05000458/LER-1999-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1

From kanterella
Jump to navigation Jump to search
Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1
ML20206P097
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/10/1999
From: King R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206P103 List:
References
RBF1-99-0152, RBF1-99-152, RBG-45009, NUDOCS 9905180146
Download: ML20206P097 (3)


LER-2099-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1
Event date:
Report date:
4582099007R00 - NRC Website

text

Enttrgy operations, Inc.

t River Bend Station

, 6485 U S Highway 61 t Fra c sv e. L.A 70775

' Tel 225 336 6225 Fax 225 635 6068 Rick J. King Deector Nuclear Salety & Regulatory Affa'rs l May 10,1999 1

i U. S. Nuclear Regulatory Commission Document Control Desk, OPl-37 i

Washington, DC 20555

Subject:

River Bend Station - Unit 1 l

Docket No. 50-458 l License No. NPF-47 j Licensee Event Report 50-458/99-007-00 i File Nos. G9.5, G9.25.1.3 RBG-45009 RBF1-99-0152 Ladies and Gentlemen:

In accordance with 10CFR50.73, enclosed is the subject Licensee Event Report. The commitments identified in this report are noted in Attachment 1.

i Sincerely, i

l RJK/RMM i attachment f enclosure j\

/,hg,

/

/

9905180146 990510 PDR ADOCK 05000459 S PDR L

r Licensee Event Report 50-458/99-007-00 May 10,1999 l

RBG-45009 l RBF1-99-0152

! Page 2 of 2 cc: U. S. Nticlear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington,TX 76011 NRC Sr. Resident Inspector P. O. Box 1050 St. Francisville, LA 70775 INPO Records Center E-Mail Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 Louisiana Department of Environmental Quality Radiation Protection Division P. O. Box 82135 Baton Rouge, LA 70884-2135 ATTN.: Administrator 1

l l

l .-

l ,

Licensee Esent Report 50-458/99-007-00

, May 10,1999 .

RBG-45009 RBF1-99-0152 Attachment 1 Commitment Identification Form COMMITMENT ONE-TIME CONTINUING ACTIONS

  • COMPLIANCES
  • Expectations for the review of clearances will be X clarified and communicated to the staff. This will include the types of reviews required and specific approval responsibilities.

Lessons learned from this event will be communicated X to operations personnel. This will include a summary of the event, insights gained from the subsequent investigation, and associated management expectations.

l Operations will review the requirements for X incorporating lessons learned stemming from field implementation of clearances into the tagging i database. Process changes will be made to ensure l adequate controls are in place. l l

1 i i l

l I

i I

l 1 ,

L- J