ML23262B005

From kanterella
Jump to navigation Jump to search
EIP-ZZ-A0066, Rev. 29 - RERP Training Program
ML23262B005
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/29/2023
From: Michael Scott
Ameren Missouri
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
EIP-ZZ-A0066, Rev. 29
Download: ML23262B005 (1)


Text

PROCEDURE REV1EW FORM (PRF) 1.0 Initiation Initiator: Matthew Scott Date: 08/29/2()2%

Pmcedt;re Dept:

EP Doctiment #: EIP-ZZ-A0066 New Rev. #

029 (3

reqtfreLI)

Title:

RERP Training Program JYe1 of Use:

LiContinuous L3Reference Information Multiple EN/A 2O Reason for Change/Description of Change (List commitments, ( Rs, eB Change I?ecztes1s,

)ERs, P/ant AIods etc. and record nittithct*s hire.)

CR 202305778. Deleted a reference to an appendix that was deleted previously.

See SOC for more details.

(flfltiflhIPf 3.0.

Document Disposition E Temp Change QNcw l)icLnn fior Revision Ulvlinor Revision ECancellation Administrative Correction L.4-i. f 3]

//o-3 Dept. I lead or f)esigna[cdAjjwover required fo; ActininistrativeCorrections (Signature/PIN/Date) rio other sinatutes required 4.0 Interim Approval (Temp. Change Only)

Temp. Change #:

Expiration Date:

CogniLant SUpefVlSt)f (Signature/PiN/Date)

SRO (Signature/PIN/1)ate)

5.0 Comments

==

Continued:

6.0 Rc ei S and Signat ures (NOT recjuiiedfor Athfliflisfrative Corrections)

Revietix Rcquirett Pqt.4 PiN Sigitature Date C40139 Atktclzed

Preparer

_ 0 i 3fo7

/,

£j 31 t3 N/A Fechnicat Review LI Yes H No Tecimical Review L Yes LI NO Addl Review J El Yes E No AddlReview EYes ENo

üAdditionat Reviews (See Attached CA0139/orms).

Number of additional CAO 1 39s 1

Type Coordittator - PIN Signtiture Dttte CA0139 Attacheft EValidation i::

E Ycs LI No 50.59 Review ECA251OCA25 I 1 ECA25I 2 1 flN/A (p 4P4-/Z Of?]13) mnati pp (Dept. Head or Designated Approver) Is a Change Management Planrequired?

EYes ENo (IF Y[N, attach CA2773 or CA2?74)

Is a Cross-Disciplinary review required? Dyes ENo 7A)

Approval Eithe; approval must be qua//uid us PA TIP! 1? or P1 TG.1Pf? in Quattfctstei)

L:1 Senior L)irector Nticlcar Operations Approval per APA-ZZ-Ot)1t)l) E ORC is required in accordance with APA-ZZ-0009 1 LI Department Head Final Review and Approval t)RC Meeting:

Dcpt.Head Of [)csignated Appfovef t Signaturc/PIN/I)ate)

Vote Pci,ir 2 J)1OVlCieS tflt!1Ct1t)fl 11) cOlflpkti thtsform and mij hi discarded j 1 )t).f)OO 1

. 2. 5. 3 A2 I 0.1)062. 65. 6Q; 1 I )O.()t() 1 Page 1 of 2 APA-Z/-Ou 1 0 I Senior Director Nucicaf Operations tSignature/PIN/Date)

CAOt)33 Rev. 002

Reference Tracking Parent Document No.:

EIP-ZZ-A0066 ReVISIOn No.: 029 Rcfettnce Trasaction Director Item (Document, Characteristic, Director update complete Synopsis, CAR, etc.)

I A(Id Lktete initial YY j AIM 1)1)

i EIP-ZZ-AOO66APPENDIX 1, RERP I

I TRAINING PROGRAM REQUIREMENTS U

Li II LJD II El Li ii Li LJ II LI 0

11

i:

II n

[Z1 II Li LI ii El El II LI Li I

I LI El II LI LI II El U

II L

i II LI LI II uu II E1L1 ii J L I

I El El II Page 1 of 1 CA0134 Rev. 000