ML20217C519

From kanterella
Jump to navigation Jump to search
Forwards Emergency Response Procedures Including Rev 7 to ERP-C-1300,rev 2 to ERP-C-1300-1,rev 2 to EPR-C-1300-3,rev 1 to ERP-C-1300-6,rev 5 to ERP-C-1320 & Rev 2 to ERP-C-1320-1.Computer Generated Rept Index,Encl
ML20217C519
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 04/16/1998
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217C523 List:
References
NUDOCS 9804230347
Download: ML20217C519 (1)


Text

Ettlin tupport Deprrtment

-

PECO NUCLEAR mco r, c.,

$ $ $ $ *"d A Unit of PECO Energy I

April 16,1998 j l

Docket Nos. 50-277 I l

50-278 50-352 50-353 l

License Nos. DPR-44 DPR-56 l NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 l Limerick Generating Station, Units 1 and 2 l Common Nuclear Emergency Plan l Emergency Response Procedure Revisions I

Dear Sir / Madam:

i l Enclosed are the following emergency response procedure revisions to the Common Nuclear Emergency Plan (EP) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, and Limerick Generating Station (LGS), Units 1 and 2. These procedures are required to be submitted within thirty (30) days of their revision in accordance with the requirements of 10CFR50, Appendix E, and 10CFR 50,4.

. ERP-C-1300, Rev.7, " Emergency Operations Facility (EOF) Dose Assessment Team Leader."

. ERP-C-1300-1, Rev. 2, " Dose Assessment Team Leader Initial Actions."

  • ERP-C-1300-3, Rev. 2," Protective Action Recommendation Worksheet."

. ERP-C-1300-6, Rev.1," Dose Assessment Group initial Actions."

e ERP-C-1320, Rev. 5, " Emergency Operations Facility (EOF) Field Survey Group Leader."

. ERP-C-1320-1, Rev. 2," Field Survey Group Leader Initial Actions."

Also enclosed is a copy of a computer generated report index identifying the latest revisions of the emergency response procedures for the Common Nuclear EP.

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, l

G rrett D. Edwards I Director - Licensing \\

Enclosures * ' L U *$ "[ _

cc: H. J. Miller, Administrator, Region I, USNRC (w/ enclosures,2 copies)

A. C. McMurtray, USNRC Senior Resident Inspector, PBAPS (w/ enclosures) l A. L. Burritt, USNRC Senior Resident inspector, PBAPS (w/o enclosures) 9804230347 980416 PDR ADOCK 05000277 F PDR