ULNRC-06773, Results of Steam Generator Tube In-Service Inspection

From kanterella
Jump to navigation Jump to search

Results of Steam Generator Tube In-Service Inspection
ML22305A680
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/01/2022
From: Witt T
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML22305A679 List:
References
ULNRC-06773
Download: ML22305A680 (1)


Text

Callaway Plant MISSOURI November 1, 2022 ULNRC-06773 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington. DC 20555-0001 10 CFR 50.36 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 RESULTS Of STEAM GENERATOR TUBE IN-SERVICE INSPECTION In accordance with Callaway Plant Technical Specification 5.6.10, the enclosed report provides the results ofthe most recent steam generator tube in-service inspection performed at Callaway Plant.

This report documents that the steam generator tube integrity performance criteria have been met for operating cycles 22. 23, 24. and 25 (i.e., from April 2016 to April 2022, for a duration of 4.655

( EFPY)) and that there is reasonable assurance the performance criteria will be met for the upcoming 5-cycle operating period, consisting.ofcycles 26, 27, 28, 29 and 30. not to exceed 7.2 EFPY.

This letter does not contain new commitments.

Sincerely.

Todd A. Will, Manager. Regulatory Affairs

Enclosure:

Callaway Energy Center Steam Generator Tube Inspection Report 83 15 (ounty Joac1 159 : Steedrrian. 1\I 65077 A.rrierenfs/Iissouri.corri

ULNRC-06773 November 1, 2022 Page 2 of 3 cc: Mr. Scott A. Morris Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U. S Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001

ULNRC-06773 November 1 2022 Page 3 of 3 Index and send hardcopy to QA file A160.0761 Hardcopy:

Certrec Corporation 6500 West Freeway, Suite 400 FortWorth,TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F. M. Diya B. L. Cox F. J. Bianco D. E. Farnsworth I. A. Witt T. B. Elwood K. J. Tipton J. J. Hutchison C. Richardson NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Mr. Aaron Schmidt (DNR)

Missouri Public Service Commission