Forwards Insp Repts 50-275/98-20 & 50-323/98-20 on 981206- 990123 & Notice of Violation Re Failure to Obtain Transient Combustible Permits for Storing Compressed Gas Cylinders Containing Flammable Hydrogen Into safety-related Areas
ML16342C095
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/19/1999
From: Laura Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A693 List:
References
50-275-98-20, 50-323-98-20, NUDOCS 9902250308
Download: ML16342C095 (12)


Text

February 19, 1999

SUBJECT:

NRC INSPECTION REPORT 50-275/98-20; 50-323/98-20 AND NOTICE OF VIOLATION

Dear Mr. Rueger:

From December 6, 1998, through January 23, 1999, a routine inspection was conducted at your Diablo Canyon Nuclear Power Plant, Units 1 and 2, reactor facility. The enclosed report presents the scope and results of that inspection.

During the 7-week. period covered by this inspection period, your conduct of activities at the Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious operations, sound engineering and maintenance practices, and good radiation protection support.

Based on the results of this inspection, a violation of NRC requirements was identified. The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding this violation are described in detail in the enclosed report. This violation involved failure to obtain transient combustible permits for storing compressed gas cylinders containing flammable hydrogen into safety-related areas.

The NRC has concluded that information regarding the reason for the violation and the corrective actions taken and planned to correct the violation and prevent recurrence is already

. adequately addressed on the docket in the enclosed report. Therefore, you are not required to respond to the violation unless the description therein does not accurately reflect your corrective actions or your position.

In that case, or if you choose to provide additional information, you should followthe instructions specified in the enclosed notice.

We are concerned with two failures of expansion joints that occurred on nonsafety-related systems that challenged operators by necessitating two unplanned downpowers in Unit 1.

These failures revealed weaknesses in your preventive maintenance program and your ability to evaluate degraded conditions. This item will remain unresolved pending completion of your maintenance preventable functional failure evaluation and NRC review of your compliance with 10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," (Maintenance Rule).

9902250308 9902i9 PDR ADOCK 05000275

PDR

Pacific Gas and Electric Company-2-In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures willbe placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we willbe pleased to discuss them with you.

Sincerely, Linda J. Smit, A ing Chief Project Branch E Docket Nos.:

50-275 50-323 License Nos.: DPR-80 DPR-82 Enclosures:

1. Notice of Violation 2. NRC Inspection Report 50-275/98-20; 50-323/98-20 cc w/enclosures:

Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San I uis.Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo,.California 93408 Mr. Truman Burns)Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 41 02 San Francisco, California 94102

Pacific Gas and Electric Company-3-Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 David H. Oatley, Vice President Diablo Canyon Operations and Plant Manager Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112.

San Luis Obispo, California 93406

FEg j 9 l999 Pacific Gas and Electric Company-4-E-Mail report to T. Frye (TJF),

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector DRS-PSB MIS System RIV File DOCUMENT NAME: R:+DC'tDC820RP.DLP To receive co of document. Indicate In boxt "C" = Co without enclosures

"E" ~ Co with enclosures "N" = No co RIV:RI SRI DRS:EMB C:DRS/PSB C:DRS/

EMB DGAcker

~ti,mo,'l DLProulx 9l CAClark GMGood DAPowers 2/ >II/99 2/ I8/99 2/ 'l0 /99 2/ I /99 2//

/99 AC:DRP/E LJSmith 2/i'F99 OFFICIAL RECORD COPY

"Pacific Gas and Electric Company E-Mail report to T. Frye (TJF}

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to'Document Control Desk (DOCDESK)

E-Mail report to. Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector DRS-PSB MIS System RIV File DOCUMENTNAME: R:+DC>DC820RP.DLP To receive co ot document, Indicate In box: "C" ~ Co without enclosures E" ~ Co with enclosures "N ~ No co RIV:RI SRI DRS'EMB C:DRS/PSB C:DRS/

EMB DGAcker

""e.mrt, (

DLProulx 'tr.S r

CAClark -~.~'MGood DAPowers 2/ IS/99 2/ 8/99 2/ l4 /99 2/I /99 2/

/99'.

AC:DRP/E LJSmith 2N99 OFFICIALRECORD COPY