ML16342A789
| ML16342A789 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/14/1999 |
| From: | Laura Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342A790 | List: |
| References | |
| 50-275-99-04, 50-275-99-4, 50-323-99-04, 50-323-99-4, NUDOCS 9905270054 | |
| Download: ML16342A789 (10) | |
See also: IR 05000275/1999004
Text
~p,fl Rfg~
c,>
C~
Cy
o0
Ih
o
<<>>*<<>>
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
'RLINGTON,TEXAS 76011-8064
~
~ ~ I
~
Gregory M. Rueger, Senior Vice President
and General Manager
Nuclear Power Generation Bus. Unit
Pacific Gas and Electric Company
Nuclear Power Generation, B32
77 Beale Street, 32nd Floor
P.O. Box 770000
San Francisco, California 94177
SUBJECT: NRC INSPECTION REPORT NO. 50-275/99-04; 50-323/99-04
Dear Mr. Rueger:
Thil refers to the inspection conducted on March 7 through April 17, 1999, at the Diablo
Canyon Nuclear Power Plant, Units 1 and 2, facility. The enclosed report presents the results
of this inspection.
During the 6-week period covered by this inspection period, your conduct of activities at the
Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious
operations, sound engineering and maintenance practices, and good radiation protection
sUpport.
Based on the results of this inspection, the NRC has determined that four violations of NRC
requirements occurred.
These violations are being treated as noncited violations, consistent
with Appendix C of the Enforcement Policy. These noncited violations are described in the
subject inspection report.
If you contest the violation or severity level of these noncited
violations, you should provide a response within 30 days of the date of this inspection report,
with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document
Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator,
Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission,
Washington, DC, 20555-0001; and the resident inspector at the facility.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosure, and your response willbe placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we willbe pleased to discuss them
with you.
Sincerely,
9905270054
9905i4
ADQCK 05000275
8
L nda Joy S
h, Chief
Project Branch E
Division of Reactor Projects
Pacific Gas and Electric Company
-2-
Docket Nos.:
50-275
50-323
License Nos.: DPR-80
DPR-82
Enclosure:
NRC Inspection Report No.
50-275/99-04; 50-323/99-04
cc w/enclosure:
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Mr. Truman BurnshMr: Robert Kinosian
California Public Utilities Commission
.
505 Van Ness, Rm. 4102
San Francisco, California 94102
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Pacific Gas and Electric Company
f
-3-
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
David H. Oatley, Vice President
Diablo Canyon Operations and Plant Manager
Diablo Canyon Nuclear Power Plant
P.O. Box 3
Avila Beach, California 93424
Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, California 93406
0
Pacific Gas and Electric Company
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
DRS Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:t DC>DC904RP.DLP
To receive co
of document, indicate in box: "C" = Co
without enclosures
"E" = Co
viith enclosures "N" = No co
RIV:Rl
Rl
DECor orand
DGAcker M
DLProulx v&
JFMelfi
GAPick
05 M9
C:DRP/E
LJSmith
vR
05@'99
05/ /99 '~~ ~ '-
05/i+9
05 g99
OFFICIAL RECORD COPY
05P
99
~
~
Pacific Gas and Electric Company
-4.
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
DRS Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:QDC<DC904RP.DLP
To receive co
of document, Indlcoto In box: "C" a Co
without enclosures
"E" a Co
with enclosures "N" = No co
RIV:RI
,
RI
DECor oran
~ DGAcker W
DLProulx M
JFMel i
GAPick
05 tB9
C:DRP/E
LJSmith
058'99
05/ /99 <~n'+
05/i
9
05 g99
OFFICIAL RECORD COPY
05
99
'1