TXX-4797, Forwards Rev 4 to Issue Specific Action Plans Isap III.a.1, Hot Functional Testing..., III.a.9, Receipt & Storage of Purchased Matl & Equipment & Rev 2 to VII.b.1, Onsite Fabrication. Rev 3 to Program Plan Complete

From kanterella
Jump to navigation Jump to search
Forwards Rev 4 to Issue Specific Action Plans Isap III.a.1, Hot Functional Testing..., III.a.9, Receipt & Storage of Purchased Matl & Equipment & Rev 2 to VII.b.1, Onsite Fabrication. Rev 3 to Program Plan Complete
ML20198B867
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/13/1986
From: Beck J
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM), Office of Nuclear Reactor Regulation
Shared Package
ML20198B872 List:
References
CPRT-417, TXX-4797, NUDOCS 8605220162
Download: ML20198B867 (2)


Text

- __ - _ - _ .

l

,CPRT-417 Log No. TXX-4797 FILE NO. 10068 TEXAS UTILITIES GENERATING COMPANY NKYW AY TOWER e 400 MPETH OWVE NTMEET. E N. N E e DAM.A85. TEXAN 7530 8 l

I i

May 13, 1986

.m..ouw a .c.o..u.s.

... v.c .m sit l Mr. Vincent S. Noonan Director, Comanche Peak Project Division of Licensing U. U. Iluelear Regulatory Commission Washington, D.C. 20555

SUBJECT:

COMANCllE PEAK STEAM ELECTRIC STAT 10.a SUBMITTAL OF ISSUE-SPECIFIC ACTION PLANS OF Tile COMANCHE PEAK RESPONSE TEAM (CPRT) PROGRAM PLAN

Dear Mr. Noonan:

Transmitted herewith are Comanche Peak Response Team Issue-Specific Action Plans (ISAPs) III.a.1 "llot Functional

! Testing (lift) Data Packages" (Revision 4), VII.a.9 " Receipt l and Storage of Purchased Material and Equipment", and i

VII.b.1 "Onsite Fabrication" (Revision 2). ISAPs III.a.1 and VII.a.9 are new additions to the Revision 3 Program Plan. IgAP III.a.1 should be placed behind the " Appendix C, Testing" tab and, ISAP VII.a.9 should be placed behind ISAP VII a.8 in the Revision 3 Program Plan. Also enclosed is a replacement page for the list of QA/QC ISAPs. This page should be placed immediately behind the " Appendix C, QA/QC" tab in the Revision 3 Program Plan. The er' closed Revision 2 of ISAP VII.b.1 replaces Revision I currently in Revision 3 of the Program Plan.

This submittal completes Revision 3 of the CPRT Program Plan. Should you have any questions please do not hesitate to call either John Beck or myself, i

Very truly yours, i

8605220162 860513 W. G. Counsil PDR ADOCK 05000445 A PDR By:

J

---./

L) /

_ John W. Beck Vice President WGC:tj Enclosuros

'N'9

/

A $N$\'$N$$5N $0h' Th NbN $$$$$b$$$$N $$$$$$$N$0 $ES$$$'bNY l t l

l

T QA/QC ISAPs I.d.1 QC Inspector Qualifications I.d.2 Guidelines for Administration of QC Inspector Test I.d.3 Craft Personnel Training VII.a.1 Material Traceability VII.a.2' Non-Conformance and Corrective Action System VII.a.3 Document Control VII.a.4 Audit Program and Auditor Qualification VII.a.5 Periodic Review of QA Program VII.a.6 Exit Interviews VII.a.7 Housekeeping and System Cleanliness VII.a.8 Fuel Pool Liner Documentation VII.a.9 Receipt and Storage of Purchase Material and Equipment Receiving Inspection VII.b.1 On-Site Fabrication VII,b.2 Valve Disassembly VII.b.3 Pipe Support Inspections VII b.4 Hilti Anchor Bolt Installation Vll.b.5 DELETED VII.c Construction Reinspection / Documentation Review Plan

,