ULNRC-06405, Submittal of Radiological Emergency Response Plan, Revision 50
ML18002A214 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 01/02/2018 |
From: | Wink R Ameren Missouri |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
Shared Package | |
ML18003B268 | List: |
References | |
ULNRC-06405 | |
Download: ML18002A214 (3) | |
Similar Documents at Callaway | |
---|---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML23354A1062023-12-20020 December 2023
[Table view]Ameren Missouri - Procedure Review Form for EIP-ZZ-COO1O Addendum G, Rev. 11, Backup EOF Checklist ML23310A0522023-10-19019 October 2023 Procedure Review Form for EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document ML23262B0052023-08-29029 August 2023 EIP-ZZ-A0066, Rev. 29 - RERP Training Program ML24002A8192023-07-25025 July 2023 EtP-ZZ-COO10 Add D, Rev 22, Dose Assessment Coordinator (DAC) Checklist ML23227A1382023-07-12012 July 2023 Procedure Review Form for EIP-ZZ-03010 App B: Above Ground Oil Storage and Use Facilities (Revision 008) ML23227A1392023-06-0909 June 2023 EIP-ZZ-A0001, Rev 23, Emergency Response Organization ML23200A2132023-06-0101 June 2023 Procedure Review Form for EIP-ZZ-00201, Addendum a, Rev. 41, Control Room Notification Flowchart ML23150A1802023-05-30030 May 2023 EIP-ZZ-00201 Addendum a, Control Room Notification Flowchart Administrative Correction Revision 040 ML23150A1862023-05-30030 May 2023 EIP-ZZ-00240 Addendum H, Revision 008, Security Coordinator Checklist Administrative Correction ML23150A1812023-05-18018 May 2023 EIP-ZZ-00201 Addendum a, Revision 040, Control Room Notification Flowchart ML23131A3882023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center - Procedure Review Form and 50.54(q) Screening Form ML23131A3812023-04-26026 April 2023 EIP-ZZ-00240 Addendum E. Health Physics Coordinator (Hpc) Checklist, Minor Revision 26 ML23131A3842023-04-26026 April 2023 EIP-ZZ-COO1O, Addendum D, Dose Assessment Coordinator (DAC) Checklist, Minor Revision 21 ML23131A3872023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center ML23088A2862023-03-23023 March 2023 EIP-ZZ-00201, Addendum C, Revision 039, EOF Notification Package ML23102A1932023-03-0808 March 2023 Procedure Review Form (Prf), Summary of Changes and Analysis to Revision 55 ML19051A1412019-02-20020 February 2019 Attachment 5: EAL Matrix from EIP-ZZ-00101 Addendum 1, Emergency Action Level Classification Matrix, Proposed Revision 009 ML19051A1402019-02-20020 February 2019 Attachment 4: Affected Pages ofEIP-ZZ-00101 Addendum 2, Emergency Action Level Technical Bases Document, Proposed Revision 016 ML19051A1392019-02-20020 February 2019 Attachment 3: Mark-ups of Callaway EAL Technical Bases Document Affected Pages ULNRC-06467, Submittal of Radiological Emergency Response Plan Appendix J, On-Shift Staffing Analysis Report, Revision 0042018-10-31031 October 2018 Submittal of Radiological Emergency Response Plan Appendix J, On-Shift Staffing Analysis Report, Revision 004 ULNRC-06424, Callaway, EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes2018-03-29029 March 2018 Callaway, EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes ULNRC-06424, Callaway, FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 0082018-03-29029 March 2018 Callaway, FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 008 ML18088B3592018-03-29029 March 2018 EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes ML18088B3602018-03-29029 March 2018 FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 008 ML18088B3612018-03-29029 March 2018 EIP-ZZ-00101 Addendum 2, Emergency Action Level Technical Basis Document, Revision 008 ULNRC-06405, Submittal of Radiological Emergency Response Plan, Revision 502018-01-0202 January 2018 Submittal of Radiological Emergency Response Plan, Revision 50 ULNRC-05922, Emergency Preparedness Communications Assessment Results Requested by NRC Ltr, Request for Information Pursuant to Title 10 of the Code Federal Regulations 50.54(f).2012-10-30030 October 2012 Emergency Preparedness Communications Assessment Results Requested by NRC Ltr, Request for Information Pursuant to Title 10 of the Code Federal Regulations 50.54(f). ML0411403362004-04-17017 April 2004 EIP-ZZ-A0066, RERP Training Program, Revision 008 ML0410407332004-04-0808 April 2004 Transmittal of Revision 39 of Emergency Plan Implementing Procedure EIP-ZZ-00201, Notifications ML0407601082004-03-0505 March 2004 Revised Epips, Including Rev. 21 to EIP-ZZ-00213 and Rev. 9 to EIP-ZZ-00226 ML0405804812004-02-23023 February 2004 Revision 22 to EIP-ZZ-A0020, Maintaining Emergency Preparedness. ML0403407022004-01-23023 January 2004 Revision 30 to EIP-ZZ-C0010, Revision 32 to EIP-ZZ-00102, and Revision 33 to EIP-ZZ-00240 ML0402107922004-01-15015 January 2004 Revision 22 to Procedure EIP-ZZ-00211, Field Monitoring. ML0336404862003-12-19019 December 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0066, RERP Training Program, Revision 007 ML0335105492003-12-11011 December 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0001 Emergency Response Organization, Revision 8 ML0335105532003-12-10010 December 2003 Revision 123 to EIP-ZZ-A0001, Appendix 1 ML0334905662003-12-0808 December 2003 Revision 0387 to EIP-ZZ-00201, Notifications, and Revision 013 to EIP-ZZ-00260, Event Closeout/Plant Recovery. ML0333700622003-11-25025 November 2003 Revision 016 to EIP-ZZ-00231, Response to Severe Thunderstorm/High Winds/Tornado Watches and Warnings ML0331600392003-11-0303 November 2003 Transmittal of Revisions to Emergency Plan Implementing Procedures for Callaway Plant ML0330001062003-10-17017 October 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-A0066, Rev. 6 ML0328804452003-10-0303 October 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-03010, Rev 103 ML0323406572003-08-15015 August 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-PR020, Revision 19 ML0323103442003-08-13013 August 2003 Revision 083 to EIP-ZZ-A0001 App 1 ML0320604792003-07-18018 July 2003 Transmittal of Emergency Plan Implementing Procedure, EIP-ZZ-A0020 ML0318201592003-06-20020 June 2003 Transmittal of Callaway Emergency Plan Implementing Procedure, EIP-ZZ-00226 ML0316401482003-06-0606 June 2003 Transmittal of Emergency Plan Implementing Procedure Revision ML0316308662003-06-0606 June 2003 Emergency Plan Implementing Procedures ML0314805162003-05-20020 May 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0001 Appendix 1, Revision 053 ML0312705212003-04-28028 April 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0001, Revision 006 ML0312705132003-04-28028 April 2003 Emergency Plan Implementing Procedure, EIP-ZZ-A0001, Revision 006 2023-08-29 Category:Letter type:ULNRC MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024
[Table view]Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06812, Submittal of 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ULNRC-06806, Submittal of Radiological Emergency Response Plan, Revision 552023-04-12012 April 2023 Submittal of Radiological Emergency Response Plan, Revision 55 ULNRC-06807, Submittal of Single Positive Test Forms2023-04-0303 April 2023 Submittal of Single Positive Test Forms ULNRC-06798, Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan2023-03-30030 March 2023 Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan ULNRC-06801, CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions2023-03-30030 March 2023 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06804, Submittal of Nuclear Property Insurance Reporting2023-03-29029 March 2023 Submittal of Nuclear Property Insurance Reporting ULNRC-06751, Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control2023-03-29029 March 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control ULNRC-06803, Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection2023-03-29029 March 2023 Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection ULNRC-06805, Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days2023-03-21021 March 2023 Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days ULNRC-06802, Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument2023-03-0909 March 2023 Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument ULNRC-06795, Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms2023-01-24024 January 2023 Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms ULNRC-06794, Submittal of Fitness for Duty Program Data for 20222023-01-24024 January 2023 Submittal of Fitness for Duty Program Data for 2022 ULNRC-06787, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015)2022-12-0808 December 2022 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06781, License Amendment Request to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2022-12-0101 December 2022 License Amendment Request to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ULNRC-06780, Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-0072022-11-30030 November 2022 Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-007 ULNRC-06772, 10 CFR 50.59 and 10 CFR 72.48 Summary Report2022-11-23023 November 2022 10 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06777, Operating Quality Assurance Manual (Oqam) Revision 362022-11-16016 November 2022 Operating Quality Assurance Manual (Oqam) Revision 36 ULNRC-06779, ULNRC-06779: Contesting of Green NCV 05000483/2022010-03, Failure to Perform Required Inservice Testing of Residual Heat Removal Heat Exchanger Pneumatically (Air) Operated Outlet and Bypass Valves2022-11-14014 November 2022 ULNRC-06779: Contesting of Green NCV 05000483/2022010-03, Failure to Perform Required Inservice Testing of Residual Heat Removal Heat Exchanger Pneumatically (Air) Operated Outlet and Bypass Valves ULNRC-06765, License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Testing Frequencies (LDCN 2020-0004)2022-11-0303 November 2022 License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Testing Frequencies (LDCN 2020-0004) ULNRC-06773, Results of Steam Generator Tube In-Service Inspection2022-11-0101 November 2022 Results of Steam Generator Tube In-Service Inspection ULNRC-06775, Submittal of Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days2022-10-27027 October 2022 Submittal of Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days ULNRC-06771, Correction to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections (LDCN 21-0013)2022-10-25025 October 2022 Correction to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections (LDCN 21-0013) ULNRC-06770, Cycle 25 Commitment Change Summary Report2022-10-19019 October 2022 Cycle 25 Commitment Change Summary Report ULNRC-06766, Correction of Text Contained in Enclosures Provided with Supplements to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014)2022-09-0808 September 2022 Correction of Text Contained in Enclosures Provided with Supplements to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014) ULNRC-06767, Presentation Information for Pre-Application Meeting Regarding New License Amendment Request for Use of Framatome Fuel Assemblies2022-09-0606 September 2022 Presentation Information for Pre-Application Meeting Regarding New License Amendment Request for Use of Framatome Fuel Assemblies ULNRC-06764, Revised Response to Request for Additional Information Regarding License Amendment Request for Adoption Off Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015)2022-09-0101 September 2022 Revised Response to Request for Additional Information Regarding License Amendment Request for Adoption Off Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06763, Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspection (LDCN 21-0013)2022-09-0101 September 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspection (LDCN 21-0013) ULNRC-06762, Submittal of Owner'S Activity Reports (OAR-1 Forms) for Cycle/Refuel 252022-08-25025 August 2022 Submittal of Owner'S Activity Reports (OAR-1 Forms) for Cycle/Refuel 25 ULNRC-06758, Union Electric Co. - Renewed Facility Operating License NPF-30, Withdrawal of License Amendment Request and Exemption Request Regarding Transition to Framatome Fuel (LDCN 22-0002)2022-08-0404 August 2022 Union Electric Co. - Renewed Facility Operating License NPF-30, Withdrawal of License Amendment Request and Exemption Request Regarding Transition to Framatome Fuel (LDCN 22-0002) ULNRC-06755, Response to Requests for Additional Information for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals2022-07-13013 July 2022 Response to Requests for Additional Information for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ULNRC-06754, Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications2022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications ULNRC-06739, Post-Audit Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505 (LDCN 20-0007)2022-06-30030 June 2022 Post-Audit Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505 (LDCN 20-0007) ULNRC-06752, Evacuation Time Estimates Report2022-06-27027 June 2022 Evacuation Time Estimates Report ULNRC-06753, Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis2022-06-23023 June 2022 Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis ULNRC-06750, Submittal of Cycle 26 Core Operating Limits Report (COLR)2022-06-13013 June 2022 Submittal of Cycle 26 Core Operating Limits Report (COLR) ULNRC-06735, Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014).2022-05-27027 May 2022 Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014). 2024-01-29 |
Text
Ameren MISSOURI Callaa Plant January 2, 201 8 ULNRC-06405 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington. DC 20555-0001 I OCfR5O.47(b) 1 OCfR5O.54(q)
Ladies and Gentlemen:
DOCKET NUMBERS 50-483 AND 72-1045 CALLAWAY PLANT tINIT 1 UNION ELECTRIC Co.
RENEWED FACILITY OPERATING LICENSE NPF-30 RADIOLOGICAL EMERGENCY RESPONSE PLAN (RERP). REVISION 50 Enclosed (as Attachment 2) is one copy of Revision 50 to the Callaway Plant Radiological Emergency Response Plan (RERP). A brief description of the changes is provided in Attachment 1, RERP Revision 050 Summary of Changes. This revision does not represent a reduction in the effectiveness of emergency preparedness for the Callaway Plant. The RERP continues to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50.54(q).
This letter does not contain new commitments. If there are any questions concerning this letter, please contact Gene Juricic at 573-676-4489 or Gerry Rauch at 573-676-8504.
Sincerely,
/
7 RogerC.Wink Manager, Regulatory Affairs JPK/
Attachments: 1. RERP Revision 050 Summary of Changes
- 2. Callaway Plant Radiological Emergency Response Plan (RERP), Revision 50 P.O. Box 620 Fulton, MO 65251 ArnerenMissouri.corn
ULNRC-06405 Januaiy 2.2018 Page 2 of 3 cc: Mr. Kriss M. Keirnedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington. TX 76011-4511 Director Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington. DC 20555-0001 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission
$201 NRC Road Steedman. MO 65077 Mr. L. Jolm Kios Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 08H4 Washington. DC 20555-0001 Senior Emergency Preparedness Analyst U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511
ULNRC-06405 January 2,201$
Page 3 of 3 Index and send hardcopy to QA file A 160.0761 Hard copy:
Certrec Corporation 6100 Western Place, Suite 1050 Foil Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via RERP tJLNRC Distribution:
F. M. Diya T. E. Herrmann B. L. Cox G. P. Rauch R. C. Wink T. B. Elwood Corporate Communications NSRB Secretary STARS ReguLatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Missouri Public Service Commission Mr. Greg Voss. REP Manager (SEMA)