June 3, 2024 MEETING

SUMMARY

LICENSEES:

Vistra Operations Company, LLC Constellation Energy Generation, LLC PSEG Nuclear, LLC Susquehanna Nuclear, LLC FACILITIES:

Beaver Valley Power Station (Beaver Valley), Units 1 and 2 Calvert Cliffs Nuclear Power Plant (Calvert Cliffs), Units 1 and 2 Hope Creek Generating Station (Hope Creek), Unit 1 James A. FitzPatrick Nuclear Power Plant (FitzPatrick)

Limerick Generating Station (Limerick), Units 1 and 2 Nine Mile Point Nuclear Station (Nine Mile Point), Units 1 and 2 Peach Bottom Atomic Power Station (Peach Bottom), Units 2 and 3 R.E. Ginna Nuclear Power Plant (Ginna)

Salem Nuclear Generating Station (Salem), Units 1 and 2 Susquehanna Steam Electric Station (Susquehanna), Units 1 and 2

SUBJECT:

SUMMARY

OF PUBLIC WEBINAR MEETING - JOINT ANNUAL ASSESSMENT MEETING FOR BEAVER VALLEY, CALVERT CLIFFS, HOPE CREEK, FITZPATICK, LIMERICK, NINE MILE POINT, PEACH BOTTOM, GINNA, SALEM, AND SUSQUEHANNA STATIONS On May 22, 2024, the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar to discuss the NRCs assessment of the safety performance at operating facilities located in Pennsylvania, Maryland, New Jersey, and New York for 2023. During the first part of the webinar, the NRC staff presented the Agencys assessment of the safety performance at each facility for the period of January 1, 2023 through December 31, 2023, as described in the annual assessment letters for each site. The second part of the webinar provided members of the public the opportunity to submit questions orally or in writing regarding topics discussed during the first part of the webinar and the NRCs role in ensuring safe plant operations.

Members of the public along with Federal and State officials participated in the meeting.

is a complete list of those who participated in the webinar, which was led by Rodney Clagg (Senior Project Engineer, Division of Operating Reactor Safety), Brice Bickett (Branch Chief, Division of Operating Reactor Safety), Erin Carfang (Branch Chief, Division of Operating Reactor Safety), Jonathan Greives (Branch Chief, Division of Operating Reactor Safety), and Matthew Young (Branch Chief, Division of Operating Reactor Safety).

2 Copies of the slides used by the NRC staff during the webinar can be accessed through the NRCs Agencywide Documents Access and Management System (ADAMS) using Accession Number ML24137A188. ADAMS is accessible from the NRC Web page at:

http://www.nrc.gov/reading-rm/adams.html. The NRC staff responded to questions that were submitted through the webinar process.

The meeting notice was issued on April 18, 2024, was posted on the NRCs public webpage, and can be found in ADAMS using Accession Number ML24109A041. Additional information relevant to the NRC's annual assessment process and the safety performance of each site can be found on the NRC's website at: https://www.nrc.gov/reactors/operating/oversight.html.

Brice Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety

Enclosures:

1. NRC Annual Assessment Meeting Presentation (ML24137A188)
2. Webinar Attendee List (ML24155A030)

BRICE BICKETT Digitally signed by BRICE BICKETT Date: 2024.06.03 15:10:56 -04'00'

ML24155A199 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS NAME RClagg BBickett DATE 6/3/2024 6/3/2024