RBG-33113, Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License

From kanterella
Jump to navigation Jump to search
Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License
ML20055D014
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/26/1990
From: Odell W
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-87-09, GL-87-9, RBG-33113, NUDOCS 9007030083
Download: ML20055D014 (2)


Text

_ _ - _.-_ _.

GULF STATES UTILITIES COMPJENY IJdM Bf AD STMfDN PO41 OtriCE B0* 220 $1 FRANCISvlLL1 LOIJ$ANA 7071$

A8tE A CODE T4 6)$EW 346 BtSt June 26 , 1990 RBG- 33113 File Nos. G9.5, G9.42 U. S. Nuclear Regulatory Ccnmission Docunent Control Desk Wshingtor., D.C. - 20555 ew Gentiment River Bend Station - Unit 1 Docket No. 50-458

, Gulf States Utilities (GSU) Company subnitted on September 30, 1988 (RDG-28910) an application to amend the River Bend Station -

Unit 1 'Ibchnical Specifications. This request proposed to revise specifications 3.0.4, 4.0.3 and 4.0.4 in accordance with the guidance provided in Generic Letter (GL) 87-09. Included in the 1

request was a proposed change to the bases of Specification 4.0.3 regarding the reporting requirements of 10CFR50.73 on missed surveillances. Further information was subnitted in response to a staff request, on July 17,1989 - (RBG 31258) . In a reply dated Novmber 3,1989 (RDC-39017)' the NRC staff concluded that the GSU proposed change to the bases was not acceptable.

GSU has reviewd the original wording of the bases for Specification 4.0.3 contained in Enclosure 5 to GL87-09 and accepts that wording and the reporting requirements contained

% therein. GSU requests that the GL-87-09 uording for the bases Y for Specification 4.0.3 be implennnted with the review of GSU's

' original September 30, 1988 subnittal as supplmented by GSU's June 6,1990 (RBG-32951) subnittal which provided the response to an NiC Request for Additional-Infonnation on the September 30,.

1988 subnittal.

Please contact Mr. L. L. Dietrich at (504) 381 '866 if additional information is required.

Sincerely, t i /s

.\

4 W. H. Odell

, Manager-Oversight

  • Rimr Bend Nuclear Group
  • g ,

1

/ / / 3

/

y' x4 e t

'g. Y 9007030083 900626 PDR W \'

3 3 .1 - ,.

P' ADi)CK 0500043&

%3- .) PDC f v w .n ,.

j.( f .-

. [ (f. . ( 4(\[ H i . . yh ljiI[ I-} S (1g [

.;c* .

-o : '

-:. ccI: "U. S. Nuclear Regulatory Ccmnission

'611-Ryan Plaza Drive, Suite 1000-

- Arlington, TX 76011.

Mr. Walt Paulson

. U. S. Nuclear RegulatoI'f Ccmnission One White Flint North 11555 Rockville Pike Rockville, MD 20852 NRC Resident Insp2ctor Post Office Box 1051

. St. Francisville, IA 70775 Mr. William H. Spall,- Administrator Nuclear Energy Division IInisiana Department of Environnental Quality Post Office Box 14690 Baton Rouge, IA 70898 i

i l .

,l I

=

f ,

f, k

'4:

i i 1 .!

- 1 i

s.z .

,e' g '. ].

j /' 3 .' -

(

'..~

..[ l.

' .f I

  • . : . / .; ,

l '. , gy .

.,