Text
WJ
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9811240082
DOC.DATE: 98/11/20
NOTARIZED: NO
DOCKET ¹
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
MURRAY,B.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
8 Electric Co.
SUBJECT: Forwards insp repts 50-275/98-15
8 50-323/98-15
on 981103-
l
06.No violations noted.Insp included implementation of
&. procedures
during biennial emergency
preparedness
exercise.
I
DISTRIBUTION CODE: IE35F
COPIES
RECEIVED:LTRI ENCL
i
SIZE: 5
7 B
TITLE: Emergency Preparedness-Appraisal/Confirmatory
Action Ltr/Exercise
Rep
)
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNA . FILE CENTER
D
EXTERNAL: NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BLOOM,S
NRR/DRPM/PERB
RGN4
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROI
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
8
ENCL
8
~ .
UNITED STATES
hVC<EAR REGULATORY COMMISSION
~
p'C
~V
I
~
~
~
4RLINGTOf4 TEXAS,60l1.6C6<
NOI/ 20 &i3
Gregory M. Rueger, Senior Vice President
and General Manager
Pacific Gas and Electric Company
Nuclear Power Generation
Diablo Canyon Nuclear Power Plant
P.O. Box 3
Avila Beach, California 93424
SUBJECT:
NRC INSPECTION REPORT 50-275/98-15; 50-323/98-15
Dear Mr. Rueger:
From November 3-6, 1998, an announced, emergency preparedness
inspection was conducted
at your Diablo Canyon Nuclear Power Plant, Units 1 and 2 reactor facilities. The enclosed
report presents the scope and results of that inspection.
The inspection included implementation of your emergency plan and procedures during your
biennial emergency preparedness
exercise.
Overall, performance during the biennial exercise
was good; however, two exercise weaknesses
were identified. The exercise weaknesses
involved: (1) untimely activation of the technical support center and emergency operations
facility, and (2) an untimely offsite agency notification for the site area emergency.
Exercise weaknesses,
according to 10 CFR Part 50, Appendix E.IV.F.2.g, are inspection
findings that need to be corrected by the licensee.
Since the first weakness was not identified
during your critique process, you are I'equested to provide this office with a description of your
corrective measures
and your schedule for completing these actions within 30 days after receipt
of this letter. The second exercise weakness was identified during your critique process and
~
planned corrective actions are adequately addressed
in the enclosed report; therefore, a
response
is not necessary.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Should you have any questions. concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
98i i240082 98i 120
poR
hooch osaaa27s
6
Blaine Murr y,
Chief'lant
Support Branch
. Division of Reactor Safety
Pacific Gas and Electric Company
-2-
Docket Nos.:
50-275
50-323
License Nos.: DPR-80
DPR-82
Enclosure:
NRC Inspection Report
50-275/98-15; 50-323/98-15
cc w/enclosure:
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Mr. Truman Burns>Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
Robert R. Wellington, Esq.
'L'e gal Counsel
Diablo Canyon Independent Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Pacific Gas and Electric Company
-3-
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
David H. Oatley, Vice President
Diablo Canyon Operations and Plant Manager
Diablo Canyon Nuclear Power Plant
P.O. Box 3
Avila Beach, California 93424
Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, California 93406
Training, Exercises,
& Evaluation
Brnach Chief
FEMA Region IX
Building 105
Presidio of San Francisco
San Francisco, CA 94129
~
~
C
Pacific Gas and Electric Company
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)(IE35)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
C. A. Hackney, RSLO
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R: DcttDC815RP.GMG
To receive co
of document, Indicate In box: "C" = Co
without enclosures
"E" ~ Co
with enclosures "N" ~ No co
SEPA:PSB
E
6MGood:c
THAndrews
LTRicketsoo
RS:PSB
E
SRS:PSB
E
SBo nton
GPick
SRI/WNP
E
E:DRP
11/I 98
C:PSB
BMurra
11
98
11'("/98
D:DRS
118 /98
11
/98
OFFICIAL RECORD COPY
111(798
11
98
Pacific Gas and Electric Company
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD ttifftt)(IE35).
bcc distrib. by RIV:
Regional Administrator
DRP Director
~
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
C. A. Hackney, RSLO
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R: DC)DC815RP.GMG
To receive co
of document, Indicate ln box:
C" ~ Co
without enclosures
"E" ~ Co
with enclosures "N" = No co
SEPA:PSB
E
6MGood:c
RS:PSB
E
THAndrews- 4'RS:PSB
E
SRI/WNP
E
E:DRP
LTRicketson
SBo nton 'Q
GPick
11/t 98
C:PSB
BMurra
11
98
11/c /98
D:DRS
11/ '98
11A /98
11/f'798
OFFICIAL RECORD COPY
11
98