ML16342A698
| ML16342A698 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/03/1999 |
| From: | Brockman K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| References | |
| NUDOCS 9903040197 | |
| Download: ML16342A698 (8) | |
Text
CATEGORY.Py REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9903040197 DOC.DATE: 99/02/03 NOTARIZED: NO DOCKET FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION BROCKMAN,K.E.
Region 4 (Post 820201)
RECIP.NAME RECXPIENT AFFILIATION RUEGER,G.M.
Public, Service Electric
& Gas Co. of New Jersey
SUBJECT:
Refers to investigation conducted by OIG re activitie's at
~ DCNPP.Informs that based on evidence developed during investigation, testimony s document reviews, allegation re employee discrimination ZIot substantiated. Synopsis encl.
DISTRXBUTION CODE:
XE54D COPIES RECEIVED:LTR ENCL
(
SIZE:
TITLE: Reg'on Response to Licensee re Allegatio s (Publicly Avail)
/
NOTES:
A RECIPIENT ID CODE/NAME PD4-2 LA BLOOM,S COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1
1 XNTERN Lg CE NRR DRPM/PECB RGN4 FILE 01 NRR/DRPM RES/DET/EIB 1
1 1
1
,2 EXTERNAL: NOAC 1
1 NRC PDR 1
1
'C E
NOTE TO ALL "RIDS" RECIPZENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
gp,S AEQUI PO Cy J
fN o
~O
+)t*++
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011-8064
'February 3, 1999 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B32 77 Beale Street, 32nd Floor P.O. Box 770000 San Francisco, California 94177 "uGLIC QQCuz<ff y ftoo~
FE8-9 A8:08
SUBJECT:
CLOSURE OF INVESTIGATION(OI 4-1998-021)
Dear Mr. Rueger:
This letter is in reference to an investigation conducted by the NRC Office of Investigations (Ol) regarding activities at Diablo Canyon Nuclear Power Plant (DCNPP). The Ol investigation was initiated in response to a complaint of employment discrimination for identifying a safety concern.
Based on the evidence developed during the investigation, testimony, and document reviews, the allegation was not substantiated.
The NRC plans no further action regarding this investigation and considers this case closed.
Enclosed for your reference and information is a copy of the synopsis from Ol 4-1 998-021.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and the enclosure will be placed in the NRC Public Document Room.
Sincerely, enneth
. Br man, Director Division of Reactor Projects
Enclosure:
As stated 9903040197 990203 PDR ADQCK 05000275 8
Ig bcc w/enclosure:
Allegation File PDR RIV:SAC RWise 2/2/99 MStein 2/p /99 D:ACE GFSan 2/
/99 OFFICIALRECORD COPY D:DRP KEBrockman f+
fl
SYNOPSIS This investigation was initiated on April 28,
- 1998, by the Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region IV (RIV), to determine if a quality control specialist at Pacific Gas and Electric Company's (PGEE) Diablo Canyon Nuclear Power Plant (DCNPP) was the subject of employment discrimination by PG&E and/or DCNPP management for refusing to approve the fit up of a weld that could not be confirmed to meet procedurally mandated cleanliness requirements.
Based on the evidence developed, testimony, documentation, and a review by the technical staff and regional counsel, the allegation that the quality control specialist was the subject'mployment discrimination by his management for raising a safety concern was not substantiated.
NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR OFFICE OF INVESTIGATIONS, REGION IV Case No. 4-1998-021