ML16342C091
| ML16342C091 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/02/1999 |
| From: | Pellet J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G Public Service Enterprise Group |
| References | |
| NUDOCS 9902050098 | |
| Download: ML16342C091 (10) | |
Text
CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9902050098 DOC.DATE: 99/02/02 NOTARIZED: NO DOCKET I FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION PELLET,J.L.
Region 4 (Post 820201)
RECIP. NAME RECIPIENT AFFILIATION RUEGER,G.M.
Public Service Electric
&, Gas Co. of New Jersey
SUBJECT:
Informs of plans to administer GFES of written operator licensing exam at PG&E facility on 990407.Names of candidates for exam Ec personnel proctoring exam requested by 990305.
'C DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR ENCL TITLE: Operator Licensing Examination Reports NOTES:
SIZE:
RECIPIENT ID CODE/NAME PD'4-2 PD COPIES LTTR ENCL RECIPIENT ID CODE/NAME BLOOM,S COPIES LTTR" ENCL INTERNAL: ACRS NRR/DRCH/HOHB EXTERNAL: NOAC FILE CENT GN LE 01 NRC PDR D
0 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATIONREMOVEDFROM"DISTRIBUTION LISTS DESK (DCD)
ON EXTENSION 415-2083 OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUM DOCUMENT CONTROL TOTAL NUMBER OF COPIES REQUIRED:
LTTR 8
ENCL
0 t~
Agg~
C<p0 0
~O UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Iv 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011-8064 FEB 2
I999 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B32 77 Beale Street, 32nd Floor P.O. Box 770000 San Francisco, California 94177
SUBJECT:
GENERIC FUNDAMENTALSSECTION OF THE WRITTEN OPERATOR LICENSING EXAMINATION
Dear Mr. Rueger:
The NRC plans to administer a Generic Fundamentals Examination Section (GFES) of the written operator licensing examination at your facility on April 7, 1999. The GFES willconsist of 100 questions.
The maximum time allowed to complete the examination is 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and the passing score will be 80 percent.
In order to nominate candidates, an authorized represe'ntative from your facility must submit a letter listing the names of candidates for the examination to the appropriate NRC Regional Administrator and to the Chief, Operator Licensing and Human Performance Branch. The letter must be received both in the Region and at NRC Headquarters by March 5, 1999, in order to allow us to assign docket numbers to the candidates and to make preparations for shipping the examinations to you for administration.
The letter must certify that the candidates willhave completed their fundamentals training by the date of the examination and are enrolled in your training program leading to an NRC operator or senior operator license.
The letter must also list the names of personnel you willbe using to proctor the examination and the address to which the examinations should be sent.
A sample registration letter is enclosed.
The address for the Operator Licensing and Human Performance Branch Chief is as follows:
Robert M. Gallo, Chief Operator Licensing and Human Performance Branch U.S. Nuclear Regulatory Commission Mail Stop OWFN 9 D24 Washington, DC 20555 9902050098 990202 PDR ADQCK 05000275 V
Pacific Gas and Electric Company Approximately 2 weeks prior to the examination administration date, your designated facility contact willbe sent a letter delineating examination particulars (i.e., proctor responsibilities, student I.D. numbers, etc.)
Sincerely, Docket Nos.:
50-275 50-323 License Nos.: DPR-80 DPR-82 John L. Pellet, Chief Operations Branch Division of Reactor Safety
Enclosure:
As stated cc w/enclosure:
Tim Blake, Director Learning Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 cc w/o enclosure:
Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns)Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102
\\
Pacific Gas and Electric Company Robert R. Wellington, Esq.
Legal Counsel Diablo Canyon independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 David H. Oatley, Vice President Diablo Canyon Operations and Plant Manager Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406
Pacific Gas and Electric Company bcc to DCB (IE42) bcc distribution by RIV:
DRP Branch Chief Resident Inspector S. Bloom, NRR (OWFN 13-E-16)
RIVfile L. Miller, TTD E. W. Merschoff, RA L. A. Hurley, GFES file DOCUMENT NAME: GFES1 To receive co of docum nt. indicate in box: "C" ~ Co without enclosures "E" ~ Co with enclosures "N" ~ No cop RIV:OB:LA LAHurle 02/
/99 N
C:OB JLPellet 02/ (/99
/ /99 OFFICIAL RECORD COPY
/ /99
ep