05000458/LER-1999-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1

From kanterella
Jump to navigation Jump to search
Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1
ML20206G721
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/03/1999
From: King R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206G725 List:
References
RBF1-99-0147, RBF1-99-147, RBG-44991, NUDOCS 9905100124
Download: ML20206G721 (3)


LER-2099-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1
Event date:
Report date:
4582099005R00 - NRC Website

text

Enttrgy operitions, Inc.

River Bend Station

&e' 5485 U S. Highway 61 h t. Franc 1sv e. LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J. King Director Nucioar Safety & Regulatory Affairs May 3,1999 l

l U. S. Nuclear Regulatory Commission Document Control Desk, OPI-37 l Washington, DC 20555 i

Subject:

River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 Licensee Event Report 50-458/99-005-00 File Nos. G9.5, G9.25.1.3 j RBG-44991 RBF1-99-0147 Ladies and Gentlemen:

In accordance with 10 CFR 50.73(a)(2)(i), enclosed is the subject Licensee Event Report. The commitments identified in this report are noted in Attachment 1.

Sincerely, RJK/bft attachment enclosure {

\

l

~

9905100124 990503 PDR ADOCK 05000458 8 PDR L

p, ,

1 l

l Licensee Event Report 50-458/99-005-00 May 3,1999  ;

RBO-44991

~ RBF1-99-0147 Page 2 of 2 )

cc: U. S. Nuclear Regulatory Commission Region IV .

611 Ryan Plaza Drive, Suite 400 Arlington,TX 76011 NRC Sr. Resident Inspector P. O. Box 1050 St. Francisville, LA 70775 INPO Records Center  !

E-Mail Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 Louisiana Department of Environmental Quality Radiation Protection Division P. O. Box 82135 j

Baton Rouge, LA 70884-2135 ATTN.: ' Administrator h

L

0,1' 5

l Attachment l' Commitment Identification Form

Subject:

LER 99-005-00," Standby Service Water Pump Inoperable for Greater then 30 Days" RBF1-99-0147 '

~ RBG-44991

- Date: May 3,1999 I

s l

Commitment One-time Continuing Action

  • Compliance
  • River Bend Station will evaluate additional or attemate X methods for verifying spring status for this type of breaker. RBS will then identify Operations procedure changes necessary to implement the methods.

The River Bend Training department will perform an X i analysis to determine if applicable training programs '

should be revised to include the proper methods for determining closure mechanism status and alternate methods for determining breaker spring status.

River Bend Station will include this event in Industry X Events Training for operators to reinforce standards and expectations regarding maintaining a questioning attitude during operating activities.

  • Check Only One I

l l

L