NRC MONTHLY OPERATING REPORT
- DOCKET NO. 50-361 j
\
UNIT SONGS - 2 DATE September 15, 1987 l COMPLETED BY E. R. Siacor TELEPHONE D14) 368-6223 OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generating Station, Unit 2
- 2. Reporting Period: August 1987
- 3. Licen:ed Thermal Power (MWt): 3390
- 4. Nameplate Rating (Gross MWe): 1127
- 5. Design Electrical Rating (Net MWe): 1070
- 6. Maximum Dependable Capacity (Gross MWe): 1127
- 7. Maximum Dependable Capacity (Net MWe): 1070
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA a
- 9. Power Level To Which Restricted, If Any (Net MWe): NA l
- 10. Reasons For Restrictions, If Any: _ NA l This Month Yr.-to-Date Cumulative i
- 11. Hours In Reporting Period 744.00 5,831.00 35,400.00
- 12. Number Of Hours Reactor Was Critical 674.67 5,670.60 25,031.75
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 672.42 5,638.17 24,515.68
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 12 808,278.80 18,282,350.30 79,103,772.80
- 17. Gross Electrical Energy Generated (MWH) 681,568.50 6,227,213.50 26,643,008.00
- 18. Net Electrical Energy Generated (MWH) 646,569.00 _5,938,769.00 25,224,174.55
- 19. Unit Service Factor 90.38% 96.69% 69.25%
- 20. Unit Availability Factor 90.38% 96.69% 69.25%
- 21. Unit Capacity Factor (Using MDC Net) 81.22% 95.19% 66.59%
- 22. Unit Capacity Factor (Using DER Net) 81.22% 95.19% 66.59%
- 23. Unit Forced Outage Rate .
_0.00% 1.47% 4.57%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Cycle 4 Refueling OutjLge 2 August 29, 1987 now in progress, 80-day duration
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: Nov. 17, 1987
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY ,_ NA- NA COMMERCIAL OPERATION NA NA 8709210186 870831 m0 7435u/3 PDR ADOCK 05000361 PDR
/f R
I
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0. 50-361 UNIT SONGS - 2 DATE september 15, 1987 .
COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 ..
MONTH August 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1100.42 _
17 954.38 \
2 1099.67 18 936.58 3 1098.17 19 909.46 4 1094.29 20 895.00 5 1080.29 21 886.54 6 1063.58 22 882.08 7 1024.50 23 868.50 8 1000.63 24 876.88 9 1035.13 25 873.96 10 1027.71 26 870.58 11 1006.17 27 867.83 12 1004.58 28 687.13 ".
13 988.29 29 0.00 7 14 976.96 30 0.00 15 955.29 31 0.00 16 953.33 7435u/4
9 1 u nd 3
ae hh Dr2
- o6 2 tc r
s e g
rc- er a 2ea8 to t bi6 af u mS3 e . O 1 e e rne 6Se.)
3G t v c gog g R4 i n ia n
- Nn 1 t e ntt i 0 O e' . 7 c r oau l 5S3E1 eor irO e .
3 rtu ta u 4 8
.EEYE r c cpg f 8 9 OMTBN one uen e 9 1 HAA O CoR dri R 1 -
NDDH i e pl - A T EP &tt r e 4 5 3 ET TE cn nu 0 0 KI EL eAe rif e 8 8 CN LE s v e e l OU PT u e wyR c d d D M a rP oa y t t O. C Pd4 C S S C
E E E E E E B I 4 5 t
n m e e5 .o %h n e mr 0t o d A A afh2 p o N N .r t nsi m C mcnnfir a o aSooo ul C r iM rop S cct nehx N Siasot O tuuia4(
m4 ll anote2 I
e e :aamiicr T 7 t d A A duuutvugte C 8 s o N N onntned sh U 9 y C haauorerat D 1 S tMMACPRopO E e- - - -
R T M1234 5 S
R U 3 E G W U O A R .
P E o A A n H L N N N o D T i N N t A O a M n S f i N T og 3 m WR n- r a O O din o x D P otw t E T E hto c 5 1 U R tuD a ) e )
H eh e n s n S MS R i n i T a e a l
c l I
2 p ni p N n x oL x U o E E s
a C C (t s c it& (
e ee ig r R rT rn o r) u ti l
io r snern eivEi n )
a Rai a o s i r fe rtll 0 8 c yT a a p t u 0 5 tngr rnx a o nanortoE r H 0 1 enit osi(
- u ( 7 mel atit D
- ptel ana r ninuurire o uif g e m eh
_ s q a e e pd p t 1
aEMRROAOO
- e e- - - - - - - -
_ p S S RABCDEFGH y
T 2 7 7 d e 8 e t
a 8
2 8
9 2
l du D 8 8 0 0 ed ce rh oc FS FS
- o
_ N 7 1 3 -
.v
SUMMARY
OF. OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-361 UNIT SONGS - 2 DATE september 15, 1987 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 ,
-Date Time Event ~
c, :
August 1 0001 Unit is in Mode 1 at 100% reactor power. Turbine load at 1140 MWe gross.
August 4 0401 Commenced power reduction at 1% per day for scheduled i Cycle 4 refueling outage. !
August 28 0930 Reactor. power reduction increased to greater than 20% per day in preparation for Cycle 4 refueling outage.
-August 29 0025 Main turbine tripped.
0145 Entered Mode 2.
0240 Reactor tripped. Entered Mode 3. l l
2100 Entered Mode 4.
August 30 1940 Entered Mode 5. I August 31 2400 ' Unit is in Mode 5, day 3 of Cycle 4 refueling outage.
O l
7435u/6 l l l i
_m_ . _ _ _ _ _ _ - _ _ _ _ _ _ . _ . _ _ _ _ . . _ _ - . '
i REFUELING INFORMATION
, DOCKET NO. 50-361 UNIT SONGS - 2 DATE September $5, 1987 MONTH: August 1987 COMPLETED BY E. R. Siacor TELEPHONE, (714) 368-6223 n .1. Scheduled date for next' refueling shutdown. j August 1989 l
' 2. Scheduled date for restart following refueling.
October 1989 i
'3. Will. refueling or resumption of. operation _thereafter require a Technical' Specification change or other license amendment?
i Not yet determined l What will these be?
t g Not yet determined
- 4. Scheduled date for submitting proposed licensing action and supporting information.
Not yet determined.
- 5. 'Impcrtant Licensing considerations associated with refueling, e.g. , new or different fuel design or supplier, unreviewed design or performance
. analysis methods, significant changes in fuel. design, new operating procedures. ;
Not yet determined
- 6. The number.of fuel assemblies.
a) In the core. 217 i
b) In the spent fuel storage pool. 160 irradiated fuel, I 59'new fuel f
- 7. Licensed spent fuel storage capacity. 800 Intended change in spent fuel storage capacity. Under Review
- 8. Projected'date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 1997 (refueling only)
Approximately 1993 (full offload capability) ,
i 7435u/7 i l
l
~
l NRC MONTHLY OPERATING REPORT I DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE lentember 15. 1987 COMPLETED BY E.~R. Siacor a TELEPHONE ,(714) 368-6223 J OPERATING STATUS
- 1. . Unit.Name: ' San Onofre Nuclear Generating Station, Unit 3
'2. ' Reporting Pe Ro~d: . August 1987
- 3. Licensed Thermal Power (MWt): 3390
- 4. Nameplate Rating (Gross MWe): 1127
- 5. ' Design Electrical Rating (Net MWe): 1080 6: Maximum Dependable Capacity (Gross MWe): 1127
- 7. Maximum Dependable Capacity (Net MWe): 1080
-8. If.C.b5 ges Occur In Capacity Ratings (Items Number 3 Through 7)
NS ast. Report, Give Reasons:
, _ _ NA
- 9. Power Level To Which Restricted, If Any (Net MWe): NA
- 10. ' Reasons For Restrictions,-If Any: NA
..-~e -
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.00 5,831.00 29,951.00
- 12. Number Of Hours Reactor Was Critical 744.00__ 4,225.57 20,838.25 j
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 4,093.65 19,979.98
- 15. Unit' Reserve Shutdown Hours 0.00 0 lio 0.00 16 .' Gross Thermal Energy Generated (MWH) 2,505,525.04 13,447,566.68 59,851,352.02
- 17. Gros;, Elec.trical Energy Generated (MWH) 854,808.50 4,577,019.00 20,139,253.50
- 18. Net Electrical Energy Generated (MWH) 813,559.00 4,329,743.05 18,897,679.47
- 19. Unit Service Factor 100.00% 70.20% 66.71%
- 20. Unit Availability Factor 100.00% 70.20% 66.71%
- 21. Unit Capacity Factor (Using MDC Net) 101.25% 68.75% 58.42%
'22. Unit Capacity Factor (Using DER Net) 101.25% 68.75% 58.42%
- 23. Unit Forced Outage Rate 0.00% 2.33% 10.62%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 7435u/8
g-L AVERAGE" DAILY . UNIT POWER LEVEL
'L
- DOCKET NO. 50-362 1
i UNIT SONGS - 3 4
OATE September 15, 1987 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 i
MONTH August 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)- .(Kde-Net)
, 1 1104.42 17 1084.92 2 1104.92- 18 1106.21 3- '1104.50~ 19 1108.00 l
.4 1104.50 20 1104.17 5 1103.38 21 1092.63 _
6 1100.21 22 1059.46 l 1
-7 -1092.25 23 1097.96 J 8 1097.92 24 1103.88 ;
1 9 1097.17 25 1103.08 10 1098.13 25 1102.29 11 1096.96 27 1103.75 12 1099.42 28 1099.00 13 1102.88 29 1099.79 14 1097.25 30 1099.25 15' 924.13 31 1104.50 16 1101.42 7435u/9 L
=_________ _ l
3ea8 bi6 2 - mS3 6S e 1 t
1GN p R4 1
0Oe 7 5SbE(
.CEYE e e oNTBN v c NAA O i n NDDH t e T EP c r ET TE e r Ki EL r u 3 CN LE roc 4 8 OU PT ote 8 9 D M C R 9 1 O n 1 -
C &ot - A in 5 3 ete 0 0 scv 8 8 uAe a r d d C P A t t N S S E E E E E E I I 4 5 m e
.o %h mr 0t afh2
.r t n mcnnfir a aSooo r iM r S t cct nehx N n Siasot E O e tuuia4(
l anote2 I
T 7 n5 o e
- laamiicr duuotvugte C 8 p d A onntned U
D 9 m o N haauorer at 1 o C t M M A C P R o p E C e- - - - -
R T M1234 5 S
R U 3 E G m4 W U e e O A t d A P s o N n H y C o D T S i N N t A O a M A n S R . N i N T E o m W R L N a O O x D P E T E U R f - ) e )
H og 3 n s n S ~ n r i n i din o a e a T otw t l c l I
hto c A p ni p N tuD a N x oL x U eh e E E MS R (t s
it&
c
(
2 ee ig r n rT rn or o u ti s l r snern i o eivEi a A a Rai e N Fe rtlI R c yT a a p tngr rnx n )
nanortoE o s enitosi(
i r mel atit
- ptel ana r t u A ninuurire a o N ouifgeraeh r H s q a e e pd p t u ( aEMRROAOO D e- - - - - -
RABCDEFGH 1
2 e
p A y N T d l
e e du t A ed a N ce D rh oc FS fS o A N N 1 i
. 7. _ _ _ _ _
SUMMARY
OF OPERATING ' EXPERIENCE FOR' THE -MONTH DOCKET NO. 50-362 VNIT SONGS - 3 DATE september 15, 1987 COMPLETED BY E.'R. Siacor TELEPHONE (714).368-6223 Date Time Event August 1 0001 Unit is in Mode 1 at 100% reactor power.
Turbine load at 1151 MWe gross.
August 15 005 Commenced power reduction for heat treating of intake structure.
0500 Reactor at 80% power.
1825 . Commenced power increase,following completion of heat treating operation.
2230 Reactor at 100% power. Turbine load at 1151' MWe gross.
4 August 31- '2400 Unit is in Mode 1 at 100% reactor power.
Turbine load at 1153 MWe gross.
7435u/11
, 1 l
l l
l l
e
~
M REFUELING ' INFORMATION '
, DOCKET NO. 50-362' UNIT SONGS - 3 DATE september 15, 1987 MONTH: JAugust 1987 . COMPLETED ~BY E. R. Siacor
' TELEPHONE (714) 368-6223
~
- 1. Scheduled date for next refueling shutdown' .
. June 1988
- 2. Scheduled date for restart following refueling.
August-1988
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or_ other license amendment?
Not:yet determined i
What will these'be? 'l Not yet determined i
- 4. Scheduled'date for submitting proposed licensing action and supporting
. i n format.i on.
Not yet determined Important Licensing considerations associated with. refueling, e.g. , new or different fuel design or supplier, unreviewed design or performance analysis methods,'significant changes in fuel design, new operating procedures.
Not yet determined' I
- 6. The number of fuel assemblies, a) In the core. 217 b) In the spent fuel storage pool. 160
- 7. Licensed spent fuel storage capacity. 800 Intended change in spent fuel storage capacity. Under Review
^
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 1997 (refueling only)
Approximately 1993 (Full offload capability) 7435u/12
l
,np((":2 ,
.9..
} Southem Califamla Edison Company SAN ONOFRE NUCLEAR GENERATING STATION P O. BOX 128 SAN CLEMENTE, CALIFORNI A 92672 H.E. MORGAN TE W HONE ST A MON MANAGER 4 I ' *' '
September 15, 1987 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361/50-362 Monthly Operating Reports for August 1987 San Onofre Nuclear Generating Station, Units 2 and 3 Enclosed are the Monthly Operating Reports as required by Section 6.9.1.10 of Appendix A, Technical Specifications to Facility Operating Licenses NPF-10 and NPF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively.
Please contact us if we can be of further assistance.
A e ly,
/lEN0p
~
Enclosures cc: J. B. Martin (Regional Administrator, USNRC Region V)
F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3)
Institute of Nuclear Power Operations (INPO)