ML18088B359

From kanterella
Jump to navigation Jump to search
EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes
ML18088B359
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 03/29/2018
From:
Ameren Missouri
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML18088B357 List:
References
ULNRC-06424 EIP-ZZ-00 101 Addendum 1
Download: ML18088B359 (1)


Text

Attachment I to ULNRC-06424 EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Page 1 oil Revision 008 Summary of Changes Section or Page(s) Description Step Number 4-6 Bases page Updated all of the bases page numbers to correspond with the revision of numbers the EIP-ZZ-00101 Addendum 2.

4 SU4. 1 Removed Section from Technical Specification Section.

4 SGI .1 Removed the word capability.

SGI.2 4

1l_

5A9.1 -

J Capitalized the word MODE to align with Operations standards.

4 Table S-I Replaced only if already aligned with In-Service or stand-by alignment to eliminate confusion.

+/-i Changed_Feed to feedwater. -

4 Table 5-3 Added Automatic or manually initiated to the title.

4 Table S-S jAnanged the bullets in alphabetical order.

5 RG2.l Reworded for clarity and removed reference to Level 3 and the RS2.1 corresponding fuel Pool level (2022 ft. 1.25 in.) as they added no value in the determination of the EAL.

5 RA2.3 Reworded for clarity and removed reference to Level 2 and the corresponding Fuel Pool level (203 1 ft. 1 .25 in.) as they added no value in the determination of the EAL.

5 RA3.2 Added room numbers to the two listed bulleted rooms.

5 HU3.2 Capitahzed the word MODE to align with Operations standards.

HA6.l 5 HA5.l Added room numbers to the two listed bulleted rooms.

5 Table H-I Arranged the bullets in alphabetical order.

6 CA6. I Capitalized the word MODE to align with Operations standards.

6 Table C-3 Replaced only if already aligned with In-Service or stand-by aLignment to eliminate confusion.

6 Table C-4 Added RCS to the begimiing of the 1St and 2nd row and capitalized INTACT as it is a defined term in the bases.

6j6 Arranged the bullets in alphabetical order.

7 4.2.11 Added CR 201702763 to reference section.