ML16342A789

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations
ML16342A789
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/14/1999
From: Laura Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A790 List:
References
50-275-99-04, 50-275-99-4, 50-323-99-04, 50-323-99-4, NUDOCS 9905270054
Download: ML16342A789 (10)


See also: IR 05000275/1999004

Text

~p,fl Rfg~

c,>

C~

Cy

o0

Ih

o

<<>>*<<>>

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

'RLINGTON,TEXAS 76011-8064

~

~ ~ I

~

IA

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation, B32

77 Beale Street, 32nd Floor

P.O. Box 770000

San Francisco, California 94177

SUBJECT: NRC INSPECTION REPORT NO. 50-275/99-04; 50-323/99-04

Dear Mr. Rueger:

Thil refers to the inspection conducted on March 7 through April 17, 1999, at the Diablo

Canyon Nuclear Power Plant, Units 1 and 2, facility. The enclosed report presents the results

of this inspection.

During the 6-week period covered by this inspection period, your conduct of activities at the

Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious

operations, sound engineering and maintenance practices, and good radiation protection

sUpport.

Based on the results of this inspection, the NRC has determined that four violations of NRC

requirements occurred.

These violations are being treated as noncited violations, consistent

with Appendix C of the Enforcement Policy. These noncited violations are described in the

subject inspection report.

If you contest the violation or severity level of these noncited

violations, you should provide a response within 30 days of the date of this inspection report,

with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document

Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator,

Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission,

Washington, DC, 20555-0001; and the resident inspector at the facility.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response willbe placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

9905270054

9905i4

PDR

ADQCK 05000275

8

PDR

L nda Joy S

h, Chief

Project Branch E

Division of Reactor Projects

Pacific Gas and Electric Company

-2-

Docket Nos.:

50-275

50-323

License Nos.: DPR-80

DPR-82

Enclosure:

NRC Inspection Report No.

50-275/99-04; 50-323/99-04

cc w/enclosure:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman BurnshMr: Robert Kinosian

California Public Utilities Commission

.

505 Van Ness, Rm. 4102

San Francisco, California 94102

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Pacific Gas and Electric Company

f

-3-

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

David H. Oatley, Vice President

Diablo Canyon Operations and Plant Manager

Diablo Canyon Nuclear Power Plant

P.O. Box 3

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

0

Pacific Gas and Electric Company

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:t DC>DC904RP.DLP

To receive co

of document, indicate in box: "C" = Co

without enclosures

"E" = Co

viith enclosures "N" = No co

RIV:Rl

Rl

SRI

PE

SPE

DECor orand

DGAcker M

DLProulx v&

JFMelfi

GAPick

05 M9

C:DRP/E

LJSmith

vR

05@'99

05/ /99 '~~ ~ '-

05/i+9

05 g99

OFFICIAL RECORD COPY

05P

99

~

~

Pacific Gas and Electric Company

-4.

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:QDC<DC904RP.DLP

To receive co

of document, Indlcoto In box: "C" a Co

without enclosures

"E" a Co

with enclosures "N" = No co

RIV:RI

,

RI

SRI

PE

SPE

DECor oran

~ DGAcker W

DLProulx M

JFMel i

GAPick

05 tB9

C:DRP/E

LJSmith

058'99

05/ /99 <~n'+

05/i

9

05 g99

OFFICIAL RECORD COPY

05

99

'1