MONTHYEARML16341D1311999-10-15015 October 1999 Discusses Arrangements Made During 991013 Telephone Conversation for Administration of Licensing Exams at Diablo Canyon Power Plant Facility During Wks of 990410 & 990417. Requests Submittal of Ref Matls by Jan 15,2000 ML16341D1291999-10-14014 October 1999 Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML16342B9961999-10-0606 October 1999 Refers to OI Investigation 4-1998-029 in Response to Complaints from Shift Foreman of Alleged Retaliation for Reporting Safety Concerns.Allegations Not Substantiated ML16342A9081999-09-30030 September 1999 Informs That Staff Review of Util 980327 Response to GL 96-06, Degradation of SG Internals, Did Not Identify Any New Concerns & Concludes That Util Response to GL Provides Reasonable Assurance That Conditions of SG Compliant IR 05000275/19990071999-09-29029 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/99-07 & 50-323/99-07 on 990727 ML16342A9091999-09-29029 September 1999 Forwards SER Granting Requests for Relief NDE-12.2R8, NDE-13-2R8,NDE-14.2R8,NDE-22.2R8 & NDE-25.2R8 Pursuant to 10CFR50.55a(g)(6)(i) for Second 10-year ISI Interval for Diablo Canyon,Unit 2 ML16342A8981999-09-20020 September 1999 Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML16342A8881999-08-25025 August 1999 Forwards Insp Repts 50-275/99-13 & 50-323/99-13 on 990802- 06.No Violations Noted.Purpose of Insp,To Review Solid Radioactive Waste Mgt & Radioactive Matls Transportation Programs ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML16342A8461999-06-30030 June 1999 Discusses Closeout of Responses to RAI Re GL 92-01,Rev 1, Suppl 1, Rv Structural Integrity, for Plant,Units 1 & 2 ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address IR 05000275/19990061999-06-25025 June 1999 Forwards Insp Repts 50-275/99-06 & 50-323/99-06 on 990418-0529.Two Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy DCL-99-081, Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl1999-06-18018 June 1999 Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl ML16342A8271999-06-16016 June 1999 Announces Corrective Action Program Insp at Plant,Units 2 & 2,reactor Facilities on 990726-30.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML16342A8151999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990312,which Transmitted Change 16, Rev 18 to Physical Security Plan for Diablo Canyon Under Provisions of 10CFR50.54(p).No NRC Approval Required ML16342A8081999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan Implementing Procedures EP G-1,Emergency Classifications & EP Activation, Rev 27,under Provisions of 10CFR50,App E,Section V ML16342A8061999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon NPP Er Plan Implementing Procedures,Ep G-1, Emergency Classification & Ep,Activation,Rev 28,under 10CFR50,App E,Section V Provisions.No NRC Approval Required ML16342C1221999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan,Rev 3,Change 17, Under Provisions of 10CFR50,App E,Section V ML16342C1211999-06-0303 June 1999 Refers to 990602 Meeting with Util in Arlington,Tx Re Planned Electrical Configuration for Refueling Outage 2R9 During Midloop Operation.List of Attendees & Handouts Used by Util Encl ML16342A7951999-05-25025 May 1999 Informs of NRR Reorganization Effective 990328 & That as Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML16342A7891999-05-14014 May 1999 Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations ML16342C1141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals ML16342A7691999-04-14014 April 1999 Requests That First Page of Ltr Transmitting NRC Insp Repts 50-275/99-03 & 50-323/99-03 Be Replaced with Encl Page. Initial Transmittal Contained Minor Editorial Error ML16342A7571999-04-0808 April 1999 Forwards SER Accepting Util Emergency Core Cooling Sys Manual & Automatic Switchover from Refueling Water Storage Tank to Containment Sump for Diablo Canyon Power Plant ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19990031999-04-0505 April 1999 Corrected Ltr Forwarding Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Minor Editorial Error Corrected on First Page DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) ML16342A7381999-03-23023 March 1999 Refers to PG&E SG 90-day Rept, 90-Day Rept for Voltage- Based Alternate Repair Criteria - Unit 2 Eighth Refueling Outage, Dtd 980628.Forwards SE Concluding PG&E Implemented voltage-based Criteria in Accordance with Licensing Basis ML16342A7341999-03-18018 March 1999 Forwards FEMA Final Rept for 981104,emergency Preparedness Exercise.Rept Indicates No Deficiencies During Exercise, However 7 Areas Requiring Corrective Action Identified DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl IR 05000275/19980201999-02-19019 February 1999 Forwards Insp Repts 50-275/98-20 & 50-323/98-20 on 981206- 990123 & Notice of Violation Re Failure to Obtain Transient Combustible Permits for Storing Compressed Gas Cylinders Containing Flammable Hydrogen Into safety-related Areas ML16342A6881999-02-16016 February 1999 Forwards Insp Repts 50-275/99-301 & 50-323/99-301 on 990125- 28.No Violations Noted.Insp Included Evaluation of Six Applicants for Senior Operator Licenses.All Applicants Satisfied Requirements of 10CFR55 ML16342C0931999-02-0909 February 1999 Informs That by Ltrs & 1223,NRC Responded to WOG Positions Re Corrective Actions to Address Generic Aspects of part-length Control Rod Drive Mechanism Housing Issue as Result of Leak at Prairie Island Unit 2 on 980123 ML16342A6981999-02-0303 February 1999 Refers to Investigation Conducted by OIG Re Activities at Dcnpp.Informs That Based on Evidence Developed During Investigation,Testimony & Document Reviews,Allegation Re Employee Discrimination Not Substantiated.Synopsis Encl ML16342C0911999-02-0202 February 1999 Informs of Plans to Administer Gfes of Written Operator Licensing Exam at PG&E Facility on 990407.Names of Candidates for Exam & Personnel Proctoring Exam Requested by 990305 ML16342A6691999-01-29029 January 1999 Refers to 990115 Meeting Conducted at San Luis Obispo.Staff Presented Results of Safety Culture Survey.Survey Addressed Identification & Resolution of Problems & Mgt Influence.List of Attendees,Presentation Slides & Summary of Survey Encl ML16342A7151999-01-29029 January 1999 Discusses 990115 Meeting Conducted at Embassy Suites in San Luis Obispo Re Results of Util Safety Culture Survey. List of Attendees,Presentation Slides & Summary of Safety Culture Survey Provided by Licensee Encl ML16342A6701999-01-29029 January 1999 Forwards Request for Addl Info Re 970310 PG&E Rev 1 of W Technical Rept of WCAP-14797 (Proprietary) & WCAP-14798 (non-proprietary), Generic W* Tube Plugging Criteria for 51 Series Generator Tubesheet Region Wextex Expansions DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld DCL-99-005, Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included1999-01-22022 January 1999 Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML16342A6451999-01-12012 January 1999 Discusses Insp Repts 50-275/98-21 & 50-323/98-21 on 981204-18 & Forwards Nov.Violation Identified,Involving Two Examples of Failure to Meet NRC Requirements.Insp Focused on Operator Performance in Response to 981201 Manual RT IR 05000275/19980151999-01-0707 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Exercise Weaknesses Noted in Insp Repts 50-275/98-15 & 50-323/98-15 on 981120 ML16342A6391999-01-0606 January 1999 Forwards Insp Repts 50-275/98-17 & 50-323/98-17 on 981102-05 & 1207-11.No Violations Identified ML16342A6431999-01-0505 January 1999 Refers to NRC 981230 Response to D Lochbaum 981124 Petition That Request Mod of Operating Licenses for Diablo Canyon. Correct Date for Public Meeting Should Have Been 990115, Instead of 990111 ML16342C0811998-12-30030 December 1998 Forwards Safety Evaluation Re Inservice Testing Relief Request P-RR5, Auxiliary Saltwater Pump Performance Using Evaluation of Pump Curves 1999-09-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML16341D1311999-10-15015 October 1999 Discusses Arrangements Made During 991013 Telephone Conversation for Administration of Licensing Exams at Diablo Canyon Power Plant Facility During Wks of 990410 & 990417. Requests Submittal of Ref Matls by Jan 15,2000 ML16341D1291999-10-14014 October 1999 Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML16342B9961999-10-0606 October 1999 Refers to OI Investigation 4-1998-029 in Response to Complaints from Shift Foreman of Alleged Retaliation for Reporting Safety Concerns.Allegations Not Substantiated ML16342A9081999-09-30030 September 1999 Informs That Staff Review of Util 980327 Response to GL 96-06, Degradation of SG Internals, Did Not Identify Any New Concerns & Concludes That Util Response to GL Provides Reasonable Assurance That Conditions of SG Compliant ML16342A9091999-09-29029 September 1999 Forwards SER Granting Requests for Relief NDE-12.2R8, NDE-13-2R8,NDE-14.2R8,NDE-22.2R8 & NDE-25.2R8 Pursuant to 10CFR50.55a(g)(6)(i) for Second 10-year ISI Interval for Diablo Canyon,Unit 2 IR 05000275/19990071999-09-29029 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/99-07 & 50-323/99-07 on 990727 ML16342A8981999-09-20020 September 1999 Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML16342A8881999-08-25025 August 1999 Forwards Insp Repts 50-275/99-13 & 50-323/99-13 on 990802- 06.No Violations Noted.Purpose of Insp,To Review Solid Radioactive Waste Mgt & Radioactive Matls Transportation Programs ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML16342A8461999-06-30030 June 1999 Discusses Closeout of Responses to RAI Re GL 92-01,Rev 1, Suppl 1, Rv Structural Integrity, for Plant,Units 1 & 2 IR 05000275/19990061999-06-25025 June 1999 Forwards Insp Repts 50-275/99-06 & 50-323/99-06 on 990418-0529.Two Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML16342A8271999-06-16016 June 1999 Announces Corrective Action Program Insp at Plant,Units 2 & 2,reactor Facilities on 990726-30.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML16342A8151999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990312,which Transmitted Change 16, Rev 18 to Physical Security Plan for Diablo Canyon Under Provisions of 10CFR50.54(p).No NRC Approval Required ML16342C1221999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan,Rev 3,Change 17, Under Provisions of 10CFR50,App E,Section V ML16342A8061999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon NPP Er Plan Implementing Procedures,Ep G-1, Emergency Classification & Ep,Activation,Rev 28,under 10CFR50,App E,Section V Provisions.No NRC Approval Required ML16342A8081999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan Implementing Procedures EP G-1,Emergency Classifications & EP Activation, Rev 27,under Provisions of 10CFR50,App E,Section V ML16342C1211999-06-0303 June 1999 Refers to 990602 Meeting with Util in Arlington,Tx Re Planned Electrical Configuration for Refueling Outage 2R9 During Midloop Operation.List of Attendees & Handouts Used by Util Encl ML16342A7951999-05-25025 May 1999 Informs of NRR Reorganization Effective 990328 & That as Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML16342A7891999-05-14014 May 1999 Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations ML16342C1141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals ML16342A7691999-04-14014 April 1999 Requests That First Page of Ltr Transmitting NRC Insp Repts 50-275/99-03 & 50-323/99-03 Be Replaced with Encl Page. Initial Transmittal Contained Minor Editorial Error ML16342A7571999-04-0808 April 1999 Forwards SER Accepting Util Emergency Core Cooling Sys Manual & Automatic Switchover from Refueling Water Storage Tank to Containment Sump for Diablo Canyon Power Plant ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19990031999-04-0505 April 1999 Corrected Ltr Forwarding Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Minor Editorial Error Corrected on First Page ML16342A7381999-03-23023 March 1999 Refers to PG&E SG 90-day Rept, 90-Day Rept for Voltage- Based Alternate Repair Criteria - Unit 2 Eighth Refueling Outage, Dtd 980628.Forwards SE Concluding PG&E Implemented voltage-based Criteria in Accordance with Licensing Basis ML16342A7341999-03-18018 March 1999 Forwards FEMA Final Rept for 981104,emergency Preparedness Exercise.Rept Indicates No Deficiencies During Exercise, However 7 Areas Requiring Corrective Action Identified IR 05000275/19980201999-02-19019 February 1999 Forwards Insp Repts 50-275/98-20 & 50-323/98-20 on 981206- 990123 & Notice of Violation Re Failure to Obtain Transient Combustible Permits for Storing Compressed Gas Cylinders Containing Flammable Hydrogen Into safety-related Areas ML16342A6881999-02-16016 February 1999 Forwards Insp Repts 50-275/99-301 & 50-323/99-301 on 990125- 28.No Violations Noted.Insp Included Evaluation of Six Applicants for Senior Operator Licenses.All Applicants Satisfied Requirements of 10CFR55 ML16342C0931999-02-0909 February 1999 Informs That by Ltrs & 1223,NRC Responded to WOG Positions Re Corrective Actions to Address Generic Aspects of part-length Control Rod Drive Mechanism Housing Issue as Result of Leak at Prairie Island Unit 2 on 980123 ML16342A6981999-02-0303 February 1999 Refers to Investigation Conducted by OIG Re Activities at Dcnpp.Informs That Based on Evidence Developed During Investigation,Testimony & Document Reviews,Allegation Re Employee Discrimination Not Substantiated.Synopsis Encl ML16342C0911999-02-0202 February 1999 Informs of Plans to Administer Gfes of Written Operator Licensing Exam at PG&E Facility on 990407.Names of Candidates for Exam & Personnel Proctoring Exam Requested by 990305 ML16342A6701999-01-29029 January 1999 Forwards Request for Addl Info Re 970310 PG&E Rev 1 of W Technical Rept of WCAP-14797 (Proprietary) & WCAP-14798 (non-proprietary), Generic W* Tube Plugging Criteria for 51 Series Generator Tubesheet Region Wextex Expansions ML16342A6691999-01-29029 January 1999 Refers to 990115 Meeting Conducted at San Luis Obispo.Staff Presented Results of Safety Culture Survey.Survey Addressed Identification & Resolution of Problems & Mgt Influence.List of Attendees,Presentation Slides & Summary of Survey Encl ML16342A7151999-01-29029 January 1999 Discusses 990115 Meeting Conducted at Embassy Suites in San Luis Obispo Re Results of Util Safety Culture Survey. List of Attendees,Presentation Slides & Summary of Safety Culture Survey Provided by Licensee Encl IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML16342A6451999-01-12012 January 1999 Discusses Insp Repts 50-275/98-21 & 50-323/98-21 on 981204-18 & Forwards Nov.Violation Identified,Involving Two Examples of Failure to Meet NRC Requirements.Insp Focused on Operator Performance in Response to 981201 Manual RT IR 05000275/19980151999-01-0707 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Exercise Weaknesses Noted in Insp Repts 50-275/98-15 & 50-323/98-15 on 981120 ML16342A6391999-01-0606 January 1999 Forwards Insp Repts 50-275/98-17 & 50-323/98-17 on 981102-05 & 1207-11.No Violations Identified ML16342A6431999-01-0505 January 1999 Refers to NRC 981230 Response to D Lochbaum 981124 Petition That Request Mod of Operating Licenses for Diablo Canyon. Correct Date for Public Meeting Should Have Been 990115, Instead of 990111 ML16342C0811998-12-30030 December 1998 Forwards Safety Evaluation Re Inservice Testing Relief Request P-RR5, Auxiliary Saltwater Pump Performance Using Evaluation of Pump Curves ML16342C0831998-12-29029 December 1998 Advises of Planned Insp Effort Resulting from Dcnpp Insp Planning Review Held on 981202.Historical Listing of Plant Issues,General Description of PIM Table Labels & Insp Plan for Next Eight Months Encl ML16342A6251998-12-29029 December 1998 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML16342A5901998-12-0101 December 1998 Forwards SE of Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML16342A5801998-11-20020 November 1998 Forwards Insp Repts 50-275/98-15 & 50-323/98-15 on 981103- 06.No Violations Noted.Insp Included Implementation of Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML16342A5671998-11-0606 November 1998 Forwards Current Copy of Region 4 Organization Chart.Changes Made to Facilitate Closure of Region 4 Walnut Creek Field Ofc & Relocation of Project Branch E from Walnut Creek,Ca to Arlington,Tx.Closure Completed on 980930 ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C 1999-09-30
[Table view] |
See also: IR 05000275/1999013
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9908310052
DOC.DATE: 99/08/25
NOTARIZED: NO
DOCKET ¹
~
PACZL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
GOOD,G.M.
Region
4 (Post
820201)
RECZP
NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
6 Electric Co.
SUBJECT: Forwards insp repts 50-275/99-13
6 50-323/99-13
on 990802-
C
06.No violations noted. Purpose of insp,to review solid
radioactive waste mgt
6 radioactive matls transportation
'
programs.
T
DISTRIBOTION CODE: IE06P
COPIES
RECEIVED:LTR
l
ENCL I
SIZE:
TITLE: Environ & Radiological
(50 DKT)-Xnsp Rept/Notice of Violation Response
NOTES:
RECZPIENT
ZD CODE/NAME
LPD4-2
PD
INTERNAL: ACRS
NMSS/SPPO
NRR/DIPM/XIPB
OE
RGN4
RILE
01
RNALa: NOAC
NUDOCS PULLTEXT
COPIES
LTTR ENCL
1
1
'2
2
1
1
1
1
1,
1
1
1
1
1
1
'
RECXPZENT
ID CODE/NAME
BLOOMERS
FILE CENTER
7bXPM EPHP
NUDOCS>>ABSTRACT
OGC/RP
NRC"PDR
COPIES
LTTR'NCL
1
1
1
1
1
1
1
1
1
1
1
1
'
R
~
D
0
LOAOaO FROM
pLp~OMlC VN ~
N
NOTE TO ALL'RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE, NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
A
TOTAL NUMBER OP
COPXES
REQUIRED:
LTTR
15
ENCL
15
)I
gR
4
Vr+
Rgg~
C
0
0c
~O
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011-8064
August 25,
1999
Gregory M. Rueger, Senior Vice President
and General Manager
Nuclear Power Generation Bus. Unit
Pacific Gas and Electric Company
Nuclear Power Generation, B32
.77 Beale Street, 32nd Floor
P.O. Box 770000
San Francisco, California 94177
SUBJECT:
NRC INSPECTION REPORT NO. 50-275/99-13; 50-323/99-13
Dear Mr. Rueger:
This refers to the inspection conducted on August 2-6, 1999, at the Diablo Canyon Nuclear
Power Plant, Units 1 and 2 facilities. The purpose of the inspection was to review the solid
radioactive waste management and radioactive materials transportation programs.
The
enclosed report presents the results of this inspection.
We concluded that the programs reviewed were implemented correctly.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we willbe pleased to discuss them
'with you.
Sincerely,
I
Gail M. Good, Chief
Plant Support Branch
Division of Reactor Safety
Docket Nos.:
50-275
50-323
License Nos.: DPR-80
DPR-82
Enclosure:
NRC Inspection Report No.
50-275/99-13; 50-323/99-13
99083i0052 9'70825
PDR
ADOCK 05000275
8
PDR
0
Pacific Gas and Electric Company
-2-
cc w/enclosure:
Dr. Richard Ferguson
Energy Chair
Sierra Club California
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Mr. Truman BurnshMr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234-7320
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
David H. Oatley, Vice President
Diablo Canyon Operations and Plant Manager
Diablo Canyon Nuclear Power Plant
P.O. Box 3
Aviia Beach, California 93424
Pacific Gas and Electric Company
Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, California 93406
Pacific Gas and Electric Company
-4
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE06) - Radiological Protection Reports
bcc distrib. by RIV:
Regional Administrator
DRP Director
DRS Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
Diablo Canyon Resident Inspector
RIV File
RITS Coordinator
DOCUMENT NAME: R:7 QC(DC913RPLTR.WPD
To receive co
of document, Indicate In box: C" = Co
without enciosures
"E ~ Co
with enciosures
N ~ No co
RIV:PSB
m&o
PSB
LTRick
C:DRSEPSB
C:DRPhE
GMQood
I
LJSmith
45
08/ /99
08/
99
08/i%99
08
9
OFFICIAL RECORD COPY
Pacific Gas and Electric Company
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to'DCD.(IE06) - Radiological Protection Reports
bcc distrib. by RIV:
Regional Administrator
DRP Director
DRS Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
Diablo Canyon Resident Inspector
RIV File
RITS Coordinator
DOCUMENT NAME: R:i Dc'tDC913RPLTR.WPD
To receive co
of document, indicate In box: "C" ~ Co
without enclosures
"E" ~ Co
with enclosures "N" ~ No co
RIV:PSB
H. og/4mnlo
08/ /99
PSB
.
C:DRS'LPSB
C:DRPtE
LJSmith
w3
08/8'99
08')99
08/
99
OFFICIAL RECORD COPY
LTRicke
. h GMGood ..-t~