ML20237H572
| ML20237H572 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/19/1987 |
| From: | Alexion T Office of Nuclear Reactor Regulation |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20237H575 | List: |
| References | |
| NUDOCS 8708250070 | |
| Download: ML20237H572 (2) | |
Text
, _ _ - - _ _
AUG 191987 i
c-Docket No. 50-483
, DISTRIBUTION:
iDocket. Files STAlexion NRC PDR
'0GC-Bethesda l
Local PDR EJordan PDIII-3 r/f JPartlow Mr. Donald F. Schnell DWigginton ACRS(10)
Vice President - Nuclear GHolahan Union Electric Company PKreutzer l
Post Office Box 149 l
St. Louis, Missouri 63166 l
i
Dear Mr. Schnell:
SUBJECT:
CALLAWAY - FIRST 10-YEAR INSERVICE TESTING PROGRAM The NRC staff has completed its review of the first 10-year inservice testing l
(IST) prcgram at Callaway. The review encorn,assed the initial submittal of l
January 31, 1984 and subsequent revisions up to arid including the April 14, j
1987 revision.
1 Based on the review of the Callaway IST program and relief requests, the staff concludes that the IST program will provide reasonable assurance of the operational readiness of the pumps and valves covered by the IST program to perform their safety-related functions. All relief requests are granted with the exception of relief request numbers P03 and P09, where interim relief is granted until June 1, 1988, and relief request number V02 which is only l
partially granted.
A copy of the related Safety Evaluation is enclosed.
Sincerely, O
Thomas W. Alexion, Project Manager Project Directorate III-3 Division of Reactor Projects i
Enclosure:
As stated cc: See next page l
l I
i Office:
LA/PDIII-3 PM/P I I-3
/[dv 1
PD 'MIII-3 Surname: PKrAbMer TAlexion/tg DWigginton Date:
08/ g /87 08/}/87 08//0 /87 08/6/87 1
r
/
\\l 8708250070 870819
'p DR ADOCK 0500 3
C________________
l
.c.
t l
l Mr. D. F. Schnell Callaway Plant i
Union Electric Company Unit No. 1 CC:
J. O. Cermak, CFA Inc.
Mr. Barth D. Withers l
4 Professional Dr., Suite 110 President and Chief Gaithersburg, MD 20879 Executive Officer Wolf Creek Nuclear Operating l
Gerald Charnoff, Esq.
Corporation Thomas A. Baxter, Esq.
P. O. Box 411 l
Shaw, Pittman,-Potts & Trowbridge Burlington, Karsas 66339 l
C300 N Street, N. W.
Washington, D. C.
20037 Mr. Dan I. Bolef, President i
Kay Drey, Representative l
Mr. G. L. Randolph Board of Directors Coalition General Manager, Operations for the Environment Union Electric Company St. Louis Region Post Office Box 620 6267 Delmar Boulevard Fulton, Missouri 65251 University City, Missouri 63130 U. S. Nuclear Regulatory Commission i
f Resident Inspectors Office RR#1 Steedmen, Missouri 65077 Mr. Donald W. Capone, Manager Nuclear Engineering Union Electric Compary Post Office Box 149 St. Louis, Missouri 63166 Chris R. Rogers, P.E.
Manager - Electric Department 301 W. High t
Post Office Box 360 Jefferson City, Missouri 65102 Regional Administrator U. S. NRC, Region'III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P. O. Box 176 Jefferson City, Missouri 65102 e