TXX-8922, Provides Schedule for Affirming & Certifying Adequacy & Accuracy of Tech Specs,Except for Plant Sys,Accident Monitoring Instrumentation & Area Temp Monitoring.Info Re Min Flow Requirements for Containment Spray Testing Encl

From kanterella
Jump to navigation Jump to search
Provides Schedule for Affirming & Certifying Adequacy & Accuracy of Tech Specs,Except for Plant Sys,Accident Monitoring Instrumentation & Area Temp Monitoring.Info Re Min Flow Requirements for Containment Spray Testing Encl
ML20246C304
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 05/02/1989
From: William Cahill, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-89225, NUDOCS 8905090333
Download: ML20246C304 (2)


Text

R

""."""J_l2!

_ 1

"'-" """; Log # TXX-89225

_ .~" File # 10014 r C 916 Ref. # 10CFR50.36 7UELECTR/C May 2, 1989 W. J. Cahm Executive Mce President V. S. Nuclear Regulatory Commission i Attn: Document Control Desk Washington, D. C. 20555 i

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N0. 50-445 TECHNICAL SPECIFICATIONS REF: 1) Letter logged TXX-89225, dated April 14, 1989, from W. J. Cahill to the NRC j Gentlemen:

  • The referenced letter provided TV Electric's affirmation and certification regarding the adequacy and accuracy of the CPSES Unit 1 Technical Specifications with the following exceptions:

- Plant Systems (Auxiliary Feedwater flow requirements / Condensate Storage Tank volume),

- Accident Monitoring Instrumentation, and i Area Temperature Monitoring l This letter provides the schedule for affirming the above specifications. Our reviews to establish the adequacy and accuracy of the above specifications will be completed and the results submitted to the NRC by May 15, 1989.

Additionally, in response to a verbal request by Ms. Melinda Malloy of the NRC, TV Electric is providing information concerning minimum flow requirements for testing Containment Spray. A minimum flow rate of 6600 gpm is required for Containment Spray (Specification 3/4.6.2) during testing to ensure the 5800 and 7200 gpm for injection and recirculation, respectively, as required by the Final Safety Analysis Report. The flow rate of 6600 gpm is determined by calculation ME(B)-607.

i 8905090333 890502 PDR ADOCK 05000445 A PDC 400 Nonh Olive Street LB 81 Dallas. Texas 75201

.. o TXX-89225 May 2, 1989 Page 2 of 2

'If you require additional informati~o n or desire further discussions of the above subjects, do not hesitate to contact me.

Sincerely, l William J. Cahill, Jr. .

By: '

D. R. Woodlan Docket I.icensing Manager i

4 JDS/ddm l

c - Mr. R. D. Martin, Region IV .

Resident Inspectors, (CPSES) (3) i 1