ML20195C714
ML20195C714 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 02/12/1986 |
From: | Hiatt S OHIO CITIZENS FOR RESPONSIBLE ENERGY |
To: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
References | |
FOIA-86-91 NUDOCS 8605300457 | |
Download: ML20195C714 (2) | |
Similar Documents at Perry | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARPY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999
[Table view]Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 ML20210K6331999-08-0404 August 1999 Submits Response to Requests for Addl Info to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, for Perry Nuclear Plant,Unit 1 PY-CEI-NRR-2417, Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-60001999-08-0202 August 1999 Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 ML20210G8411999-07-28028 July 1999 Informs That Based on Determination That Rev 14 Changes to Various Portions of Perry Nuclear Power Plant Emergency Plan Does Not Decrease Effectiveness of Licensee Emergency Plan & Meets Standard of 10CFR50.47(b),no NRC Approval Required ML20210E0661999-07-22022 July 1999 Forwards Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted.Overall Conduct of Activities at Perry Facility, Conservative & Professional with Continuing Focus on Safety PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld1999-07-21021 July 1999 Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-19019 July 1999 Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210A6441999-07-15015 July 1999 Advises That Listed Operator Licenses for Company Personnel Have Expired,As of 990715,per 10CFR50.74(a) & 10CFR55.5. Individuals Listed Have Assumed Responsibilities at Pnpp That Do Not Require Operator Licenses ML20209E5951999-07-0909 July 1999 Ltr Contract:Task Order 46, Perry Engineering & Technical Support (E&Ts) Insp, Under Contract NRC-03-98-021 ML20209D5931999-07-0101 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Investigation Rept 3-98-005 Issued on 990510.Corrective Actions Will Be Examined During Future Inspections ML20211A3881999-06-30030 June 1999 Supplements Re NRC Incomprehensible Enforcement Inactions.Understands That NRC Claiming Hands Tied in Matter Re Discrimination Violation at Perry Npp.Requests That NRC Take Listed Two Actions PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant1999-06-29029 June 1999 Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 9907061999-06-29029 June 1999 Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706 PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant1999-06-29029 June 1999 Submits Response to RAI Re GL 96-05 Program at Plant ML20196H9641999-06-29029 June 1999 Confirms 990615 Telcon Request with J Lieberman for Addl Time to Respond to Enforcement Action 99-012.FirstEnergy Has 60 Days to Respond to EA PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-19991999-06-28028 June 1999 Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999 ML20211A3991999-06-28028 June 1999 Submits Concerns Re Proposed Changes to Enforcement Policy. Believes That NRC Existing Regulations & Policies Provide Adequate Controls & That NRC Not Administering Consistent Enforcement Policies in Response to Discriminatory Actions ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 PY-CEI-NRR-2405, Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt1999-06-14014 June 1999 Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt ML20195H9051999-06-10010 June 1999 Forwards Two License Renewal Applications Consisting of NRC Form 398 & NRC Form 396 for Bk Carrier,License OP-30997 & Jt Steward,License OP-30564-1 ML20212H5841999-06-10010 June 1999 Responds to NRC Notice of Level III Violation Received by K Wierman.Corrective Actions:K Wierman Has Been Dismissed from Position at Perry NPP PY-CEI-NRR-2408, Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval1999-06-10010 June 1999 Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval ML20195G6741999-06-10010 June 1999 Forwards Insp Rept 50-440/99-03 on 990407-0517.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy PY-CEI-NRR-2407, Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records1999-06-0909 June 1999 Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARPY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999
[Table view]Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 PY-CEI-NRR-2417, Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-60001999-08-0202 August 1999 Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld1999-07-21021 July 1999 Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-19019 July 1999 Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210A6441999-07-15015 July 1999 Advises That Listed Operator Licenses for Company Personnel Have Expired,As of 990715,per 10CFR50.74(a) & 10CFR55.5. Individuals Listed Have Assumed Responsibilities at Pnpp That Do Not Require Operator Licenses ML20211A3881999-06-30030 June 1999 Supplements Re NRC Incomprehensible Enforcement Inactions.Understands That NRC Claiming Hands Tied in Matter Re Discrimination Violation at Perry Npp.Requests That NRC Take Listed Two Actions PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant1999-06-29029 June 1999 Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant1999-06-29029 June 1999 Submits Response to RAI Re GL 96-05 Program at Plant PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 9907061999-06-29029 June 1999 Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706 PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-19991999-06-28028 June 1999 Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999 ML20211A3991999-06-28028 June 1999 Submits Concerns Re Proposed Changes to Enforcement Policy. Believes That NRC Existing Regulations & Policies Provide Adequate Controls & That NRC Not Administering Consistent Enforcement Policies in Response to Discriminatory Actions ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 PY-CEI-NRR-2405, Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt1999-06-14014 June 1999 Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt ML20195H9051999-06-10010 June 1999 Forwards Two License Renewal Applications Consisting of NRC Form 398 & NRC Form 396 for Bk Carrier,License OP-30997 & Jt Steward,License OP-30564-1 ML20212H5841999-06-10010 June 1999 Responds to NRC Notice of Level III Violation Received by K Wierman.Corrective Actions:K Wierman Has Been Dismissed from Position at Perry NPP PY-CEI-NRR-2408, Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval1999-06-10010 June 1999 Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval PY-CEI-NRR-2407, Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records1999-06-0909 June 1999 Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records PY-CEI-NRR-2404, Submits Rept of Reduction in PCT Greater than 50 F Due to Implementation of Ge,Safr/Gestr LOCA Methodology for Fuel Cycle 8.Methodology Replaces Original LOCA Methodology1999-06-0707 June 1999 Submits Rept of Reduction in PCT Greater than 50 F Due to Implementation of Ge,Safr/Gestr LOCA Methodology for Fuel Cycle 8.Methodology Replaces Original LOCA Methodology ML20195E4561999-05-25025 May 1999 Submits Petition Per Other Actions Provision of 10CFR2.206,requesting That Radiation Protection Manager at Perry NPP Be Banned by NRC from Participation in Licensed Activities at & for Any NPP for at Least Five Yrs PY-CEI-NRR-2401, Forwards Changes to ERDS Data Point Library & Communication Survey for Perry Nuclear Power Plant.Changes Are Identified by Margin Rev Bars1999-05-20020 May 1999 Forwards Changes to ERDS Data Point Library & Communication Survey for Perry Nuclear Power Plant.Changes Are Identified by Margin Rev Bars PY-CEI-NRR-2402, Notifies of Completion of Plant Core Shroud Insp in Accordance with GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs,1999-05-18018 May 1999 Notifies of Completion of Plant Core Shroud Insp in Accordance with GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, PY-CEI-NRR-2394, Forwards Application for Order & Conforming License Amend for Transfer of Interest in OL NPF-58 for Pnpp.Authorization of Ceic to Possess Dl 13.74% Undivided Ownership in Pnpp, Requested1999-05-0505 May 1999 Forwards Application for Order & Conforming License Amend for Transfer of Interest in OL NPF-58 for Pnpp.Authorization of Ceic to Possess Dl 13.74% Undivided Ownership in Pnpp, Requested PY-CEI-NRR-2397, Forwards Revised COLR Cycle 8, & Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7,Cycle 8, IAW TS Section 5.6.51999-04-30030 April 1999 Forwards Revised COLR Cycle 8, & Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7,Cycle 8, IAW TS Section 5.6.5 PY-CEI-NRR-2396, Provides post-examination Results of Weld Overlay Repair for FW Nozzle to safe-end Weld at Pnpp.Info Supplements Licensee 990325 & 0401 Ltrs Submitted to NRC That Requested Approval of Repair Plan for 1B13-N1C-KB FW Nozzle to safe-en1999-04-28028 April 1999 Provides post-examination Results of Weld Overlay Repair for FW Nozzle to safe-end Weld at Pnpp.Info Supplements Licensee 990325 & 0401 Ltrs Submitted to NRC That Requested Approval of Repair Plan for 1B13-N1C-KB FW Nozzle to safe-end Weld 05000440/LER-1999-002, Forwards LER 99-002-00, LCO 3.0.3 Entered Due to TS Bases Statement Interpretation. Action Occurred After RHR Pump Failed to Start.Plant at No Time Was in Condition Where Required Decay Heat Removal System Were Not Available1999-04-26026 April 1999 Forwards LER 99-002-00, LCO 3.0.3 Entered Due to TS Bases Statement Interpretation. Action Occurred After RHR Pump Failed to Start.Plant at No Time Was in Condition Where Required Decay Heat Removal System Were Not Available PY-CEI-NRR-2388, Forwards Annual Environ & Effluent Release Rept for Pnnp Unit 1 for 1998. Pnpp Had No Liquid Effluent Discharges in 1998 & All Other Release Points Were Well Below Applicable Limits1999-04-22022 April 1999 Forwards Annual Environ & Effluent Release Rept for Pnnp Unit 1 for 1998. Pnpp Had No Liquid Effluent Discharges in 1998 & All Other Release Points Were Well Below Applicable Limits PY-CEI-NRR-2382, Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl1999-04-21021 April 1999 Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl PY-CEI-NRR-2371, Provides Suppl Response to Violations Noted in Insp Rept 50-440/98-18.Corrective Actions:Two Condition Rept Investigations Were Performed to Evaluate Issues Re Fire Protection Program & Addl Training Was Conducted1999-04-21021 April 1999 Provides Suppl Response to Violations Noted in Insp Rept 50-440/98-18.Corrective Actions:Two Condition Rept Investigations Were Performed to Evaluate Issues Re Fire Protection Program & Addl Training Was Conducted PY-CEI-NRR-2392, Forwards Diskette Containing Pnpp Thermoluminescent Dosimeter Doses in Format Requested by Reg Guide 8.7.Without Diskette1999-04-19019 April 1999 Forwards Diskette Containing Pnpp Thermoluminescent Dosimeter Doses in Format Requested by Reg Guide 8.7.Without Diskette PY-CEI-NRR-2387, Documents Telcon Held Between NRC Staff & Members of Perry Nuclear Power Plant Staff on 990406,re Safety Evaluation for License Amend 1051999-04-14014 April 1999 Documents Telcon Held Between NRC Staff & Members of Perry Nuclear Power Plant Staff on 990406,re Safety Evaluation for License Amend 105 PY-CEI-NRR-2386, Forwards Copy of Application Submitted to FERC Proposing Transfer of Jurisdictional Transmission Facilities of Firstenergy Corp Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing1999-04-0606 April 1999 Forwards Copy of Application Submitted to FERC Proposing Transfer of Jurisdictional Transmission Facilities of Firstenergy Corp Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing ML20206N3361999-04-0505 April 1999 Informs NRR of Continued Events Re Transfer of Generation Assets Between Duquesne Light Co & Firstenergy.No Negotiated Settlement Between Firstenergy & Local 270 Pertaining to Generation Asset Swap Has Been Reached PY-CEI-NRR-2383, Withdraws Inservice Exam Relief Requests IR-036 & IR-041, Submitted in Licensee to Nrc.Relief Request IR-041 Is Being Clarified with Respect to Alternative Proposed1999-04-0101 April 1999 Withdraws Inservice Exam Relief Requests IR-036 & IR-041, Submitted in Licensee to Nrc.Relief Request IR-041 Is Being Clarified with Respect to Alternative Proposed PY-CEI-NRR-2384, Provides Supplemental Info Re 990325 Request for Approval of Repair Plan for Feedwater Nozzle to safe-end Weld. Clarification Provided on Listed Three Items,Per 990329 Telcon with NRC1999-04-0101 April 1999 Provides Supplemental Info Re 990325 Request for Approval of Repair Plan for Feedwater Nozzle to safe-end Weld. Clarification Provided on Listed Three Items,Per 990329 Telcon with NRC L-99-052, Forwards Info Concerning Dls Decommissioning Planning for Bvps,Units 1 & 2 & Pnpp Unit 1.DL Is Continuing to Utilize External Sinking Funds to Provide Financial Assurance for Nuclear Decommissioning Funding1999-03-30030 March 1999 Forwards Info Concerning Dls Decommissioning Planning for Bvps,Units 1 & 2 & Pnpp Unit 1.DL Is Continuing to Utilize External Sinking Funds to Provide Financial Assurance for Nuclear Decommissioning Funding PY-CEI-NRR-2377, Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1)1999-03-29029 March 1999 Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1) ML20205H6171999-03-29029 March 1999 Forwards Util Consolidated Financial Statements for Twelve Month Period Ending 981231 & Internal Cash Flow Projection, Including Actual 1998 Data & Projections for 1999 PY-CEI-NRR-2380, Requests Approval of Attached Repair Plan for Feedwater Nozzle to safe-end Weld N4C-KB.Proposed Weld Overlay Design & Installation Plan Details Included in Attachment 1. Attachment 2 Provides Applicable Preliminary Weld Procedure1999-03-25025 March 1999 Requests Approval of Attached Repair Plan for Feedwater Nozzle to safe-end Weld N4C-KB.Proposed Weld Overlay Design & Installation Plan Details Included in Attachment 1. Attachment 2 Provides Applicable Preliminary Weld Procedure 1999-09-09 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20246L5571989-08-29029 August 1989
[Table view]Urges That Licensee Position on Exclusion of Drywell Oxygen Concentration for SPDS Be Rejected ML20244B0011989-03-0808 March 1989 Lists Facts to Consider for Action to Fix or Close GE Reactors Once & for All ML20247B1661988-09-14014 September 1988 FOIA Request for Investigative Rept on 861231 Incident at Facility & Allegation of Drunkenness Against Senior Manager ML20151M7161988-07-25025 July 1988 Notifies That Concerned Citizens of Lake,Geauga & Ashtabula Counties,Ohio Omitted from Svc List for Distribution of Fema,Epa & Other Documents Pertaining to 2.206 Petition Re Emergency Info Preparedness Handbook ML20151A6781988-07-11011 July 1988 Opposes Utils Request to Suspend Antitrust Provision of License.Suspension Will Result in Severe Harm to Both Existing & Future Municipal Electric Sys in Area ML20150A7961988-06-30030 June 1988 Comments on Util 880616 Request to Suspend Antitrust License Condition.Economic Advantages for Util Owning Nuclear Power Plants Have Failed to Materialize ML20151Y4441988-03-0707 March 1988 FOIA Request for All Documents Re Incident Involving Problems W/Closure of MSIV Which Occurred on 871029.Facility Shut Down on 871103,due to Valve Problem ML19306G8491988-03-0303 March 1988 Expresses Concerns Re 880217 Ltr to a Kaplan on Exigent Tech Spec 3.4.3.1 Change Requested on 880212 to Permit Continued Operation W/Upper Drywell Air Cooler Condensate Flow Rate Monitoring Inoperable ML20148D5471988-02-11011 February 1988 FOIA Request for All Records Re Recent Direction from NRR Mgt Concerning OL Amend Request for Facility Noticed in 871211 Fr.Excerpt from Weekly Info Rept for Wk Ending 880115 Encl ML20148H3881988-02-11011 February 1988 FOIA Request for Documents Concerning Recent Direction from NRR Mgt Re OL Amend Request in 871211 Fr W/Opportunity for Prior Hearing & W/O Making Significant Hazards Determination.Weekly Info Excerpt Encl ML20149E5151988-02-0303 February 1988 Forwards Comments Filed on Behalf of Western Reserve Alliance & Senior Citizens Coalition Re Request to Suspend Plant Antitrust License Conditions.Requests to Be Put on Mailing List to Receive Notices & Other Info Re Plant ML20149G5801988-02-0202 February 1988 Discusses Importance of Retaining Capability of Antitrust Action Intact Re Plant.Municipal & Other Sys Should Be Allowed to Continue to Utilize Electricity from Other Commercial Utils as in Past ML20147F3681988-01-0404 January 1988 Comments on Util 870918 Request for License Amend to Suspend Antitrust License Conditions.Amend Request Should Be Denied Since Motive Is anti-competitive & Thus Contrary to Spirit of Antitrust Provisions of Atomic Energy Act ML20235V3501987-10-0808 October 1987 Forwards Addl Supplemental Matl to Be Considered as Apps E & F of 2.206 Petition Filed on or About 870923 W/Nrc by Concerned Citizens of Lake,Geauga & Ashtabula Counties.Encls Discussed ML20207F7161987-04-0101 April 1987 Requests Reversal of NRC Previous Denials of 2.206 Petitions Based on Fraudulent Repts of NRC & Util ML20205E6661987-03-21021 March 1987 Comments on Proposed Amend to License NPF-58.Amend Re Planned Conversion of Inboard Containment Isolation Valve 1E51F063 from Normally Closed W/Dc Motor Operator to Normally Open W/Ac Motor Operator Opposed ML20207P7131987-01-0909 January 1987 Requests That NRC Take Immediate Action to Protect Public Health & Safety of States of Oh & Pa,Canadian Residents & Intl Shipping Lanes of Great Lakes Through Listed Actions. Certificate of Svc Encl ML20215D3171986-11-17017 November 1986 Opposes Opening of Facility Until All Risks Eliminated. Plant Should Not Open Until Further Testing Done ML20213D4831986-11-0606 November 1986 Urges Denial of Util Request for Exemption from 10CFR50,App E,Section IV.F.1.Util Should Not Be Granted Full Power License Until All Emergency Response Plan Flaws Addressed ML20205Q4221986-10-24024 October 1986 Requests That NRC Provide Criteria for Selection & Summary of Issues That Will Be Investigated Re Milam Allegations. Complete Info Re Status,Scope & Future Direction of NRC Investigation Also Requested,Per Manual Chapter 0517 ML20214T1671986-09-19019 September 1986 Comments in Opposition to Meeting Between NRC & WR Johnson of Aslab to Discuss Concerns Re 860131 Earthquake,Raised in .Meeting Constituted Illegal & Improper Ex Parte Communication.Requests Transcript Be Served on All Parties ML20213C7931986-09-12012 September 1986 FOIA Request for Documents Re Western Piping & Engineering Pipe Clamps Furnished to Perry 1 & 2 & Van Meter 820607, 0721,0818 & 840125 Complaints to NRC Re Design Deficiencies at River Bend ML20211C5631986-09-12012 September 1986 FOIA Request for Three Classes of Documents Re Use of Western Piping & Engineering Clamps at Perry Nuclear Power Plant & All Complaints/Correspondence Involving Deficiency Complaint at River Bend Plant ML20214K6391986-08-14014 August 1986 Expresses Concerns,Per R Marabito 860806 Suggestion,Re Use of Warning Sirens Consistent W/Plant Evacuation Plan.Sirens Cannot Be Heard Inside Homes ML20205C7031986-08-0505 August 1986 Contradicts Util Contention Re Absence of Earthquakes Near Plant.Earthquake in 1986 W/Magnitude of 6 Occurred ML20212B0551986-07-29029 July 1986 Forwards Newspaper Articles Expressing Concerns & Deficiencies W/& in Plant Evacuation Plan.W/O Stated Encl ML20215D8511986-07-20020 July 1986 FOIA Request for Procedure & Criteria for Removing Commissioners,Estimate of Actual & Projected Deaths from Chernobyl & Max Possible Deaths & Injuries from Accidents at Perry & Davis-Besse Power Plants ML20205S2391986-05-10010 May 1986 FOIA Request for All Documents Re 860418 & 30 Meetings W/Nrc,Util & USGS Concerning 860131 Earthquake Near Plant & Area Geology & Seismicity ML20205S2821986-05-0606 May 1986 FOIA Request for Testimony Prepared by NRC or Consultants, Including Usgs,Concerning Effect of 860131 Earthquake on Plant for Presentation at Appeal Board 860512 Evidentiary Hearing ML20198K2621986-05-0505 May 1986 Partial Response to FOIA Request for Access to Encl 1 of CE Norelius Re Allegations About Improper Work Done by Metalweld Co & Addl Info Obtained Since 851018.App a Documents Being Placed in PDR ML20210Q4071986-04-18018 April 1986 FOIA Request for Any Communications or Correspondence Re Licensing of Perry Nuclear Power Plant Received from Any Person or Party Since Jan 1986 & Any Documents Re NRC 860417 Decision Re Appeal Board 860417 Decision ML20202J7661986-04-12012 April 1986 Objects to NRC Dishonest Tactic Used to Discredit Ocre 860203 2.206 Petition Re Facility Seismic Design in Light of 860131 Earthquake.Statement on Page 9 of Director'S Decision DD-86-04 Untrue.Ocre Did Not Make Statement ML20197E8991986-04-0101 April 1986 FOIA Request for Encl 1 to CE Norelius to MR Edelman Re Allegations of Improper Work Done by Metalweld, Inc ML20154R6121986-03-25025 March 1986 Requests 860408 Telcon Be Rescheduled for 860404 & Deadline for Notification of Participants Be Rescheduled for 860331. Author Will Represent Ocre in Conference ML20140F0841986-02-18018 February 1986 Requests Info Re Ability of Plant to Withstand Earthquakes, Such as Event on 860131.Expresses Concern W/Plant Safety, Impact on Residents & Consequences of Serious Damage ML20212K4361986-02-13013 February 1986 Expresses Concern Re Plant Offsite Emergency Plans.People in Area of Plant Should Be Assured That Problems After 860131 Earthquake Are Considered in Licensing Decision ML20195C7141986-02-12012 February 1986 FOIA Request for Documents Re Damages Occurring to Nuclear Power Plants Following Earthquakes & 860131 Earthquake Near Perry Site,Procedures,Techniques,Repts & Results of Insps & Testing ML20137Y2491986-02-0404 February 1986 Forwards Newspaper Articles Re Recent Earthquake Near Facility & Requests That Commission Reexamine All Facts Considered When Granting Util Request to Build Nuclear Plant on Site ML20137Q3201986-02-0404 February 1986 Requests Closure of Listed Plants &/Or Independent Investigation of Qa/Qc Problems to Protect Residents of Canada & States of PA & Oh.Plants Have Inadequate Seismic Design.Site Located on Earthquake Fault Line ML20137P8611986-01-29029 January 1986 Forwards 860117 Summary of NRC 851218 Meeting W/Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Igniters & Associated Sys.Info Supports ASLB Wording of Issue 8.W/o Encl.Related Correspondence ML20138D6331985-12-10010 December 1985 Notifies That Author Cannot Be Present at 851219 Oral Argument Re Facility Proceeding Due to Family Illness. Another Ocre Representative Unavailable.Rescheduling of Oral Argument Would Be Appreciated ML20137U2611985-12-0303 December 1985 Responds to 851120 Order Requesting Name of Person Presenting Oral Argument.Sl Hiatt Will Present Oral Argument ML20137B1181985-11-22022 November 1985 Requests Reconsideration of Intention to Delete Fire Protection Elements from Facility Tech Specs.If Change Occurs in Current Time Frame,After Proceedings But Before Licensing,Hearing Requirement of Sholly Rule Will Not Apply ML20138R1541985-11-19019 November 1985 Expresses Appreciation for Commissioner Zech Ltr Re Intervenor Attendance at 851112 Plant Tour & for Critique Following Tour Concerning Fuel Load Date.Served on 851126 ML20137E2511985-11-18018 November 1985 FOIA Request for Access to Encl 1 of CE Norelius to MR Edelman Re Allegations About Improper Work Done by Metal Weld,Inc ML20244D7651985-10-0505 October 1985 Notifies of Potentially Serious Deficiencies in GE Design Control,Qa/Qc Program at Plant.Proposes Meeting W/Nrr Div on GE Reactors,Div of Safeguards & Ofc of Investigations to Review Rept by Gap Consultant ML20138F3361985-09-23023 September 1985 FOIA Request for Deviation Analysis Repts from Cleveland Electric Illuminating Co ML20133H6351985-08-0505 August 1985 Forwards Newspaper Article Re Unsuccessful Drywell Structural Integrity Test at Facility,For Info.Related Correspondence ML20128Q2591985-07-19019 July 1985 Submits Comments on Util 850717 Presentation & Tour of Facility.Util Neglected to Mention Effects of Merger W/ Toledo Edison Announced in Late June.Question Raised Re Whether Same Persons Will Manage Davis-Besse & Perry ML20129H6821985-07-15015 July 1985 Forwards Documents Re Issue 8 Concerning Hydrogen Control to Aid in Proceeding Relevant to Unit 1 Fuel Load Date 1989-08-29 |
Text
__. _ . - _ - _ _
,/7 .
/-
h^
February 12, 1986 Mr. J . fi . Felton, Director Division of Rules and Records FREEDOM OF INFORMApor!
Orrice or Aeniniseroeion ACT REQ U.S. Nuclear Regulatory commission Uoshington, D.C. 20555 fg ,UEST /
j FREEDOM OF INFORt1ATION ACT PEQUEST "MY[
Dear Mr. Felton:
Pursuant to the Freedom of Information Act, 5 USC 552, os _
omended, and the provisions of 10 CFR Port 9, the undersigned hereby requests the following:
- 1. any procedures, standorcs, or criterio the NRC may have for determining that no functional domoge has occurred to o nuclear power plant following on earthquake exceedi.ig the o.perating basis earthquake;
- 7. 011 Procedures, techniques, reports, and results of the inspections (and any testing) of the Perry Nuclear Power plant conducted by NRC personnel or consultants following the January ;
31, 1986 sorthquake near the Perry site;
{
- 3. the nomes of all NRC personnel and consultants participating in said inspection; l i
l y
- 4. oli procedures, techniques, reports, and results of the inspections (and any testing) of the Perry Nuclear power Plant f conducted by the Clevelond Electric Illuminating Co., its consultants or agents, or industry organizations following the -
January 31, 1986 earthquake near the Perry site;
- 5. 011 records, readings, and interpretorions thereof of j seismic instrumentation and clarms in the Perry Nuclear Power Plant for the January 31, 1986 earthquake occurring near the . .
j Perry site;
- e. any procedures, standards, techniques, or criteria the NRC -
may have for deternining whether .o fault is a capoble fault and whether o Power reactor license applicant's investigation of faults and/or seismic events is reasonable and adequate;
- 7. ony frequency or probabilistic standards or criterio for the expected occurrence of the operating basis earthquake and the safe shutdown earthquake;
- 8. all procedures, techniques, reports, and results of any investigations or studies conducted by the NRC, its consultants, or any other entity, into the Perry site area (and vicinity) geology and seismology following the January 31, 1986 earthquake; 8605300457 860212 PDR FOIA HIATT86-91 PDR
c.--- ,, ,. . . . . .., ,.- .. ........,,...s. .. . . . ..
. .. . . . . . . . . . . . . - ..+w--
f
' ~ Page 2
?, OGY evoluotions the NRC Or Lts consultants may m.tv e performed of the January 31, 1986 'eo r thqua k e and its effect on the Perry Nuclear Power Plant and on prevsous safety evaulations Of site area geology and seismology ond the selected design basis (sofe shutdown) earthquoke.
I agree to accept the charges for these items, and I would appreciate o prompt response to this FOIA request.
Sincerely, Susan L. Hioet GCRE Representorsve 8275 Munsen Rd.
Menter, OH 44060 (21e) 255-3158 1
i l
l l t
_m