RBG-26068, Updates Util 870326 Response to WR Butler Re Activities Supporting Plant First Refueling Outage.Encl List Provides Schedules for Identified Activities Requiring NRC Action

From kanterella
(Redirected from RBG-26068)
Jump to navigation Jump to search
Updates Util 870326 Response to WR Butler Re Activities Supporting Plant First Refueling Outage.Encl List Provides Schedules for Identified Activities Requiring NRC Action
ML20215B660
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/09/1987
From: Booker J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RBG-26068, NUDOCS 8706170397
Download: ML20215B660 (5)


Text

'

d

. . I T.k 9 GULF STATES UTILITIES COMPANY RIVER BENO STATION POST Of RCE BOX 220 ST FRANCISVILLC LOUISIANA 70776 ARE A CODE 504 636 6094 346-801 .;

)

1 June 9, 1987 RBG- 26068 File No. G9.5 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 i

Gentlemen:

River Bend Station - Unit I Docket No. 50-458 ,

i This letter updates Gulf States Utilities Company's (GSU) March 26, 1987 letter (RBG-25559) which responded to a letter from Mr. W. R. Butler, dated February 25, 1987, regarding activities in support of the River Bend Station (RBS) first refueling outage. The enclosed attachments provide the current expected schedules for identified activities which require NRC staff action to support the' RBS first refueling outage.

This information is intended to be a comprehensive listing of currently identified activities. Should additional activities require special attention prior to startup following the first refueling outage, GSU will promptly notify the NRC-Staff RBS Project Manager.

Your efforts in support of the attached listing of related activities-is appreciated. If additional information is required, please contact Mr.

Eddie R. Grant, Director - Nuclear Licensing, at (504) 381-4145.

i Sincerely,  !

l J. E. Booker Manager-River Bend Oversight River Bend Nuclear Group ,

JEB/ ERG / /je Attachments 617 97 BQ6N5e CW 0 o

PDR k Ok e 9  :

l

1 ATTACHMENT 1

I. License Condition (LC) Items i

LC 2.C(1) - Attachment 1 )

i Item 2a, Fuel Bldg. St.mpling System Complete l Package to T.egion IV for review Provided 5-20-87. j Item 3a, Load Han611ng Capability Test Complete- j Package to Region IV for review. Provide by 7-30-87 j Item 4a, HVAC Chiller Control Valves._ l Package to Region IV for review Provide During RF1 Item 4b, Verify adequete communications - Submitted 4-22-87 '

i Package to Region IV for review RBG-25800 (IR 87-04)

Provide additional information. Provide by 7-15-87 LC 2.C(5)b - Mark III Containment Related Issues ---

Submitted to NRC via RBG-24131 on 7-31-86 SER Issued NRC Approval Needed by End of RF1 LC 2.C(6) - Inservice Inspection (ISI) Program Last Submittal to NRC via RBG-25452 on 3-10-87 NRC Approval Needed Need by 9-14-87 LC 2.C(8) - TDI Diesel Engine requirements ---

I Last Submittal to NRC via RBG-24487 on 9-26 I NRC Approval Needed SER Issued R 9ubmit LC Revision Submittal by 6-L0-87 LC 2.C(9) - Ultimate Heat Sink Temperature Monitoring Submittal and Possible Tech Spec Revision for Staff Review Submittal by 6-30-87 Need by end of RF1 LC 2.D(14) - Attachment 5 Item 2 - R.G. 1.97 Neutron Flux Instrumentation Submi'ttal by 6-30-87 Delay to RF2 Need by RF1 LC 2.C(15) Salem ATWS Event Generic Letter 83-28 Submittal by 9-30-87 J

I.

II. Technical Specification Change Requests i

A. Required to Support RF1 l

i APRM Frequency SER Issued i RBG-25368 Scram Discharge Volume Instrumentation Submitted 1-28-87 REG-25277 Supplement Required Submitted 4-16-87  ;

SER Issued Drywell Bypass Leakage

1. 4.0.2 Applicable SER Issued RBG-25278
2. Surveillance frequency Submitted 3-10-87 RBG-25461 Need by 9-10-87 SRV Accoustical Monitoring Submitted 3-10-87 i RBC-25461 Need by 9-1-87 Supplement Required Submittal by 6-08-87 1 Leak Rate Testing Submitted 3-10-87 RBG-25461 Need by 8-3-87 Supplement Required Submittal by 6-08-87 {

Hydrogen Mixing Submitted 3-10-87 l RBG-25461 Need by 7-30-87  !

ADS Submitted 3-18-87 RBG-25505 Need by 8-14-87 Supplement Required Submittal by 6-08-87 Drywell Condensate Flow Monitor Submitted 3-18-87 RBG-25505 Need by 9-4-87 Msin Steam Line-H1 Rad Monitors Submitted 5-11-87 Need by 9-3-87 Main Steam Line-Hi Flow Monitors Submitted 5-15-87 Need by 8-21-87 Reactor Water Low Level Inrtrumentation Submitted 5-11-87 Need by 8-15-87 PVLCS Submitted 5-11-87 Need by 9-3-87 ECCS Integrated Testing Submitted 5-11-87 Need by 8-15-87

Reactor Vessel Steam Dome - H1' Press Submitted 5-15-87 Need by 8-14-87 ECCS/ ADS Trip Submitted 5-15-87 Need by 8-24-87 ATWS (10CFR50.62) Submittal by 7-30-87 Need by End of RF1 l

Reload Changes Submittal by 8-1-87 l Need by End of RF1 Section 6 - Engineering Expert M N -Shift Subreittal by 6-19-87 Water Shielding Above Active Fuel Subnletal by 7-5-87  !

Neod by 9-14-87 1 B. Others - Not Required for RF1 l

Suppression Pool Pumpback Submitted !'-10-86 RBG-24358 l

Control Rod Block Submit' a1 by 6-15-87 Settlement Monitoring Submittal by 6-15-87 i

First Stage Turbine Pressure Submittal by 7-15-87 Fire Protection (Generic Letter 86-10) Submittal by 6-19-87 Diesel Generator Action Statement Submittal by 6-26-87 Administrative Controls Submittal by 6-19-87 Main Steam Line Area Temperature Submitted 6-05-87 RBG-26059 6 l

Drywell Average Temperature Submitted 6-05-87 I RBG-26059 I Leak Detection Isolation Actuation Instrumencation Submittal by 6-15-87 i

Main Steam Tunnel Temperature Monitoring Submitted 6-05-87 RBG-26059 '

l l

l

III Other Activities HCGG Analysis Results Status Submitted 3-31-87 & ,

3-08-87 i Supplement Required Submittal by 9-15-87 l Process Control Program Revision Submittal by 7-15-87 Data Collection Program for Containment Purge ,

Meeting With Staff 5-28-87 l Status Report Submittal by 10-15-87 i Final Staff Approval Required- Need 3 mos. Post RF1 )

l Containment Venting Evaluation Report Meeting with Staff 5-28-87 .l Evaluation Submittal ' Submittal by 8-15-87 i SPDS HED Status Report Submittal by 7-31-87 l

Inservice Testing (IST) Program Relief Requests i for Pump and Valve j SSER Section 3.9.6 j NRC Approval Needed Need by 8-29-87 i l

Instrument Setpoint Methodology Report Submittal by 8-29-87 E0P Meeting (Flor Charts) 6-15-87

]