Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K6141990-09-17017 September 1990 Submits Documentation of 900906 Telcon Re Addl Util Candidate for Licensed Operator Generic Fundamentals Exam Section ML20059G8761990-09-10010 September 1990 Forwards Rev 8 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML20059F8461990-09-0404 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/90-22 & 50-446/90-22 on 900606-0705.Corrective action:OPT-467A Changed to Provide Addl Prerequisite Info Re Solid State Protection Sys Switch Lineup During Testing ML20059E4981990-08-31031 August 1990 Forwards Revised Radial Peaking Factor Limit Rept for Cycle 1 Per Tech Specs Through Amend 1 & ML20059E4201990-08-30030 August 1990 Forwards Objectives & Guidelines for 1990 Emergency Preparedness Exercise Scheduled for 901113 ML20028G8281990-08-29029 August 1990 Forwards Comanche Peak Unit 1 Semiannual Radioactive Effluent Release Rept,900403-0630 & ODCM TXX-9030, Forwards Endorsements 40 & 4 to Nelia Policy NF-274 & Maelu Policy M-90,respectively & Endorsements 10,11,12,13,14 & 15 to Maelu Policy MF-1311990-08-27027 August 1990 Forwards Endorsements 40 & 4 to Nelia Policy NF-274 & Maelu Policy M-90,respectively & Endorsements 10,11,12,13,14 & 15 to Maelu Policy MF-131 ML20059F4381990-08-23023 August 1990 Forwards Public Version of Revised Emergency Plan & Corporate Emergency Response Procedures,Consisting of Rev 1 to EPP-313,Rev 7 to CERP-101,Rev 7 to CERP-102 & Revised Forms.W/Dh Grimsley 900906 Release Memo TXX-9029, Responds to NRC Re Violations Noted in Insp Repts 50-445/89-57 & 50-446/89-57.Corrective Actions:Storage Facilities for Instrumentation & Control Work Packages Improved to Provide Acceptable Protection for Documents1990-08-20020 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/89-57 & 50-446/89-57.Corrective Actions:Storage Facilities for Instrumentation & Control Work Packages Improved to Provide Acceptable Protection for Documents ML20058P0571990-08-13013 August 1990 Forwards, Comanche Peak Steam Electric Station Unit 1 Control Room Simulator 10CFR55 Certification Initial Rept ML20058N2311990-08-0909 August 1990 Forwards First Half 1990 fitness-for-duty Program Performance Data,Per 10CFR26.71(d).Point of Contact for Personnel,Random Testing Program Results & Confirmed Positive Tests Summary & Mgt Summary Included in Data ML20059A5831990-08-0404 August 1990 Responds to Info Request Made During 900802 Meeting Re Inadvertent Safety Injections on 900726 & 30 & Results of 100% Power Plateau Testing TXX-9024, Provides Status of Exam Activity & Revised Completion Schedule for Portion of Exam.Util Deferred Preoperational Testing of Facility Spent Fuel Pool Cooling & Cleanup Sys Until Prior to First Off Loading of Spent Fuel1990-08-0303 August 1990 Provides Status of Exam Activity & Revised Completion Schedule for Portion of Exam.Util Deferred Preoperational Testing of Facility Spent Fuel Pool Cooling & Cleanup Sys Until Prior to First Off Loading of Spent Fuel TXX-9022, Forwards Detailed Descriptions of Changes in Amend 79 to FSAR for Comanche Peak Steam Electric Station1990-07-31031 July 1990 Forwards Detailed Descriptions of Changes in Amend 79 to FSAR for Comanche Peak Steam Electric Station TXX-9027, Responds to NRC Re Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19.Corrective Action:Specific Activity within Tech Spec Limits.No Further Corrective Action Required1990-07-30030 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19.Corrective Action:Specific Activity within Tech Spec Limits.No Further Corrective Action Required ML20055J1571990-07-27027 July 1990 Submits Info Re Replacement of Borg-Warner/Intl Pump,Inc Check Valve Swing Arms,Per .Swing Arms in ASME Code Class 2 Check Valves Will Be Replaced During First Refueling Outage ML20056A0461990-07-24024 July 1990 Requests Regional Waiver of Compliance for Containment Pressure Transmitter 1-PT-934 During Coming Outage TXX-9023, Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. No Subj Transmitters in Existence at Facility1990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. No Subj Transmitters in Existence at Facility ML20055G6351990-07-17017 July 1990 Submits Results of Remote Shutdown Panel Environ Survey ML20055F9391990-07-13013 July 1990 Advises That Operators Have Gained Significant Experience in Operating Plant Under Wide Range of Conditions & Have Demonstrated Necessary Proficiency to Safely Operate Unit ML20055F9371990-07-13013 July 1990 Submits Info Re Revised Acceptance Criteria for THERMO-LAG Fire Barrier,Per 900705 Telcon.On Exposure to Heat Flux at Surface of Barrier,Listed Mechanisms Activated.Fire Testing Demonstrates That Panels Qualified W/Variation in Thickness ML20044A7001990-06-26026 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Util Will Implement for Unit 2 Activities Performed for Unit 1 ML20044A1411990-06-20020 June 1990 Forwards Endorsements 4 & 5 to Nelia Certificate N-90, Endorsements 5 & 6 to Maelu Certificate M-90 & Endorsements 34,35,36,37,38 & 39 to Nelia Policy NF-274 ML20043H7031990-06-18018 June 1990 Discusses Mod/Rework to Auxiliary Feedwater Sys Check Valves Mfg by Bw/Ip Intl,Inc.All But One Affected Check Valve modified.Motor-driven Auxiliary Feedwater Pump Discharge Valve Check Valve Body Replaced ML20043H2181990-06-15015 June 1990 Forwards Response to 900515 Request for Addl Info on Emergency Preparedness.Ongoing Emergency Preparedness Programs Address Concerns Raised by Citizens for Fair Util Regulation ML20043G3131990-06-15015 June 1990 Forwards Addl Info Re Pressurizer Surge Line Thermal Stratification & leak-before-break Evaluation & Nonproprietary Suppl 3 to WCAP-12247, Supplementary Assessment... & Proprietary Suppl 3 to WCAP-12248 ML20043C5671990-06-0101 June 1990 Discusses Identification of Slave Relays Tested Using Alternative Methodology,Per 900402 Commitment.Encl Tabulation Identifies Test Type,Applicable Procedures & Equipment & Impact of Improper Documentation ML20043E7131990-06-0101 June 1990 Responds to NRC 900517 Notice of Violation & Imposition of Civil Penalty in Amount of $25,000.Corrective Action:Qc Mgt Counseled Level III Inspector & QC Supervisor on Importance of Good Communications W/Receipt Inspectors ML20043C4501990-05-31031 May 1990 Advises That Util Revised FSAR Section 15.1.2 & Question/ Response 32.108,per 10CFR50.59 ML20043B5471990-05-25025 May 1990 Provides Status of Facility Design & Const Activities,Per Request.Detailed Design Work Will Resume in June 1990.Const Activities Expected to Increase Signficantly by Jan 1991 ML20043B5481990-05-23023 May 1990 Provides Clarification of 890710 Commitment Re Power Ascension Program.Cooldown Portion of Remote Shutdown Test Performed During Preoperational Testing,Per FSAR & Reg Guide 1.68.2 ML20043D1711990-05-21021 May 1990 Forwards Public Version of Revised Emergency Plan Procedures,Including Rev 8 to EPP-109,Rev 7 to EPP-112,Rev 4 to EPP-116 & Rev 6 to EPP-121.W/DH Grimsley 900604 Release Memo TXX-9018, Advises of Completion of Implementation of Requirements of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety- Related Equipment1990-05-21021 May 1990 Advises of Completion of Implementation of Requirements of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety- Related Equipment ML20043B0981990-05-15015 May 1990 Forwards Radial Peaking Factor Limit Rept for Cycle 1, Containing F(Xy) Limits for All Core Planes Containing Bank D Control Rods & All Unrodded Core Planes ML20042F2851990-05-0303 May 1990 Supplemental Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. ML20042F3861990-05-0303 May 1990 Responds to NRC 900410 Ltr Re Violations Noted in Insp Repts 50-445/90-10 & 50-446/90-10 on 900206-07 & 0226-0302. Corrective Action:Memo Issued Emphasizing That Discrepancies Should Be Brought to Attention of Site Organizations ML20042F3021990-05-0202 May 1990 Responds to NRC 900402 Ltr Re Violations Noted in Insp Repts 50-445/89-23 & 50-446/89-23.Util Does Not Believe That Circumstances Described in 900402 Ltr Constitutes Violation of 10CFR50.9(a) ML20042F3051990-05-0202 May 1990 Provides Revised Response to Generic Ltr 88-17 Re Loss of DHR ML20042E4581990-04-12012 April 1990 Responds to Inconsistencies in Terminology & Labelling Identified During NRC 890118 & 19 Audit of Facility Dcrdr. Util Believes Control Room Inventory Requirement of Suppl 1 to NUREG-0737,satisfied ML20042E0701990-04-10010 April 1990 Discusses 900305 Meeting W/Nrc in Rockville,Md Re Offsite Power Availability for Automatic Switch Co Solenoids for MSIV in Event of Nonmechanistic Main Steam Line Crack in Superpipe Region ML20012F5011990-04-0303 April 1990 Forwards Corrections to 891016 Response to Emergency Diesel Generator Engine Requirements.Lengths of Two Pairs of Bolts Above Crankpin Shall Be Measured Ultrasonically Before Detensioning & Disassembly of Bolts ML20012F3221990-04-0202 April 1990 Discusses ESF Sys Slave Relay Alternate Test Methodology. Implementation Schedule for Design Mods to Relay Will Be Submitted by 900601 ML20042D8081990-03-29029 March 1990 Forwards Proposed Change to FSAR Section 13.4 Re Station Operations Review Committee.Similar Change Submitted in 900328 Ltr for Chapter 6 of Facility Tech Specs ML20012F0411990-03-28028 March 1990 Forwards marked-up Pages of Facility Draft Tech Specs & Bases (NUREG-1381) Provided W/Low Power OL ML20012E6051990-03-27027 March 1990 Forwards Endorsements 1-4 to Maelu Certificate M-90, Endorsements 1-9 to Maelu Policy MF-131,Endorsements 29-33 to Nelia Policy NF-274 & Endorsements 1-3 to Nelia Certificate N-90 ML20012E6531990-03-27027 March 1990 Provides Final Response to Reporting Requirement 2 of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to RCS, for Unit.Nde Requirements of Action 2 Not Considered Applicable to Unit ML20012E1911990-03-23023 March 1990 Forwards Comanche Peak Steam Electric Station Unit 1 Cycle 1 Startup Physics Tests Control Rod Worth Predictions Utilizing TU Electric Control Rod Swap Methodology. ML20012E1581990-03-23023 March 1990 Clarifies 880624 Response to NRC Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants. ML20012D0201990-03-19019 March 1990 Advises That Allegations Provided to NRC by Former Util Employee Unsubstantiated,Based on Investigation by Util Safeteam Organization ML20012E2181990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Util Determined That Loss of safety-related Inverters 1 or 2 Would Involve Coincidental Opening of Main Feedwater Valves 1990-09-04
[Table view] |
Text
.
Log # TXX-4556 TEXAS UTILITIES GENERATING COMPANY File # 10010 RKirWAY TOWER
- 400 NOR118 OtJVE frrREET. I.B. 5 &
WILLIAM G. COUNSIL EXECUTrwE WCE P#EusDEast Director of Nuclear Reactor _ Regulation
, Attention: Mr. Vince S. Noonan,. Director Comanche Peak Project Division of Licensing
.U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N0. 50-445 DESIGN REVIEW / QUALITY REVALIDATION (DR/QR)
PROGRAM AUDIT FOR THE CPSES DIESEL GENERATORS REF: J. W. Beck letter TXX-4501 to V. S. Noonan dated June 27, 1985
Dear Mr. Noonan:
On July 1 and 2, 1985, an audit was performed at CPSES by the NRC concerning the Design Review / Quality Revalidation (DR/QR) _ efforts for TDI diesel generators. The results of the audit were favorable in that agreement was reached by all participants on the methods for successful resolution of all audit items.
The attachment to this letter, previously sent to the NRC by the referenced letter,.provides an update of the results of Texas Utilities' evaluation of the CPSES DR/QR recommendations regarding maintenance and surveillance activities associated with the TDI diesel generators. Changes discussed during the audit in regard to the maintenance and surveillance activities are reflected in this update.
In addition to the above, further clarification is provided below concerning several DR/QR report components: *
- 1. Engine Driven Fuel Oil Pump (Component 02-445) - The DR/QR report states "al> of the seal failures to date at Comanche Peak occurred during startup when there was the greatest probability of foreign matter getting between the seal faces and causing damage and leakage".
As a clarification, seal leakage on both Unit 1 engines occurred only j during plant startup testing.
- 2. Main Bearing Shells (Component 02-3108) - Concerning the main bearing upper placement shell for Train B engine, number 10, the DR/QR report states "this bearing is 0.0003 inches over the TDI specified thickness, but the clearance for the bearing is still within the TDI 8510210131 851014 5I DR ADOCK 050 s osvssson or rxxAs trrst.trass ns.scrasc contPANY
recommend:d clearance range, and is not censidered detrimental to engine operation". As a clarification, this component was addressed
.by Failure Analysis Associates in their report SP-84-6-ll(b) of.
- 6/11/84, " Evaluation of Main Bearing Shells at Comanche Peak", thereby providing the basis for the Owners' Group conclusion that the main bearing shells at CPSES are acceptable for their intended use.
- 3. Full Flow Lube Oil Filter (Component 02-820F) - The DR/QR report references the use of a full flow lube oil filter at CPSES with a particle retention size of 10 microns. In regard to the above, CPSES mechanical maintenance work orders C850002134 and C850002136 dated 7/24/85 document the installation of these filters for both engines.
Very truly yours, T
W. G. Counsil RWH/grr Attachment
Attachment to TXX-4556 dated October 14, 1985 4
Results of Texas Utilities' Evaluation of the CPSES DR/QR
~
Recommendatio_nsRegardinika~in'tenanceandSurveillanceActivities Texas Utilities concurs with all Owners' Group recommended maintenance and surveillance activities as stated in the revised CPSES OR/QR component reports and revised maintenance matrix, with the following '
proposed modifications and/or clarifications: !
- 1) Component F-068, Intercoolers Item 2 in the revised maintenance matrix recodimends cleaning and inspection of intercooler shell and tube sides after every refueling outage. Texas Utilities concurs with the inspection interval for the tube side, however, it is proposed that the shell side be comparably inspected at a five (5) year interval, based on a lack of identified problem experience for the shell side.
- 2) Component MP-022/23 Turbochargers Item 2 in the revised maintenance matrix recommends cleaning of the turbocharger impeller and diffuser at every refueling outage.
Texas Utilities proposes as a more practical maintenance approach that the impellers and diffusers be inspected every refueling outage and cleaned if necessary.
A supplementary Phase I report on turbocharger nozzle ring assemblies has also been issued by the Owners Group (Reference 1) l which contains the following additional Utility recommendations:
, a. At any turbocharger disassembly there should be a visual inspection of nozzle ring components for any apparent damage, failure or apparent mispositioning of vanes.
Replace all affected nozzle ring components. During reassembly ensure that capscrews are properly installed with recommended pretorque,
- b. Monitor engine operation to ensure exhaust gas temperatures do not exceed those specified.
Texas Utilities will comply with the utility recommendation a) above during all turbocharger disassemblies and will perform pre-turbine exhaust temperature monitoring on a monthly basis.
- 3) Component 00-420, Lube Oil Pressure Regulating Valve Item 1 in the revised maintenance matrix recommends valve disassembly and cleaning at every outage. Texas Utilities concurs, but proposes that the interval be changed based on satisfactory industry experience with this valve. The valves for one engine will be disassembled, cleaned and inspected during the ,
first refueling outage. If no problems are identified, valve maintenance for each engine will be performed on an alternate refueling outage frequency.
- 4) Component 02-3078, Lube Oil Fittings, Internal Texas Utilities concurs with the recommendation in Item 1 to check tubing for dents or crimps at every refueling outage, however, this will be performed on accessible tubing only.
- 5) Component 02-310A u _ank, Cr shaft Item 2 in the revised maintenance matrix recommends that all crank journal diameters be measured at alternate outages. Texas Utilities proposes that a sample of main journals be measured at alternate refueling outages in order to be compatible with the established sampling frequency for the main bearing shells (see component 02-3108). TDI is in agreement with this proposal in their letter VTG-85041 of July 26, 1985.
- 6) Component 02-3108, Main Bearing Shells Item 1 in the revised maintenance matrix recommends visual and dimensional inspection of all main bearing shells for evidence of wear or misalignment at the first refueling outage and at alternate outages thereaf ter. Texas Utilities believes that the minimal problems encountered with the CPSES Unit 1 DG main bearing shells do not warrant inspection to the degree recommended by the Owners' Group. This' position is in agreement with the assessment by NRC and PNL of CPSES main bearing shell experience, as stated on pages 5.12 and 5.13 of PNL-5234 (enclosure to Reference 2). As l recommended by NRC and PNL, Texas Utilities will perform a sample inspection of two (2) highly loaded bearings per engine (bearings 5 and 6) at alternate refueling outages. Associated caps and saddles will also be checked. The need for additional inspection will be determined by the results of the initial sample inspection. Due to accessibility restrictions, inspection of bearings 1, 9, and 10 are to be performed only during an engine teardown (every 5 years). TDI is in agreement with this proposal in their letter VTG-85041 of July 26, 1985.
- 7) Component 0_2_-310C, Thrust Bearing Ring Item 2 in the revised maintenance matrix recommends a visual inspection of the thrust bearing for signs of wear or degradation concurrently with visual and dimensional main bearing shell inspections as recommended above. However, the main bearing shell inspection frequency has been modified as stated above. Texas Utilities proposes that the recommended visual inspection would be adequate if performed at a five (5) year interval (i.e., at overhauls) since a " bump check" for thrust bearing clearance will be performed at every refueling outage.
)
'8 ) Component 02-315A, Cylinder Blocks Item 1 in the revised maintenance matrix recommends a visual inspection of the cylinder block and eddy-current inspection for stud-to-stud cracks between cylinder heads and for cracks between the block edge and studs at the block ends. The recommended frequency for the inspection is prior to returning the engine to standby service after any period of operation above 50% load.
Texas Utilities agrees that surveillance of the block top surfaces to ensure the absence of stud-to-stud cracks z.nd stud-to-edge cracks is appropriate for the first cycle of operation at CPSES Unit 1, until such time as the indications found on Train A, cylinders 4R and SR and on Train B, cylinders 1R and 4R are reinspected at the first refueling outage, fature inspection requirements should be based on the results of the above inspections and on any additional information provided by the Owners' Group. This position is in agreement with PNL's position in PNL-5234. Texas Utilities proposes at this time, however, that a visual and boroscopic examination be substituted for the eddy-current technique at the same frequency of performance. Texas Utilities believes that the use of visual /boroscopic examination will result in greater engine availability and is justifiable based on the stated conservatism in the Owners' Group assessment of the CPSES block indications as " ligament cracke" and on the absence of Widmanstaetten graphite in the CPSES cylinder blocks.
The indications in the Train A right bank cylinder block are the largest found at CPSES, but the Owners' Group has concluded that they were casting induced not service induced. The smaller indications in the Train B right bank cylinder block were also determined to be casting defects (by TUGCO) and are less than 0.050 inches in depth. All of these indications are in lower stress regions of the block top than ligament cracks and are all smaller than ligament cracks.
Widmanstaetten graphite is a degenerate microstructure that reduces the strength and fatigue resistance of grey cast iron.
The Owners' Group has determined that there is no Widmanstaetten graphite present in the CPSES Unit 1 cylinder blocks.
The Owners' Group has stated in the latest Phase I report (Reference 3) that blocks which have or are assumed to have l ligament cracks and which have no Widmanstaetten graphite are capable of withstanding a LOOP /LOCA event with sufficient margin, provided no stud-to-stud or stud-to-edge cracks exist.
Furthermore, engines with such cracks can still be returned to standby service provided these cracks are less than li inches in depth from the block top. Because initiation of stud-to-stud or stud-to-end cracks occurs at the block top surface and because they propagate downward, visual surface inspection of the block top will be adequate to assure the absence of such cracks.
As required in Reference 2, Texas Utilities will also perform l routine daily visual inspections of the block and external f
surfacts during op:; rating psriods, with a more thorough monthly inspection under strong lighting (also with the engine operating).
As stated above, block indications are to be reinspected for propagation at the first refueling outage.
J~
To ensure engine availability after surveillance testing above 50%
load, Texas Utilities will maintain the engine in standby service and perform the required surface inspection of the block top within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
~
- 9) Component 02-340A, Connecting Rods CPSES is in agreement with the revised DR/QR report.
3 10) Component 02-3408, Connecting Rod Bearing Shells CPSES is in agreement with the revised DR/QR report.
I 11) Component 02-341A, Pistons ,
CPSES is in agreement with the revised DR/QR report.
- 12) Component 02-350A,_C_am Shaft Assembly, CPSES is in agreement with the revised DR/QR report.
- 13) Component 02-380A, Exhaust Manifold Item I in the revised maintenance matrix recommends magnetic particle examination of a sample of circumferential pipe welds and corresponding heat affected zones at the first refueling outage and at alternate refueling outages thereafter.
l Texas Utilities proposes to visually examine all accessible welds at the frequency given above, instead of a sample.of magnetic particle tests. It is felt that this procedure would provide a more practical approach with broader weld inspection coverage.
- 14) Component 02-387A, Crankcase Vacuum Fan Item 1 in the revised maintenance matrix recommends cleaning and inspection of the fan at alternate outages. Texas Utilities proposes, as a more practical approach, that the fan be inspected at alternate refueling outages with cleaning as necessary.
- 15) Component _ 62-390E,_R,0ck_er, A_rrr. Bushings r Item 1 in the revised maintenance matrix recommends visual and dimensional inspection of intake rocker arm bushings at the outage which precedes 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> of operation by at least the sum of expected hours of operation in a LOOP /LOCA plus the expected hours of operation between outages. Similarily, exhaust rocker arm ,
bushings are to be inspected before 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> and intermediate rocker arm bushings before 730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br />.
Texas Utilities proposes to p:rform a visual inspection of all rocker arms at every refueling outage, with a visual and dimensional inspection of all rocker arm bushings every 5 years during overhaul.
- 16) Component 02_-410A, Overspeed Trip Governor CPSES is in agreement with the revised DR/QR report.
- 17) Component 02-410C, Overspeed Trip Drive Couplings Item 1 in the maintenance matrix recommends that the present L-110 Lovejoy couplings be replaced with new units at the next outage.
As a clarification, Texas Utilities does not intend to replace these couplings at the first refueling outage per the Owners Group recommendation because they were inspected and reinstalled per TDI Service Information Memorandum (SIM) 363 instructions prior to the Owners Group making their recommendations.
- 18) Component 02-413A, Governor Linkage As a clarification, Texas Utilities will install lockwire on all l fasteners designed for use with lockwire. Other locking hardware will be installed where specified.
- 19) Component 02-415A, Woodward Governor Recommended settings will be reviewed to ensure compatibility with the Texas Utilities grid system requirements, and may be adjusted accordingly.
- 20) Component 02-441B, Starting Air Strainer Item 4 in the revised maintenance matrix recommends that air start strainers be cleaned and inspected monthly. Fouling of these strainers is not expected because this portion of the system contains air which has been dried and filtered by the air dryer.
CPSES is in agreement with the revised DR/QR report. However, if no problems are identified by the first refueling outage, Texas Utilities proposes cleaning and inspecting the strainers every outage. Texas Utilities will continue to blowdown the starting air lines at the drip legs assembly daily, as recommended in the revised DR/QR report.
- 21) Component 02_-500C, Breakers & Con _ tac _t Blocks Item 3 in the revised maintenance matrix recommends that circuit breakers be trip-checked at each outage. Texas Utilities believes that breakers of the molded case type should not be tested at frequent intervals and proposes to perform this test every 5 years for this type of breaker. Other types of breakers would be tested at each refueling outage as recommended. ;
'22) Components 02-525B, C, Barring 02vice Controls & Filter Because the barring device is not required during engine operation, the Owners' Group recommendations for the associated components may not necessarily be incorporated by Texas Utilities, but will be taken into consideration.
- 23) Component 02-717C, Jacket Water Piping, Couplings, Fittings, Orifices &'T-5 trainers The DR/QR component report recommends that flanges be torqued per the general torque tables in the TDI Instruction Manual. Texas Utilities flange torquing procedure provides for greater torque than the general torque tables and will provide adequate load transfer to attaching supports.
- 24) Component 02-717G, K, Lube Oil Valv_es ,and Fuel Oil Valve _s, CPSES is in agreement with the revised DR/QR report. However, as a clarification, Item 1 of the OG maintenance matrix corresponds to 02-717K and item 2 corresponds to 02-717G. Item 1 covers the valves (relief) addressed iri the component report.
- 25) Component 02-810E, Jacket Water Heaters The Owners' Group recommends in the revised maintenance matrix that the following be performed at each outage: 1) measure heater insulation resistance, 2) inspect and clean heater elements, and
- 3) check calibration and inspect thermostat. 'However, this recommendation appears to be arbitrary in that it is not based on either a design review or on adverse component experience according to the component report. Texas Utilities believes that the activities recommended above would be adequate if performed at alternate refueling outages and intends to implement that interval.
- 26) Component 02-820A, Lube Oil Sump Tank Heaters The Owners' Group recommends that heater insulation resistance be measured and that thermostats be checked and calibrated at every outage. Based on satisfactory experience with these heaters, however, Texas Utilities proposes that these activities be performed at alternate refueling outages. The heater elements will be inspected at every refueling outage in conjunction with the tank inspection, as recommended.
- 27) Component CP-10_2_, Generator Controls CPSES is in agreement with the revised DR/QR report. ,
. 'Tha DR/QR maintenance and surveillance activities recommended by the Owners' Group are to be incorporated into the CPSES Unit I diesel generator preventive maintenance and surveillance program, as modified and/or clarified above, as follows:
Monthly and daily surveillance and maintenance items are to be incorporated into the surveillance or maintenance programs prior to exceeding 5% power at CPSES Unit 1. Items based on number of engine starts or hours of operation, as well as 18 month surveillance items, are included in this category.
Surveillance and maintenance items which are to be accomplished on a refueling outage or longer basis will be incorporated into the appropriate programs prior to the first refueling outage.
It should be noted, however, that evolution of the maintenance and surveillance program can be expected to occur based on implementation feedback, inspection results and on additional input from NRC, the.
Owners' Group, TDI or other applicable sources. Also, variations in the methods of achieving the intent of the recommendations may be necessary upon implementation in order to provide a practical approach to maintenance. Finally, the TDI inspection and maintenance forms l referenced in the " Comments" section of the maintenance matrix may or may not be used in the performance of the recommended activities.
Maintenance instructions and procedures will specify which forms are to be used, if any, for a specified activity.
REFERENCES
- 1. Letter OGTP-591-N-48 to H. R. Denton from C. L. Ray, Jr. dated November 27, 1984.
- 2. Letter to M. D. Spence from B. J. Youngblood dated October 1, 1984.
- 3. Letter 0GTP-627-N-51 to H. R. Denton from C. L. Ray, Jr. dated December 11, 1984.