the 31 day surveillance will not significantly reduce the assurance that the blind flanges and valves are in the closed/correct position and will not affect the ability of these components to perform their design function.
NLS2003022 Attachment I Page 4 of 7 6.0 Regulatory Analysis Locked, sealed or otherwise secured valves and blind flanges will be exempted from the requirement that SCIVs be demonstrated operable by verification of their position under SR 3.6.4.2.1 every 31 days. The SCIVs form a part of the Secondary Containment boundary which is designed to limit the ground level release to the environs of airborne radioactive materials resulting from a design basis fuel handling or LOCA. The SCIVs are required to be operable to maintain the off-site doses below the values stated in 10 CFR 100, and Control Room occupant doses within the limits of GDC 19. The locked, sealed, or otherwise secured valves will remain operable since they were verified to be in the proper position when locking, sealing or securing them. Administrative controls govern position verification for locked, sealed or otherwise secured valves and blind flanges such that there is a very low probability that unacceptable alignment can occur.
7.0 No Significant Hazards Consideration 10 CFR 50.91 (a)(1) requires that licensee requests for operating license amendments be accompanied by an evaluation of significant hazard posed by issuance of an amendment.
Nebraska Public Power District (NPPD) has evaluated this proposed amendment with respect to the criteria given in 10 CFR 50.92 (c).
The proposed change to the Cooper Nuclear Station (CNS) Technical Specifications (TS) would add a provision to exempt locked, sealed, or otherwise secured Secondary Containment Isolation Valves and Blind Flanges (SCIVs) from the 31 day position verification surveillance requirement. This change is consistent with the Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-45, Revision 2, "Exempt Verification of [Containment Isolation Valves] CIVs that are not Locked, Sealed, or Otherwise Secured."
- 1. Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?
The proposed change does not affect the SCIV design or function. In addition, mis-positioned or failed SCIVs are not the initiator of any event. The position of a locked, sealed or secured valve and blind flange is verified at the time it is locked, sealed or secured. Further, since the change impacts only the frequency of verification of the blind flange and valve position, it does not result in any change in the response of the equipment to an accident.
Based on the above, NPPD concludes that changing the frequency for verifying the position of a locked, sealed or secured SCIV does not affect the probability or consequences of an accident previously evaluated.
NLS2003022 Attachment I Page 5 of 7
- 2. Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?
This change does not add any new equipment or result in any changes to equipment design or capabilities. This change also does not result in any changes to the operation of the plant. The position of a locked, sealed or secured blind flange and valve is verified at the time it is locked, sealed or secured. Further, since the change impacts only the frequency of verification of the blind flange and valve position, it does not result in any change in the response of the equipment to an accident.
Based on the above, NPPD concludes that changing the frequency for verifying the position of a locked, sealed or secured SCIV does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Do the proposed changes involve a significant reduction in the margin of safety?
The SCIVs are administratively controlled and their operation is a non-routine event. The position of a locked, sealed or secured blind flange and valve is verified at the time it is locked, sealed or secured. Additionally, industry experience has shown the valves are generally found to be in the correct position.
Since the change impacts only the frequency of verification of the blind flange and valve position, the proposed change will provide a similar level of assurance of correct SCIV position as the current frequency of verification.
Based on the above NPPD concludes that changing the frequency for verifying the position of a locked, sealed or secured SCIV does not involve a significant reduction in a margin of safety.
From the above discussions, NPPD concludes that the proposed amendment involves no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of"no significant hazards consideration" is justified.
8.0 Precedents Similar amendments have been granted by the NRC for Sequoyah Nuclear Plant (SQN)
Unit 1, Docket No. 50-327, License No. DPR-77, Amendment No. 271, and SQN Unit 2, Docket No. 50-328, License No. DPR-79, Amendment No. 260, dated October 24, 2001.
Provisions to exempt Primary Containment Isolation Valves that are locked, sealed or otherwise secured from the requirement to verify correct valve position in accordance with Surveillance Requirement (SR) 3.6.1.3.2 and SR 3.6.1.3.3 were incorporated into CNS Technical Specifications during the conversion to Improved Technical
NLS2003022 Attachment I Page 6 of 7 Specifications, License Amendment 178, issued July 31, 1998 (Reference 4). These provisions were based on TSTF-45, Revision I (Reference 1). TSTF-45, Revision 2, which incorporated a similar exemption for Secondary Containment Isolation Valves that are locked, sealed or otherwise secured was subsequently approved by the NRC on June 15, 1999 and included in Revision 2 to NUREG 1433, published June 2001. The proposed change to the CNS TS will make them consistent with the appropriate section of NUREG 1433, Revision 2 (Reference 6).
9.0 Environmental Consideration 10 CFR 51.22(b) allows that an environmental assessment (EA) or an environmental impact statement (EIS) is not required for any action included in the list of categorical exclusions in 10 CFR 51.22(c). 10 CFR 51.22(c)(9) identifies an amendment to an operating license which changes a requirement with respect to installation or use of a facility component located within the restricted area, or which changes an inspection or a surveillance requirement, as a categorical exclusion if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration, (2) result in a significant change in the types or significant increase in the amount of any effluents that may be released off-site, or (3) result in an increase in individual or cumulative occupational radiation exposure.
NPPD has reviewed the proposed license amendment and concludes that it meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(c), no environmental impact statement or environmental assessment needs to be prepared in connection with issuance of the proposed license changes. The basis for this determination is as follows:
I. The proposed license amendment does not involve significant hazards as described previously in the No Significant Hazards Consideration Evaluation.
- 2. This proposed change does not result in a significant change in the types or significant increase in the amounts of any effluents that may be released off-site.
The proposed license amendment does not introduce any new equipment, nor does it require any existing equipment or systems to perform a different type of function than they are presently designed to perform. NPPD has concluded that there will not be a significant increase in the types or amounts of any effluents that may be released off-site and these changes do not involve irreversible environmental consequences beyond those already associated with normal operation.
- 3. This change does not adversely affect plant systems or operation and therefore, does not significantly increase individual or cumulative occupational radiation exposure beyond that already associated with normal operation.
NLS2003022 Attachment I Page 7 of 7 10.0 References
- 1. TSTF-45, Rev. 1, "Exempt Verification of CIVs that are not locked, sealed, or otherwise secured."
- 2. TSTF-45, Rev. 2, "Exempt Verification of CIVs that are not locked, sealed, or otherwise secured."
- 3. Letter to U.S. Nuclear Regulatory Commission from J. H. Swailes (Nebraska Public Power District) dated May 6, 1998, "Proposed Change to CNS Technical Specifications, Revision A, Conversion to Improved Standard Technical Specifications."
Cooper Nuclear Station, NRC Docket 50-298, License No. DPR46
- 4. Amendment 178, July 31, 1998, Conversion to Improved Technical Specifications for the Cooper Nuclear Station
- 5. USAR V-3.1, Secondary Containment
- 6. NUREG-1433, Standard Technical Specifications General Electric Plants, BWR/4, Revision 2, June 2001
NLS2003022 Page of3 ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATIONS AND ASSOCIATED BASES REVISIONS MARKUP FORMAT COOPER NUCLEAR STATION NRC DOCKET 50-298, LICENSE DPR46 Listing of Revised Pages TS Pages 3.6-37 TS Bases Pages B 3.6-77 Note: Bases are provided for information. Following approval of the proposed TS change, Bases changes will be implemented in accordance with TS 5.5.10, Technical Specification (TS) Bases Control Program.
SCtVs 3.6.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I.
SR 3.6.4.2.1 ----- NOTES--- - ---
- 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
- 2. Not required to be met for SCIVs that are open under administrative controls.
Verify each secondary containment isolation manual valve and blind flange that istequired to be 31 days closed during accident conditions is closed ok SR 3.6.4..2.2 Verify the isolation time of each power operated In accordance automatic SCIV is within limits. with the Inservice Testing Program SR 3.6.4..2.3 Verify each automatic SCIV actuates to the 18 months isolation position on an actual or simulated actuation signal.
A'o /oe /ecd 5;A o~- Sec il"6e Amendment 180 3.6-37 318100
SCIVs B 3.6.4.2 BASES (continued) 40T l~ eOC- -a--Wor- /
SURVEILLANCE SR 3.6.4.2.1 v% W'z P;W Is REQUIREMENTS This SR verifies that ach secondary containment manual isolation valve and blind flange that iequired to be closed during accident conditions is closed. The SR helps to ensure that post accident leakage of radioactive fluids or gases outside of the secondary containment boundary is within design limits. This SR does not require any testing or valve manipulation.
Rather, it involves verification that those SCIVs in secondary containment that are capable of being mispositioned are in the correct position.
Since these SCIVs are readily accessible to personnel during normal operation and verification of their position is relatively easy, the 31 day Frequency was chosen to provide added assurance that the SCIVs are in the correct positions.
Two Notes have been added to this SR. The first Note applies to valves and blind flanges located in high radiation areas and allows them to be verified by use of administrative controls. Allowing verification by administrative controls is considered acceptable, since access to these areas is typically restricted during MODES 1, 2, and 3 for ALARA reasons. Therefore, the probability of misalignment of these isolation devices, once they have been verified to be in the proper position, is low.
A second Note has been included to clarify that SCIVs that are open under administrative controls are not required to meet the SR during the time the SCIVs are open. These controls consist of stationing a dedicated operator at the controls of the valve, who is in continuous communication with the control room. In this way, the penetration can be rapidly isolated when a need for secondary containment isolation is indicated.
SR 3.6.4.2.2 Verifying that the isolation time of each power operated automatic SCIV is within limits is required to demonstrate OPERABILITY. The isolation time test ensures that the SCIV will isolate in a time period less than or equal to that a'ssumed in the safety analyses. The isolation time and Frequency of this SR are in accordance with the Inservice Testing Pro ram. o lml.
1Yi~s e tii~e- cS, t$se AD <cf-C 5 n no% 5cs- ta&-id V'?/CC4 The
/,,4c/-e bh P? rr> ( Ek7oo, I 75 t Ief, uon /OC/h h/Iq 3 rC e41ce (continued)
Cooper B 3.6-77 March 8, 2000
NLS2003022 Page 1 of3 ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATIONS AND ASSOCIATED BASES REVISIONS FINAL TYPED FORMAT COOPER NUCLEAR STATION NRC DOCKET 50-298, LICENSE DPR-46 Listing of Revised Pages TS Pages 3.6-37 TS Bases Pages B 3.6-77 Note: Bases are provided for information. Following approval of the proposed TS change, Bases changes will be implemented in accordance with TS 5.5.10, Technical Specification (TS) Bases Control Program.
SCIVs 3.6.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 4
SR 3.6.4.2.1 ---- NOTES ----- --- ------- --------
- 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
- 2. Not required to be met for SCIVs that are open under administrative controls.
Verify each secondary containment isolation manual valve and blind flange that is not locked, 31 days sealed, or otherwise secured and is required to be closed during accident conditions is closed.
SR 3.6.4.2.2 Verify the isolation time of each power operated In accordance automatic SCIV is within limits. with the Inservice Testing Program SR 3.6.4.2.3 Verify each automatic SCIV actuates to the 18 months isolation position on an actual or simulated actuation signal.
Amendment 3.6-37
SCIVs B 3.6.4.2 BASES (continued)
SURVEILLANCE SR 3.6.4.2.1 REQUIREMENTS This SR verifies that each secondary containment manual isolation valve and blind flange that is not locked, sealed or otherwise secured and is required to be closed during accident conditions is closed. The SR helps to ensure that post accident leakage of radioactive fluids or gases outside of the secondary containment boundary is within design limits. This SR does not require any testing or valve manipulation. Rather, it involves verification that those SCIVs in secondary containment that are capable of being mispositioned are in the correct position.
Since these SCIVs are readily accessible to personnel during normal operation and verification of their position is relatively easy, the 31day Frequency was chosen to provide added assurance that the SCIVs are in the correct positions. This SR does not apply to valves and blind flanges that are locked, sealed, or otherwise secured in the closed position, since these were verified to be in the correct position upon locking, sealing, or securing.
Two Notes have been added to this SR. The first Note applies to valves and blind flanges located in high radiation areas and allows them to be verified by use of administrative controls. Allowing verification by administrative controls is considered acceptable, since access to these areas is typically restricted during MODES 1, 2, and 3 for ALARA reasons. Therefore, the probability of misalignment of these isolation devices, once they have been verified to be in the proper position, is low.
A second Note has been included to clarify that SCIVs that are open under administrative controls are not required to meet the SR during the time the SCIVs are open. These controls consist of stationing a dedicated operator at the controls of the valve, who is in continuous communication with the control room. In this way, the penetration can be rapidly isolated when a need for secondary containment isolation is indicated.
SR 3.6.4.2.2 Verifying that the isolation time of each power operated automatic SCIV is within limits is required to demonstrate OPERABILITY. The isolation time test ensures that the SCIV will isolate in a time period less than or equal to that assumed in the safety analyses. The isolation time and Frequency of this SR are In accordance with the Inservice Testing Program.
(continued)
Cooper B 3.6-77
I ATTACHMENT 3 LIST OF NRC COMMITMENTS I Correspondence No: NLS2003022 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None 4.
4 4.
4.
4.
4 4.
PROCEDURE 0.42 l REVISION 7 l PAGE 13 OF 17 l