Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info
ML16342A898
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/20/1999
From: Steven Bloom
NRC (Affiliation Not Assigned)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9909230125
Download: ML16342A898 (6)


Text

Septenber 2

1999 Mr. Gregory M. Rueger Senior Vice President and General Manager Pacific Gas and Electric Company Diab(o Canyon Nuclear Power Plant P. O. Box 3 Avila Beach, CA 93424

SUBJECT:

EMERGENCY RESPONSE DATASYSTEM - DIABLOCANYON UNIT NOS.

1 AND 2

Dear Mr. Rueger:

In your letter dated June 18, 1999 (PG8 E Letter DCL-99-086) you forwarded information related to the planned hardware and software upgrades to the Diablo Canyon, Units 1 and 2 Emergency Response Data System (ERDS) links. The Data Point Libraries (DPL) submitted in this letter have been reviewed and although they conveyed the minimum information necessary to allow information transfer between your SPDS and the NRC ERDS computers, they do not provide adequate information to allow meaningful analysis of the data provided over ERDS.

Numerous applicable fields in most DPL data sheets were marked N/A. The purpose of this letter is to request that PG8 E update the ERDS DPLs submitted in your June 18, 1999, letter to provide the missing information. The Information which you provided has been forwarded to the NRC ERDS contractors to allow testing of your revised ERDS interface to proceed, however, the DPLs willnot be loaded on the production system at NRC Headquarters without the necessary amplifying information.

Guidance on the applicable information for all fields in the DPL data sheet is provided in NUREG 1394 (Rev. 1).

In addition, the NRC ERDS Project Officer, Mr. John Jolicoeur will coordinate with your staff to minimize any confusion concerning this request.

Mr. Jolicoeur may be reached at (301) 415-6383 or at e-mail address jrj1@nrc.gov and I can be reached at (301) 415-1313.

'Sincerely,

'RIG.

SIGNED SY Steven D. Bloom, Project Manager Project Directorate IV& Decommissioning Division'of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: See next page DISTRIBUTION:

-Docket--~

PUBLIC PDIV-2 Reading S Richards OGC ACRS JJolicoeur LSmith, Region IV o receive a co o

is ocumen, in ica e in e

ox OFFICE NAME DATE SB!o 9/

/99 EPe 9/ll /99 PDIV-2/PM C PDIV-2/LA C PDIV-2/SC SDembek 9/~/99 DOCUMENT NAME: G:'iPDjV;2}fiabloCanyon>EROS.wpd r>Q lI~

OFFICIALRECORD COPY v9omsoxas eqomo PDR ADQCK 05000275 P

PDR

C jl J

P L

1 I

'i M

~

gP,R REC0

~o C

O

~**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Septenbei 20, 1999 Mr. Gregory M. Rueger Senior Vice President and General Manager Pacific Gas and Electric Company Diablo Canyon Nuclear Power Plant P. O. Box 3 Avila Beach, CA 93424

SUBJECT:

EMERGENCY RESPONSE DATASYSTEM - DIABLOCANYON UNIT NOS.

1 AND 2

Dear Mr. Rueger:

In your letter dated June 18, 1999 (PG&E Letter DCL-99-086) you forwarded information related to the planned hardware and software upgrades to the Diablo Canyon, Units 1 and 2 Emergency Response Data System (ERDS) links. The Data Point Libraries (DPL) submitted in this letter have been reviewed and although they conveyed the minimum information necessary to allow information transfer between your SPDS and the NRC ERDS computers, they do not provide adequate information to allow meaningful analysis of the data provided over ERDS.

Numerous applicable fields in most DPL data sheets were marked N/A. The purpose of this letter is to request that PG&E update the ERDS DPLs submitted in your June 18, 1999, letter to provide the missing information. The Information which you provided has been forwarded to the NRC ERDS contractors to allow testing of your revised ERDS interface to proceed, however, the DPLs will not be loaded on the production system at NRC Headquarters without the necessary amplifying information.

Guidance on the applicable information for all fields in the DPL data sheet is provided in NUREG 1394 (Rev. 1).

In addition, the NRC ERDS Project Officer, Mr. John Jolicoeur will coordinate with:your staff to minimize any confusion concerning this request.

Mr. Jolicoeur may be reached at (301) 415-6383 or at e-mail address jrj1Onrc.gov and I can be reached at (301) 415-1313.

Si cerely,

/

Steven D. Bloom, Project Manager Project Directorate IV8 Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: See next page

l I

Diablo Canyon Power Plant, Units 1 and 2 cc:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant clo U.S. Nuclear Regulatory Commission P. O. Box 369 Avila Beach, California 93424 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Christopher J. Warner, Esq.

Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120 Ms. Nancy Culver San Luis Obispo Mothers for Peace P. O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. David H. Oatley, Vice President Diablo Canyon Operations and Plant Manager Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, California 93424 Telegram-Tribune ATTN: Managing Editor 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, California 93940

~

't

'