MONTHYEARML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 Project stage: Other ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment Project stage: Other ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) Project stage: Request PMNS20240898, Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-07-0808 July 2024 Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Meeting ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 Project stage: Request ML24206A1782024-07-29029 July 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System Project stage: Meeting ML24270A2612024-10-17017 October 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom, Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System Project stage: Meeting ML24302A2422024-10-29029 October 2024 ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides Project stage: Meeting ML24325A5532024-11-21021 November 2024 Summary of October 29, 2024, Public Observation Meeting with Constellation Energy Generation, LLC Regarding Peach Bottom Atomic Power Station, Units 2 & 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System EPID L- Project stage: Meeting ML24325A5702024-11-22022 November 2024 ECCS Compensated Level System Replacement Project, Constellation Pre-submittal Meeting Slides November 22, 2024 (EPID L-2024-LRM-0009) Public Project stage: Meeting ML24344A2272024-12-12012 December 2024 Summary of Partially Closed Observation Meeting with Constellation Energy Generation, LLC Regarding Peach Bottom Atomic Power Station, Units 2 and 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System Project stage: Meeting 2024-12-12
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24351A0822024-12-19019 December 2024 Summary of November 7, 2024, Meeting with Constellation Energy Generation on Planned Alternative Requests Regarding Reactor Vessel Closure Studs (L-2024-LRM-0114) ML24344A2272024-12-12012 December 2024 Summary of Partially Closed Observation Meeting with Constellation Energy Generation, LLC Regarding Peach Bottom Atomic Power Station, Units 2 and 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System ML24325A5532024-11-21021 November 2024 Summary of October 29, 2024, Public Observation Meeting with Constellation Energy Generation, LLC Regarding Peach Bottom Atomic Power Station, Units 2 & 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System EPID L- ML24270A2612024-10-17017 October 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom, Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24206A1782024-07-29029 July 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto ML20016A3472020-01-30030 January 2020 Summary of December 12, 2019, Category 2 Public Meeting on Lessons Learned from the Review of the First Subsequent License Renewal Applications ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19273B9692019-10-0202 October 2019 September 12, 2019 - Public Meeting to Discuss Draft Supplement 10, Second Renewal, to the Generic EIS for License Renewal of Nuclear Plants Regarding Peach Bottom Atomic Power Station Units 2 and 3 SLRA (EPID: L-201-RNW-0013) ML19238A3032019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Exelon'S Response to NRC Requests for Additional Information on Environmental Fatigue ML19240A3002019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Questions on Their Coatings and Linings of Certain Components Aging Management Program and Their Inspection of Buried and Underground Piping and Tanks Aging Management Program for SLR ML19246A1452019-09-27027 September 2019 Clarification Call to Discuss Exelons Response to NRC Requests for Additional Information (RAI) 3.3.2.1.1-1 MN 19-006, Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary2019-07-0909 July 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary ML19191A1882019-07-0909 July 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML19149A3312019-05-31031 May 2019 Summary of Teleconference with Exelon Generation Company, LLC, Regarding Submittal of a Potential License Amendment Request Related to the Implementation of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML19114A2642019-04-30030 April 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding Submittal of a Potential License Amendment Request Related to Replacement of Buried Electrical Cables at Peach Bottom Atomic Power Station, Units 2 and 3 ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18299A0292018-10-24024 October 2018 Summary of Teleconference with the Fws Regarding Endangered Species Act Section 7 for Peach Bottom Subsequent License Renewal ML18289A5092018-10-18018 October 2018 Summary of Meeting for Environmental Review of Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application ML18268A0632018-10-0303 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Submittal of Potential License Amendment Request Related to High Pressure Service Water System at Peach Bottom Atomic Power Station, Units 2 and 3 ML18229A1222018-09-17017 September 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding the Response to the 2nd Round of Request for Additional Information (RAI) Questions at Peach Bottom Atomic Power Station, Units 2 and 3 (Pbaps) ML18152A9862018-06-12012 June 2018 Summary of May 31, 2018, Meeting with Exelon Generation Company, Llc Regarding the Potential License Amendment Request to Increase the Number of Power Level Steps for the Use of Lefms at Peach Bottom Atomic Power Station, Units 2 and 3 (PBA ML18151A1632018-06-0404 June 2018 Summary of Peach Bottom Annual Assessment Meeting and Attendee List ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report 2024-07-29
[Table view] |
Text
December 12, 2024 LICENSEE:
Constellation Energy Generation, LLC FACILITY:
Peach Bottom Atomic Power Station, Units 2 and 3
SUBJECT:
SUMMARY
OF NOVEMBER 22, 2024, PARTIALLY CLOSED OBSERVATION MEETING WITH CONSTELLATION ENERGY GENERATION, LLC REGARDING PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DIGITAL UPGRADE OF THE EMERGENCY CORE COOLING SYSTEM COMPENSATED LEVEL SYSTEM (EPID L-2024-LRM-0009)
On November 22, 2024, the U.S. Nuclear Regulatory Commission (NRC) staff held a partially closed observation meeting with Constellation Energy Generation, LLC (Constellation, the licensee) at NRC Headquarters in Rockville, Maryland. The purpose of the meeting was for Constellation and the NRC staff to discuss a proposed license amendment request (LAR) regarding a digital instrumentation and controls upgrade to the emergency core cooling system (ECCS) compensated level system for Peach Bottom Atomic Power Station, Units 2 and 3 (Peach Bottom). The meeting notice and agenda, dated November 15, 2024, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML24326A047. The enclosure to this summary contains a list of attendees. The licensee prepared presentation slides which are available in ADAMS at ML24325A570.
During the meeting, Constellation discussed a proposed schedule for the planned LAR, including the planned time frame for supplemental information. The licensee confirmed that the only supplement currently planned is the equipment qualification test report summary. The licensee discussed the changes to the facility with the LAR including expanded maintenance and diagnostic testing. The NRC staff requested that the licensee include in its application, the architecture of the monitoring and tuning system with its diagnostic features. Continuing the discussion on changes to the plant interface, the NRC staff asked who is providing the cabinets and the Curtiss-Wright representative responded that Curtiss-Wright will be supplying the cabinets. The licensee mentioned that there will be no changes to Peach Bottoms technical specifications.
The NRC staff asked Constellation to explain their evaluation using the process described in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.59 Changes, tests, and experiments which allows licensees to make changes to their facility without prior NRC approval. The licensee responded that because they are making changes to a structure, system, or component (SSC) that affects the design function of the SSC, they screened into the 50.59 process. Evaluating the change against the criteria in 10 CFR 50.59(c)(2), the licensee determined that the change described in the LAR would result in more than a minimal increase in the likelihood of occurrence of a malfunction of an SSC important to safety previously evaluated in the final safety analysis report (as updated), as described in 10 CFR 50.59(c)(2)(ii).
Therefore, Constellation will be applying for a license amendment to make changes to the ECCS system.
During the discussion of deviations from the RadICS topical report, the licensee mentioned the only equipment deviation is the use of 2-meter cables instead of the 20-meter cables included in the topical report. The NRC staff asked for more information on these cables and the licensee mentioned they are manufactured by RadICS and will be commercially dedicated by RadICS as well as included in Curtiss-Wrights quality assurance (QA) program.
The NRC staff did not make any regulatory decisions at the meeting. Members of the public were in attendance. Public Meeting Feedback forms were not received. The NRC received one comment congratulating the staff on the helpfulness of dialogue throughout the meeting.
Please direct any inquiries to me at (301) 415-0805, or Rachael.Davis@nrc.gov.
/RA/
Rachael Davis, Project Manager Licensing Data Analytics, Tools, and Assessments Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosure:
List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES NOVEMBER 22, 2024, MEETING WITH CONSTELLATION ENERGY GENERATION, LLC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 Name Organization Aaron Armstrong U.S Nuclear Regulatory Commission (NRC)
Christina Antonescu NRC Clinton Hobbs NRC Deanna Zhang NRC En De Chen NRC Eric Benner NRC Fanta Sacko NRC Isaac Wang NRC Jack Zhao NRC Michael Marshall NRC Neal Sheehan NRC Rachael Davis NRC Rachel Qian NRC Samir Darbali NRC Sarah Elkhiamy NRC William Roggenbrodt NRC David Peiffer Constellation Energy Generation, LLC (Constellation)
John Hopson Constellation Pablo Guardado Constellation Preeti Furtado Constellation Steve Dragovich Constellation Stephen Flickinger Constellation John Schrage Sargent Lundy Mike Lewis Sargent Lundy Pareez Golub Sargent Lundy Rylee Runyon Sargent Lundy Marty Murphy Curtiss-Wright Michael Kosman Curtiss-Wright Robert Ammon Curtiss-Wright Alfred Hyde Member of the public - Dominion Energy Mary Miller Member of the Public - Dominion Energy
Package: ML24345A031 Meeting Notice: ML24326A047 Meeting Summary (Non-Proprietary): ML24344A227 Meeting Slides: ML24325A570 OFFICE NRR/DORL/LDATA/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC(A)
NAME RDavis KEntz HGonzález (RGuzman for)
DATE 12/6/2024 12/11/2024 12/12/2024