Discusses Insp Repts 50-275/98-21 & 50-323/98-21 on 981204-18 & Forwards Nov.Violation Identified,Involving Two Examples of Failure to Meet NRC Requirements.Insp Focused on Operator Performance in Response to 981201 Manual RT
ML16342A645
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/12/1999
From: Laura Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A646 List:
References
RTR-NUREG-0737, RTR-NUREG-737 50-275-98-21, 50-323-98-21, NUDOCS 9901200310
Download: ML16342A645 (12)


See also: IR 05000275/1998021

Text

,CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:9901200310

DOC.DATE: 99/01/12

NOTARIZED: NO

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

50.-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific

Ga

AUTH.NAME

AUTHOR AFFILIATION

SMITH,L.J.

Region

4

(Post

820201)

RECZP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

&, Electric Co.

DOCKET I

05000275

05000323

SUBJECT: Discusses

insp repts 50-275/98-21

&, 50-323/98-21

on

981204-18

6 forwards NOV.Violation identified involving two

examples of failure to meet

NRC requirements.Insp

focused

on

operator performance in response

to 981201 manual

RT.

DISTRIBUTION CODE: IEOIF

COPIES

RECEIVED:LTR g

ENCLj

SIZE:

. ~

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

E

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

OD

TC

FILE CE

M PECB

NUDOCS-ABSTRACT

OGC/HDS3

EXTERNAL: LITCO BRYCE, J H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN4

FILE, 01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

~OMITFAGS

ELFC7Rogg Fl~

N

NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

.DESK

(DCD)

ON EXTENSION C15-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

0

I 0

~

~pR Rfgg

~c,+

O~

~,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZAORIVE. SUITE 400

ARLINGTON.TEXAS 76011 6064

JAN

j 2 l999

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation Bus. Unit

Pacific Gas and Electric Company.

Nuclear Power Generation, B32

77 Beale Street, 32nd Floor

P.O. Box 770000

San Francisco, California 94177

SUBJECT: NRC INSPECTION REPORT 50-275/98-21; 50-323/98-21 AND NOTICE OF

VIOLATION

Dear Mr. Rueger:

From December 4 to 18, 1998, a special inspection was conducted at your Diablo Canyon

Nuclear Power Plant, Unit 2, reactor facility. The focus of the inspection was to evaluate

operator performance in response to the December 1, 1998, manual reactor trip and loss of

circulating water. The enclosed report presents the scope and results of that inspection.

Overall, operators responded satisfactorily to the reactor trip and loss of circulating water, the

normal heat sink. The operators effectively stabilized the plant in a safe condition. However,

based on the results of this inspection, the NRC has determined that one violation involving two

examples of failure to meet NRC requirements occurred.

The violation is cited in the enclosed

Notice of Violation (Notice) and the circumstances surrounding it are described in detail in the

subject inspection report.

In the first example, a misunderstanding by operators regarding the

effect of adjusting the atmospheric dump valve resulted in a high pressure setting that

unnecessarily challenged the main steam safety valves.

In the second example, a lack of

understanding of the response of the circulating water differential pressure indication to a

reactor trip resulted in a delay in securing the circulating water pump. These examples were

both contrary to procedure guidance.

We acknowledge that your staff likelywould have identified the first example during their

posttrip review, which, according to the Enforcement Manual, qualifies for licensee identification

credit. However, notwithstanding the guidance in Section VII.B.1 of the Enforcement Manual,

this example is being cited because both violation examples were partially caused by training

weaknesses

and because this example of the violation resulted in an unnecessary

liftof Main

Steam Safety Valve RV-7. In addition, the inspectors noted that a lack of formality and

structure in evaluating human performance and a lack of detail in operating logs made'it difficult

to reconstn;ct the event.

)

The NRC has concluded that information regarding the reason for the violation, the corrective

actions taken and planned to correct the violation and prevent recurrence, and the date when

full compliance was achieved is already adequately addressed

on the docket in the enclosed

inspection report. Therefore, you are not required to respond to this letter unless the

990i2003i0 990ii2

PDR

ADOCK 05000275

9

PDR

Pacific Gas and Electric Company

-2-

description therein does not accurately reflect your corrective actions or your position.

In that

case, or ifyou choose to provide additional information, you should followthe instructions

specified in the enclosed Notice.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures; and your response willbe placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

Linda J. Smi, Acting Chief

Project Branch E

Division of Reactor Projects

Docket Nos.:

50-275

50-323

License Nos.: DPR-80

DPR-82

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-275/98-21; 50-323/98-21

cc w/enclosures:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento, California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach; California 93448

Chairman

San Luis Obispo County Board of

Supervisors

.

Room 370

County Government Center

San Luis Obispo, California 93408

0

Pacific Gas and Electric Company

-3-

Mr. Truman Burns>Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Comniittee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

David H. Oatley, Vice President

Diablo Canyon Operations and Plant Manager

Diablo Canyon Nuclear Power Plant

P.O. Box 3

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

0

Pacific Gas and Electric Company

-4-

JAN

I 2 I999

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R'3 DC>DC821RP.SAB

To receive co

of document, indicate in box: "C" ~ Co

without enclosures

E

~ Co

with enclosures "N" = No co

RIV:SRI:W

-2

SABo nt

12/

/98

NRR:HHFB

RMPelton ~

12/Q/98 ~m"

SPE:D

/

GAPick

1/ 4./99

AC:DRP/E

LJSmith

1/

/99

OFFICIALRECORD COPY

(~IH

N

Pacific Gas and Electric Company

-4-

JAN

I 2 I999

E-Mail report to T. Ffye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV

Fife'OCUMENT

NAME: R:i Dc'IDC821RP.SAB

To receive co

of document. Indicate In box: "C" = Co

without enclosures

E

= Co

with enclosures "N = Noco

RIV:SRI:W P-2

NRR:HHFB

SPE:DRP/E,

AC:DRP/E

SABo nt

12/

/98

-.. '> XV

GAPickI~i

RMPelton I ~

LJSmith-

1/

/99

1/ b./99

12/"-'/98 '"'.'-~'.'FFICIAL

RECORD COPY