|
---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML23354A1062023-12-20020 December 2023 Ameren Missouri - Procedure Review Form for EIP-ZZ-COO1O Addendum G, Rev. 11, Backup EOF Checklist ML23310A0522023-10-19019 October 2023 Procedure Review Form for EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document ML23262B0052023-08-29029 August 2023 EIP-ZZ-A0066, Rev. 29 - RERP Training Program ML24002A8192023-07-25025 July 2023 EtP-ZZ-COO10 Add D, Rev 22, Dose Assessment Coordinator (DAC) Checklist ML23227A1382023-07-12012 July 2023 Procedure Review Form for EIP-ZZ-03010 App B: Above Ground Oil Storage and Use Facilities (Revision 008) ML23227A1392023-06-0909 June 2023 EIP-ZZ-A0001, Rev 23, Emergency Response Organization ML23200A2132023-06-0101 June 2023 Procedure Review Form for EIP-ZZ-00201, Addendum a, Rev. 41, Control Room Notification Flowchart ML23150A1802023-05-30030 May 2023 EIP-ZZ-00201 Addendum a, Control Room Notification Flowchart Administrative Correction Revision 040 ML23150A1862023-05-30030 May 2023 EIP-ZZ-00240 Addendum H, Revision 008, Security Coordinator Checklist Administrative Correction ML23150A1812023-05-18018 May 2023 EIP-ZZ-00201 Addendum a, Revision 040, Control Room Notification Flowchart ML23131A3882023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center - Procedure Review Form and 50.54(q) Screening Form ML23131A3812023-04-26026 April 2023 EIP-ZZ-00240 Addendum E. Health Physics Coordinator (Hpc) Checklist, Minor Revision 26 ML23131A3842023-04-26026 April 2023 EIP-ZZ-COO1O, Addendum D, Dose Assessment Coordinator (DAC) Checklist, Minor Revision 21 ML23131A3872023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center ML23088A2862023-03-23023 March 2023 EIP-ZZ-00201, Addendum C, Revision 039, EOF Notification Package ML23102A1932023-03-0808 March 2023 Procedure Review Form (Prf), Summary of Changes and Analysis to Revision 55 ML19051A1412019-02-20020 February 2019 Attachment 5: EAL Matrix from EIP-ZZ-00101 Addendum 1, Emergency Action Level Classification Matrix, Proposed Revision 009 ML19051A1402019-02-20020 February 2019 Attachment 4: Affected Pages ofEIP-ZZ-00101 Addendum 2, Emergency Action Level Technical Bases Document, Proposed Revision 016 ML19051A1392019-02-20020 February 2019 Attachment 3: Mark-ups of Callaway EAL Technical Bases Document Affected Pages ULNRC-06467, Submittal of Radiological Emergency Response Plan Appendix J, On-Shift Staffing Analysis Report, Revision 0042018-10-31031 October 2018 Submittal of Radiological Emergency Response Plan Appendix J, On-Shift Staffing Analysis Report, Revision 004 ULNRC-06424, Callaway, EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes2018-03-29029 March 2018 Callaway, EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes ULNRC-06424, Callaway, FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 0082018-03-29029 March 2018 Callaway, FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 008 ML18088B3592018-03-29029 March 2018 EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes ML18088B3602018-03-29029 March 2018 FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 008 ML18088B3612018-03-29029 March 2018 EIP-ZZ-00101 Addendum 2, Emergency Action Level Technical Basis Document, Revision 008 ULNRC-06405, Submittal of Radiological Emergency Response Plan, Revision 502018-01-0202 January 2018 Submittal of Radiological Emergency Response Plan, Revision 50 ULNRC-05922, Emergency Preparedness Communications Assessment Results Requested by NRC Ltr, Request for Information Pursuant to Title 10 of the Code Federal Regulations 50.54(f).2012-10-30030 October 2012 Emergency Preparedness Communications Assessment Results Requested by NRC Ltr, Request for Information Pursuant to Title 10 of the Code Federal Regulations 50.54(f). ML0411403362004-04-17017 April 2004 EIP-ZZ-A0066, RERP Training Program, Revision 008 ML0410407332004-04-0808 April 2004 Transmittal of Revision 39 of Emergency Plan Implementing Procedure EIP-ZZ-00201, Notifications ML0407601082004-03-0505 March 2004 Revised Epips, Including Rev. 21 to EIP-ZZ-00213 and Rev. 9 to EIP-ZZ-00226 ML0405804812004-02-23023 February 2004 Revision 22 to EIP-ZZ-A0020, Maintaining Emergency Preparedness. ML0403407022004-01-23023 January 2004 Revision 30 to EIP-ZZ-C0010, Revision 32 to EIP-ZZ-00102, and Revision 33 to EIP-ZZ-00240 ML0402107922004-01-15015 January 2004 Revision 22 to Procedure EIP-ZZ-00211, Field Monitoring. ML0336404862003-12-19019 December 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0066, RERP Training Program, Revision 007 ML0335105492003-12-11011 December 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0001 Emergency Response Organization, Revision 8 ML0335105532003-12-10010 December 2003 Revision 123 to EIP-ZZ-A0001, Appendix 1 ML0334905662003-12-0808 December 2003 Revision 0387 to EIP-ZZ-00201, Notifications, and Revision 013 to EIP-ZZ-00260, Event Closeout/Plant Recovery. ML0333700622003-11-25025 November 2003 Revision 016 to EIP-ZZ-00231, Response to Severe Thunderstorm/High Winds/Tornado Watches and Warnings ML0331600392003-11-0303 November 2003 Transmittal of Revisions to Emergency Plan Implementing Procedures for Callaway Plant ML0330001062003-10-17017 October 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-A0066, Rev. 6 ML0328804452003-10-0303 October 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-03010, Rev 103 ML0323406572003-08-15015 August 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-PR020, Revision 19 ML0323103442003-08-13013 August 2003 Revision 083 to EIP-ZZ-A0001 App 1 ML0320604792003-07-18018 July 2003 Transmittal of Emergency Plan Implementing Procedure, EIP-ZZ-A0020 ML0318201592003-06-20020 June 2003 Transmittal of Callaway Emergency Plan Implementing Procedure, EIP-ZZ-00226 ML0316401482003-06-0606 June 2003 Transmittal of Emergency Plan Implementing Procedure Revision ML0316308662003-06-0606 June 2003 Emergency Plan Implementing Procedures ML0314805162003-05-20020 May 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0001 Appendix 1, Revision 053 ML0312705212003-04-28028 April 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0001, Revision 006 ML0312705132003-04-28028 April 2003 Emergency Plan Implementing Procedure, EIP-ZZ-A0001, Revision 006 2023-08-29
[Table view] |
Text
Attachment 2 to ULNRC-06424 FIP-ZZ-OO1O1 Addendum 1, Emergency Action Level Matrix, Revision 008 8 Pages
Am eren MISSOURI Callaway Energy Center EIP-ZZ-00101 ADDENDUM 1 EMERGENCY ACTION LEVEL CLASSIFICATION MATRIX MINOR Revision 00$
Page 1 of 8 INFORMATION USE
EIP-ZZ-OOtOl ADDENDUM I Rev. 008 EMERGENCY ACTION LEVEL CLASSIFICATION MATRIX TAELE OF CONTENTS Section Page Number 1.0 PURPOSE 3 2.0 SCOPE 3 3.0 PROCEDURE INSTRUCTIONS 3
4.0 REFERENCES
7 4.1. ImplemenUng 7 4.2. Developmental 7 5.0 RECORDS 7 6.0
SUMMARY
Of CHANGES 8 Page 2 of 8 INFORMATION USE
EIP-ZZ-0010] ADDENDUM I Rev. 008 EMERGENCY ACTION LEVEL CLASSIFICATION MATRIX 1.0 PURPOSE Provide a method of consistently and accurately classifying Emergency Action Levels (EAL).
2.0 SCOPE Covers EALs at the Callaway Nuclear Power Plant.
3.0 PROCEDURE INSTRUCTIONS This document isa copy of the actual EAL Classification Matrix wall charts posted in required areas.
The wall charts are designed for Hot Conditions (RCS > 200°F) and Cold Conditions (RCS 200°F) with the left side of both charts identical for ease of use, as the Left side covers All Conditions. The following pages of this document will break the wall chart in to 3 sections for ease of reading within the constraints of a procedure type document. During an Emergency. the actual wall charts should be used.
Page 3 of $ INFORMATION USE
EW-ZZ-18001 ADDENDUM I Rev. 008 1
2 1.1:1.., I II 3
4
!IjiII. 0.
.1 5
S 6 rz==n 7 h_,soIi:ItI.tIiI 1-8 Hex Ill! I I:
l1II Ii 9 t ijijç oo ti..PttI Q]1T1]if T Tl1n o.t,.. 1.1.111.1 I Itt o.tt-t. rI,II.I I I Table F-I Fission Product Barrier Matrix FlelClod(FC)Bamsr nssnorC0000rSysIomIOCS)0.IrIsr Coohalnmrol (CM1) Banter Calrgoty Loss Poonhlal Loss Loss PoIsnIlal Inns Loss PoIonBoi Loss Lfl t H:
HOT CONDITIONS (RCS
-Its on4s-
> 2004F)
II II WAmeren CTISCoII7I Callaway EnIrgyCcool Puge 4 of 8 INFORMATION USE
EIPZZ 00101 ADDENDUM I Rex. DOS SITE AREA EMERGENCY ALERT
) UNUSUAL EVENT 1 77 LJ_.__s R
2 Li_L3__aJ_1_i SI iJ.afii 3
fl L_fl_LJ_t__J__...
1 2
I}1,II Ij.
3 H
4 6
Mfl( fl..., UallJI.!
Modes: i H 2 LIr H 6 IOEFI ,
ALL CONDITIONS CaHawal Page 5 niS INFORMATION USE
EIP-ZZ-O0l0I ADDENDUM I RIv. 008 SITE AREA EMERGENCY j UNUSUAL EVENT 1 I LcnrrIrmrcs I III I £;. *. , I I I I H-I 2
,t., IIIII,_jflm, Ca, rrcn C
I, Ca, =
41 Cl I I I,11 I tta l[l *1 i=.I=I t,,...,ltt( C I I I I IIlI Modes: I I I I I 5 I I 6 I I DEF I c COLD CONDmONS (RCS <3t)
Pie6ot8 CNFORMATION USE
EIP-ZZ-00101 ADDENDUM 1 Rev. 00$
4.0 REFERENCES
- 4. 1 1tnp1ementin 4.1 .1. EIP-ZZ-00 101. Classification of Emergencies 4.1.2. EIP-ZZ-00260. Event Closeout / Plant Recovery 4.1 .3. RERP Chapter 4
- 4. 1 .4. EAL Comparison Matrix 4.1 .5. EAL Classification Matrix 4.2. DevelopmentaL 4.2. 1. NEI 99-01. Methodology for Development of Emergency Action Levels 4.2.2. NUMARC/NESP-007 Rev. 2. Methodology for Development of Emergency Action Levels, Questions and Answers 4.2.3. NRC Regulatory Issue Summary (RIS) 2003-18, Supplement 2, Use of Nuclear Energy Institute t NFl) 99-01. Methodology for Development of Emergency Actioti Levels Revision 4. Dated January 2003 (December 12. 2005) 4.2.4. NRC Bulletin 2005-02 Emergency Preparedness and Response Actions for Security-Based Events 4.2.5. Callaway Plant Radiological Emergency Response Plan (RERP) 4.2.6. Technical Specifications B.3.9.4 4.2.7. OSP-GT-00003 Containment Closure 4.2.8. APA-ZZ-00102 EOP/OTO Writers Manual 4.2.9. Procedure Writing Manual. Callaway Nuclear Power Plant 4.2.10. ULNRC-0528l, Docket Number50-483. Callaway Plant Union Electric Co.
Application for Amendment to Facility Operating License NPF-030 Adoption of Industry Traveler TSTF-490, May 9, 2006. Attachments 1. 2. 3 and 4 4.2.11. CR 201702763, NOS Insight EP Risk Significant Planning Standard Performance Upper Tier Cause Evaluation Needed 5.0 RECORDS None Page 7 of 8 INfORMATION USE
EIP-ZZ-00l01 ADDENDUM I Rev. 00$
6.0 SU1\iMARY Of CHANGES Section or Page(s) Description Step Number 4-6 Bases page Updated all of the bases page numhei-s to correspond with the revision of numbers the EIP-ZZ-00101 Addendum 2.
4 SU4.l Removed Section from Technical Specification Section.
4 SGI.l Removed the word capability.
SGI.2 SSl.l 4 SA9.1 Capitalized the word MODE to align with Operations standards.
4 Table S-I Replaced only if already aligned with In-Service or stand-by
, alignment to eliminate confusion.
4 Table S-2 Changed feed to_Feedwater.______ -
Table S-3 Added Atitomatic or manually initiated to the title.
Table S-5 - Arranged the bLillets in alphabetical order.
5 RG2. I Retvorded for clarity and removed reference to Level 3 and the RS2.l corresponding Ftiel Pool level (2022 ft. 1.25 in.) as they added no valtie in the determination of the EAL.
5 RA2.3 Reworded for clarity and removed reference to Level 2 and the corresponding Fuel Pool level (2031 ft. 1.25 in.) as they added no value in the determination of the EAL.
5 RA3.2 Added room ntirnbers to the two listed bulleted rooms.
5 HU3.2 Capitalized the word MODE to align with Operations standards.
HA6.l 5 HA5.l Added room numbers to the two listed bulleted rooms.
5 Table H- I Arranged the bullets in alphabetical order.
6 CA6. I Capitalized the word MODE to align with Operations standards.
6 Table C-3 Replaced only if already aligned with In-Service or stand-by alignment to eliminate confusion.
6 Table C-4 Added RCS to the beginning of the l and 2nid row and capitalized INTACT as it is a defined term in the bases.
6 Table C-6 Arranged the bullets in alphabetical order.
7 4.2.11 Added CR 201702763 to reference section.
Page $ of 8 INfORMATION USE