ML16341D129

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs
ML16341D129
Person / Time
Site: Diablo Canyon  
Issue date: 10/14/1999
From: Good G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341D130 List:
References
50-275-99-15, 50-323-99-15, NUDOCS 9910210237
Download: ML16341D129 (10)


See also: IR 05000275/1999015

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011%064

October

14,

1999

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation, B32

77 Beale Street, 32nd Floor

P.O. Box 770000

San Francisco, California 94177

SUBJECT: NRC INSPECTION REPORT NO. 50-275/99-15; 50-323/99-15

Dear Mr. Rueger:

This refers to the inspection conducted on September 20-24, 1999, at the Diablo Canyon

Nuclear Power Plant, Units 1 and 2 facilities. The purpose of the inspection was to review the

radiation protection organization's preparation for Refueling Outage 2R9. The enclosed report

presents the results of this inspection.

Based on the results of this inspection, the NRC has determined that two Severity Level IV

violations of NRC requirements occurred.

These violations are being treated as noncited

violations (NCVs), consistent with Appendix C of the Enforcement Policy. These NCVs are

described in the subject inspection report.

If you contest the violation or severity level of these

NCVs, you should provide a response within 30 days of the date of this inspection report, with

the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control

Desk, Washington DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear

Regulatory Commission, Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011,

the Director, Office of Enforcement, United States Nuclear Regulatory Commission,

Washington, DC 20555-0001; and the NRC Resident Inspector at the Diablo Canyon Nuclear

Power Plant, Units 1 and 2 facilities.

In accordance with 10 CFR 2.790 of the NRC's "Rules'of Practice," a copy of this letter, its

enclosure(s), and your response,

if requested, willbe placed in the NRC Public Document

Room (PDR).

99i02i0237 .99iQi4

PDR

ADQCK 05000275

Pacific Gas and Electric Company

-2-

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Gail M. Good, Chief

Plant Support Branch

Division of Reactor Safety

Docket Nos.:

50-275

50-323

License Nos.: DPR-80

DPR-82

Enclosures:

NRC Inspection Report No.

50-275/99-1 5; 50-323/99-15

cc w/enclosures:

Dr. Richard Ferguson

Energy Chair

Sierra Club'California

1100 lith Street, Suite 311

Sacramento,

California 95814

Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Truman BurnshMr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Pacific Gas and Electric Company

-3-

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234-7320

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

David H. Oatley, Vice President

Diablo Canyon Operations and Plant Manager

Diablo Canyon Nuclear Power Plant

P.O. Box 3

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

Pacific Gas and Electric Company

-4-

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE06)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

DC Resident Inspector

RIV File

RITS Coordinator

DOCUMENT NAME: R:CDC'tDC915RP.LTR.WPD

To receive co

of document, indicate inbox: "C

~ Co

without enclosures

"E" = Co

with enclosures

N = No co

RIV:PSB

Peer Review

10/5/99

C:DRS>PSB

6MGood

C:DRP't

LJSmit

PSB

LTRick

son:nh

10

/99

10

9

10/

99

OFFICIAL RECORD COPY

0

I

Pacific Gas and Electric Company

-4-

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE06)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

DC Resident Inspector

RIV File

RITS Coordinator

DOCUMENT NAME: R:i DCEDC915RP.LTR.WPD

To receive co

of document. indicate in box: "C" = Co

without enciosures

"E" = Co

with enclosures "N = No co

RIV:PSB

PSB

C:DRSiPSB

C:DRP't

Peer Review

LTRick son:nh

GMGood

iX

LJSmit

10/5/99

10

/99

10/

99

10

9

OFFICIAL RECORD COPY