Forwards Summary Rept for Plant Startup & Power Escalation Testing for Cycle 9 of Waterford 3,which Resumed Commercial Power Operation on 970729 After Being Shutdown to Refuel for Cycle 9
ML20212A949
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/23/1997
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212A954 List:
References
W3F1-97-0247, W3F1-97-247, NUDOCS 9710270119
Download: ML20212A949 (2)


Text

- _ _ _ _ - - _ - _ _ _ _ - - - _ - - . - _ _ _ _ _ _ _ _ _ _ _ - - _ .

Ente y OperCtions,Inc.

Of Killona. LA 70006

, , Tel 504 739 6242 Early C. Ewing. lit i ety & Heoutatory /trans W3F197-0247 A4.05 PR October 23,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

<t

Subject:

Waterford 3 SES Docket No. 50-382

- License No. NPF-38 Startup and P:wer Escalation Report for Cycle 9 Gentlemen:

Attached is a summary report for plant startup and power escalation testing for Cycle 9 of Waterford 3, which resumed commercial power operation on July 29,1997 after being shutdown to refuel for Cycle 9. The reload fuel used in Cycle 9 involves a different design using erbia instead of B4 C as the burnable neutron absorber h the fue! rode. Therefore, this submittalis being made pursuant to Sections 6.9.1.1 and 6.9.1.3 of the Waterford 3 Technical Specifications.

If there are any questions, please contact me or Tim Gaudet at (504) 739-6666.

Very truly yours, t

]j

[b )

/Y E.C. Ewing Director Nuclear Safety & Regulatory Affairs ECE/RWP/tmm kl\,\$\,\$\\$$!!!,$$@, .

Attachment

~

971'0270119 971023 PDR ADOCK 05000302 P PDR i . -

.,. Startup and Power Escalation Report for Cycle 9 W3F197-0247 "

Page 2

. October 23,1997 cc: E.W. Merschoff (NRC Region IV)

C.P. Patel(NRC-NRR)

J. Smith N.S. Reynolds NRC Resident inspectors Office -