Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24009A055 | 24 January 2024 | Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications | |
ML24018A177 | 19 January 2024 | Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw | |
ML23352A059 | 9 January 2024 | Summary of December 11, 2023, Meeting with Constellation on Alternative Request Involving Carbon Fiber Reinforced Polymer Composite | |
ML23363A094 | 3 January 2024 | Summary of October 4, 2023, Pre Submittal Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Revising Technical Specification 3.7.9. Ultimate Heat Sink (UHS) | Ultimate heat sink |
ML23362A004 | 2 January 2024 | Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections | |
ML23352A382 | 19 December 2023 | Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 | |
ML23320A247 | 17 November 2023 | Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 | Probabilistic Risk Assessment |
ML23276A652 | 11 October 2023 | Pre-submittal Meeting Summary, September 14, 2023 | Exemption Request |
ML23271A268 | 5 October 2023 | September 25, 2023, Summary of with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans | Offsite Dose Calculation Manual |
ML23263B106 | 22 September 2023 | R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary | |
ML23236A513 | 31 August 2023 | Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request | |
ML23234A234 | 29 August 2023 | Summary of August 18, 2023, Meeting with Constellation Energy Generation, LLC, Related to the LAR to Relocate Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report | Pressure and Temperature Limits Report |
ML23237A269 | 25 August 2023 | Summary of the August 23, 2023 Public Outreach to Discuss the NRC 2022 End-of Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 | Open House |
ML23212A989 | 3 August 2023 | Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting | License Renewal Subsequent License Renewal |
ML23198A015 | 27 July 2023 | License Renewal Application Public Meeting Summary of Pre-Submittal Meeting | Aging Management |
ML23200A259 | 24 July 2023 | June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary | |
ML23181A061 | 30 June 2023 | Summary of the June 15, 2023 Public Outreach to Discuss the NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 | |
ML23179A001 | 28 June 2023 | 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary | |
ML23173A007 | 22 June 2023 | Summary of the Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 | Open House |
ML23173A014 | 22 June 2023 | Summary of the June 14, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 | Open House |
ML23164A211 | 14 June 2023 | Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 | Open House |
ML23156A247 | 9 June 2023 | Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 | |
ML23118A375 | 9 June 2023 | Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 | |
ML23145A035 | 31 May 2023 | Summary of May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 | |
ML23129A020 | 30 May 2023 | Summary of March 22, 2023, Closed Meeting with Constellation Energy Generation, LLC, to Discuss a Future License Amendment Request That Allows Byron Station and Braidwood Station to Utilize a New Citicality Analysis for the Spent Fuel Pools | |
ML23142A160 | 23 May 2023 | Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements | Fitness for Duty Enforcement Discretion Exemption Request COVID-19 |
ML23132A308 | 18 May 2023 | Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 | |
ML23121A002 | 12 May 2023 | Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 | |
ML23076A104 | 12 May 2023 | Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 | |
ML23076A013 | 12 May 2023 | March 15, 2023, Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 | |
ML23076A280 | 28 March 2023 | Summary of February 23, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions | Probabilistic Risk Assessment |
ML23055A035 | 24 March 2023 | Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels | |
ML23068A376 | 16 March 2023 | Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 | FLEX |
ML23030A009 | 10 February 2023 | January 10, 2023, Summary of Meeting with Constellation Energy Generation, LLC, on Planned Limerick Digital Modernization Project Installation Support License Amendment Request and Exemption Request | Exemption Request |
ML23033A666 | 9 February 2023 | Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna | |
ML23009A587 | 11 January 2023 | Summary of December 15, 2022, Meeting with Constellation Energy Generation, LLC on Potential Compliance with Certain Clauses of IEEE Standard 603-1991 in Limerick Digital Instrumentation and Controls License Amendment Requests | |
ML22346A000 | 14 December 2022 | Summary of November 3, 2022, Meeting with Constellation to Discuss Planned License Amendment Requests to Adopt TSTF-505 and 10 CFR 50.69 | Safe Shutdown High winds Probabilistic Risk Assessment FLEX Large early release frequency |
ML22327A019 | 6 December 2022 | Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests | |
ML22318A171 | 16 November 2022 | Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendment to Revise the Design Basis for Certain Suppression Pool Structures and Components | |
ML22264A199 | 14 November 2022 | Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and | Probabilistic Risk Assessment |
ML22305A599 | 10 November 2022 | Summary of Closed Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Transition to Framatome Fuel | |
ML22227A111 | 25 August 2022 | Summary of June 24, 2022, Public Observation Meeting with Constellation Energy Generation, LLC Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions | Probabilistic Risk Assessment Large early release frequency |
ML22187A146 | 6 July 2022 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary | |
ML22168A192 | 24 June 2022 | Summary of May 3, 2022, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions | Probabilistic Risk Assessment |
ML22159A223 | 9 June 2022 | Summary of the June 2, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2 | Open House |