ML16341F257

From kanterella
Jump to navigation Jump to search

Forwards NRC to Util Transmitting Safety Evaluation of Hilti Bolt Issue,Nrc Info Notice 88-025, Min Edge Distance for Expansion Anchor Bolts & Util 890511 & 0609 Ltrs Addressing Issue
ML16341F257
Person / Time
Site: Diablo Canyon  
Issue date: 07/26/1989
From: Rood H
Office of Nuclear Reactor Regulation
To: Meagher C
AFFILIATION NOT ASSIGNED
Shared Package
ML16341F258 List:
References
IEIN-88-025, IEIN-88-25, TAC-65292, TAC-65293, NUDOCS 8908030082
Download: ML16341F257 (6)


Text

,,E'>>

July 26, 1989

~ Docket Nos.

50-275 and 50-323 DISTRIBUTION

~

~

Ed d

NRC IE LPDR BGrimeS GHolahan GBagchi MVirgilio DJeng JLee JMa Arroyo Grande, California 93420 HRood RBrady OGC ACRS(10)

PDV Plant File MMendonca (RV)

SUBJECT:

SAFETY EVALUATION AND OTHER DOCUMENTS RELATED TO DIABLO CANYON HILTI BOLT ISSUE (TAC NOS.

65292 AND 65293)

Mr. Craig Meagher P.O.

Box 930

Dear Mr. Meagher:

S incerely, original signed by Enclosed for your information is a copy of a letter dated July 26, 1989, from the NRC to the Pacific Gas and Electric Company (PGSE), transmitting the staff's Safety Evaluation of the Hilti bolt issue at Diablo Canyon.

Also enclosed for your information are NRC Information Notice No. 88-25, "Minimum Edge Distance for Expansion Anchor Bolts," dated May 16, 1988, and letters from PG8E dated May ll, 1988 and June 9, 1989, which address the Hilti bolt issue.

Thank you for bringing your concerns about this issue to our attention.

Enclosures:

1.

NRC staff letter dated 07/26/89 2.

NRC Information Notice No. 88-25 3.

PGKE letter dated 06/09/89 4.

PGIWE letter dated 05/11/88 cc w/encl:

See next page Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation DRSP/PD5 PMAS/PTSB HRood*

RBrady*

07/26/89 07/27/89

  • See previous concurrence OFFICIAL RECORD COPY DRSP/D:PD5 GKnighton*

07/26/89 9

J 1

C'

R'a ocket Nos. 50-275 and 50-323

r. Craig Meagher P 0.

Box 930 Arro o Grande, California 93420 staff's Safety Evaluation f the Hilti bolt issue at Diablo Canyon.

Also enclosed for your information re NRC Information Notice No. 88-25, "Minimum Edge Distance for Expansion Ancho Bolts,", dated May 16, 1988, and letters from PG&E dated May 11, 1988 and June

, 1989, which address the Hilti bolt issue.

Thank you for bringing your conce s about this issue to our attention.

Sincerely, DISTRIBUTION

~t Ed d

NRC

& LPDR BGrimes GHolahan GBagchi MVirgilio DJeng JLee JMa HRood RBrady OGC ACRS(10)

Dear Mr. Meagher:

PDV Plant File MMendonca (RV)

SUBJECT:

FETY EVALUATION AND OTHER DOCUMENTS RELATED TO DIABLO CANYON HIL I BOLT ISSUE (TAC NOS.

65292 AND,65293)

I Enclosed fo our information dis a copy of a letter dated July 26, 1989, from the NRC 'to the cific'Gas 'and Electric Company (PG&E), transmitting the

Enclosures:

1.

NRC staff letter dated 07/26/89 2.

NRC Information Notice No. 88-25 3.

PG&E letter dated 06/09/89 3.

PG&E letter dated 05/ll/88 Harry Rood, Senior roject Manager Project Directorate Division of Reactor P

jects - III, IV, V and Special Pro cts Office of Nuclear Reactor egulation cc w/encl:

See next page ORSP/PO5~

P PTSB HRood 07/g(a/89 07 89 OFFICIAL RECORD COPY y/0 DR G

07/p 9

gJ

~l C,

I

/

'.r l I

I

~

a'll V

I l

gP,R REgy (4

4 y**4 Docket Nos.

50-275 and 50-323 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 July 26, 1989 Mr. Craig Meagher P.O.

Box 930 Arroyo Grande, California 93420

Dear Mr. Meagher:

SUBJECT:

SAFETY EVALUATION AND OTHER DOCUMENTS RELATED TO DIABLO CANYON HILTI BOLT ISSUE (TAC NOS.

65292 AND 65293)

Enclosed for your information is a copy of a letter dated July 26, 1989, from the NRC to the Pacific Gas and Electric Company (PGSE), transmitting the staff's Safety Evaluation of the Hilti bolt issue at Diablo Canyon.

Also enclosed for your information are NRC Information Notice No. 88-25, "Minimum Edge Distance for Expansion Anchor Bolts," dated May 16, 1988, and letters from PGSE dated May 11, 1988 and June 9, 1989, which address the Hilti bolt issue.

Thank you for bringing your concerns about this issue to our attention.

S incere ly,

Enclosures:

1.

NRC staff letter dated 07/26/89 2.

NRC Information Notice No. 88-25 3.

PG&E letter dated 06/09/89 4.

PGEE letter dated 05/11/88 cc w/encl:

See next page Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Tl C

r