RBG-44924, Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check

From kanterella
Jump to navigation Jump to search
Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check
ML20204G751
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/05/1999
From: King R
ENTERGY OPERATIONS, INC.
To: Lieberman J
NRC OFFICE OF ENFORCEMENT (OE)
References
EA-98-132, RBF1-99-0060, RBF1-99-60, RBG-44924, NUDOCS 9903260262
Download: ML20204G751 (2)


Text

[ ]

  1. Enttrgy Operitions,Inc.

, River Bend Station 5485 U. R H!ghway 61 e PO t ,

?O

[

h{.g St.F. asvdle, LA 70775 L

Tel 50A 336 6225 Fax 504 635 5008 l .

i Rick J. King l Direc;or March 5,1999 Nuciear saiety & Regulatory Affans

~I James Lieberman, Director l Office of Enforcement dR U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike i Rockville, MD 20852-2738 l

SUBJECT:

EA 98-132, NRC INVESTIGATION RE" ORT 4-97-059 PAYMENT OF CIVIL PENALTY RIVER BEND STATION - UNIT I LICENSE NO. NPF-47, DOCKET NO. 50-458 1

RBF1-99-0060 RBG-44924 File Nos.: G9.5, G15.4.1 l

l

Dear Mr. Lieberman,

NRC's letter of January 5,1999, issued a Notice of Violation and proposed imposition of a civil penalty (Enforcement Action 98-132). Entergy Operations, Inc.'s, response to the Notice of Violation will be issued by March 15,1999, as extended by NRC's letter of

February 1,1999. The enclosed check for $55,000 is for payment of the civil penalty in accordance with the instmetions in the January 5,1999, letter. Payment of the civil
penalty is neither admission nor denial of the violation, as will be further discussed in our
response. If you have any questions, please contact Ms. Patricia Campbell at 225-381-

! 4615.

Sincerely, 1

i L .

' i i

l

]

l RJK/plc I Enclosure

/} g )'l)} O i

9903260262 990305 ~~

PDR ADOCK 05000458' O

.v v o. ,,, PDR -

l l

O i .;

I j EA 98-132, NRC INVESTIGATION REPORT 4-97-059 l RBF1-99-0060 l RBG-44924 March 5,1999 Page 2 of 2 CC:

U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 l . Arlington, TX 76011 Robert Fretz, Project Manager, U.S. Nuclear Regulatory Commission M/S OWFN 13-H-3 Washington, D.C. 20555 NRC Sr. Resident inspector P.O. Box 1050 St. Franc.ieville, LA 70775 U.S. Nuclear Regulatory Commission Document Control Desk, OP3-17 Washington, D.C. 20555 I

a

.