TXX-4579, Advises That Implementation of ATWS Mitigating Sys Actuation Circuitry (Amsac),Per Generic Ltr 85-06,scheduled for 861201,based on NRC Approval of WCAP-10858, AMSAC Generic Design Package

From kanterella
(Redirected from TXX-4579)
Jump to navigation Jump to search
Advises That Implementation of ATWS Mitigating Sys Actuation Circuitry (Amsac),Per Generic Ltr 85-06,scheduled for 861201,based on NRC Approval of WCAP-10858, AMSAC Generic Design Package
ML20133K522
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/14/1985
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
References
GL-85-06, GL-85-6, TXX-4579, NUDOCS 8510220110
Download: ML20133K522 (1)


Text

Log # TXX-4579 TEXAS UTILITIES GENERATING COMPANY File # 10141

-vwav n,ww. . . wonni ouve wr===r i_n. .$

  • DAM.A5, TEXAN WO R 10035
  • S^JASTMAS October 14, 1985 Director of Nuclear Reactor Regulation Attention: Mr. Vince S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Comniission Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N0. 50-445 AND 50-446 RESPONSE TO GENERIC LETTER 85-06 ANTICIPATED TRANSIENTS WITHOUT SCRAM (ATWS)

Dear Mr. Noonan:

NRC Generic Letter 85-06 dated April 16, 1985 provided the quality assurance guidance for ATWS equipment that is not safety related. In addition, the letter requires Westinghouse near term operating licensees to provide the NRC with an implementation schedule fcr the ATWS Mitigating System Actuation Circuitry ( AMSAC), which will meet the requirements of 10 CFR 50.62 paragraph (c)(1). . Implementation of AMSAC at CPSES is scheduled for December 1, 1986.

Westinghouse Topical Report WCAP-10858, "AMSAC Generic Design Package",

which describes the three generic designs, was submitted to the NRC for review on July 25, 1985. Texas Utilities is a member of the Westinghouse Owners Group (WOG) and is participating in the WOG AMSAC generic design program. The December 1, 1986 date for CPSES is an estimate, based on NRC approval of the topical report. Delay of approval or revision to the topical report will necessitate a revised CPSES implementation date. If implementation is expected to occur after the issuance of a 5% power license, the NRC will be notified.

Very truly yours, G

W. G. Counsil RWH/grr g510220110851014 R e A ADOCK 05000445 C >