Requests Info Re Indices for Normal,Abnormal & Emergency Operating Procedures,Descriptions for Sys 15,16,17 & 18 & 11 by 17-inch Piping & Instrument Diagrams to Suppl Plant PRA for Development of Risk Based Insp Quide
ML20154K918
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/22/1988
From: Buckley B
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8809260044
Download: ML20154K918 (6)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

September 22, 1988 Distribution Docket Nos.: 50-325 eDocket File J 50-324 NRC PDR Local PDR PD21 r/f S. Varga (14E4)

Mr. E. E. Ut' ley G. Lainas Senior Executive Vice President E. Adensam Power Supply and Engineering P. Anderson and Construction B. Buckley P. O. Box 1551 OGC Raleigh, North Carolina 27602 E. Jordan (MNBB 3302)

8. Grimes (9A2)

Dear Mr. Utley:

ACRS(10)

S. Long (10A2)

Subject:

Development of Risk-Based Inspection Guide - Brunswick Steam Electric Plant, Units 1 and 2

!~ The NRC has a program for producing plant-specific inspection guidance for lant's Probabilistic resident inspectors,)

Risk Assessment (PRA . utilizing The the Risk-Based risk insights Inspection from Guide a p(RIG) for a particular plant contains information about its dominant accident sequences, the importance of the various plant systems that contribute to these accident sequences, and the more risk-significant failure modes of the important systems. Any platit-specific vulnerabilities are highlighted for the resident. In addition, inspection checklists are provided for the most risk-significant failure modes.

In order to produce a RIG for Brunswick, we will need the following in1ormation to supplement what we have in your PRA:

1

1. Indexes for normal, abnormal and emergency operating procedures.
2. Mode 1 normal operating procedures, abnormal operating procedures and

- emergency operating procedures for the systems listed in Attachment A.

3. If not included in the normal operating procedures, the Mode 1 system line-up checklists for systems listed in Attachment A.
4. System descriptions (typically from operator training materials) for systems 15,16,17, and 18 on Attachment A.
5. 11" x 17" piping and instrument diagrams listed in Attachment B.

l Of*'

t N K p1 0

. e e

2 If you would like te discuss or clarify any of the requested items, please contact Steve Long at (301) 492-3162.

Thank you for your cooperation in our efforts to make our inspection efforts i more efficient and effective.

The reporting and/or recordkeeping requiremerits contained in this letter

affect fewer than ten respondents; tt.erefore, CNB clearance is not required under P.L. 96 511.

Sincerely,

\6\

Bart C. Buckley, Senior Project Manager Project Directorate II.1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation ,

Attachments:

As stated J

1 j '

0FC :LA: 62 f\ n

DNPR :PH:P 1;(RPR :0:PD PR  :  :

~

l HAME  : pan r

. J.....:...J.

.J w :BBuck ey

')......

, (An

[

DATE :9A9) /88

9/7I/88 194r.f

/88  :  : ,

I

m Mr. E. E. Utley Brunswick Steam Electric Plant Carolina P e r & Light Company Units 1 and 2 cc:

Mr. P. W. Howe Mr. J. L. Harness Vice President Plant General Manager Brunswick Nuclear Project Brunswick Steam Electric Plant lox 10429 P. O. Box 10429 Southport, North Carolina 28461 Soutnport, North Caroline 28461 Mr. R. E. Jones, General Counsel Mr. H. A. Cole Carolins Power & Light Company Special Deputy Attorney General P. O. Box 1551 State of North Carolina Raleigh, N)rth Carolina 27602 Post Office Box 629 Raleigh, North Carolina P7602 Mr. Mark S. Calvert Associate General Counsel fir. Robert P. Gruber Carolina Power & Light Compt.ny Executive Director Post Office Box 1551 Publi, Staff - NCUC Raleigh, North Carolina 27602 Post Office Box 29520 Raleigh, North Carolina 27626-0520 Mr. Christopher Chappell, Chairman Board of Connissioners Post Office Box 249 Bolivia, North Carolina 28a22 Nrs. Chrys Baggett State Clearinghouse Budget and Management 116 West Jones Street Raleigh, North Carolina 27603 Resident Inspector U. S. Nuclear Regulatory Commission '

Star Route 1 Post Office Box 208 Southport, North Carolina 28461 Regional Administrator, Region !!

U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 l Atlanta, Georgia 30323 Nr. Dwayne H. Brown, Chief Radiation Protection Branch -

Division of Facility Services N. C. Dr.partment of Human Resources 701 Barbour Drive f Raleigh, North Carolina 27603-2008

. j

ATTACRMENT A Systems Analyzed'in BSEP PRA for Which Additional Information is Requerted

1. High Pressure (
  • ant Injection
2. Reactor Core Isolation Cooling
3. Control Rod Drive (CRD) Hydraulic
4. Automatic Depressurization
5. Core Spray
6. Residual Heat Removal
7. Standby Liquid Contro*
8. Emergency Diesel Ganerators l
9. AC Power
10. DC Power
11. Emergency Core Cooling System Actuation a) HPCI Actuation to F001, F006 r b) RCIC Actuation to F013, F045 l c) Actuation to RHR valves F015A, F015B d) LPCI Actuation to C002A, 0002B, 0002C, C002D e) Actuation Signal to E21-F005A, E21-F005B f) CSS Actuation to E21-0001A, C001B
12. Service Water
13. Reactor Building Closed Cooling Water
14. Heating, Ventilating and Air Conditioning l

15.* Condensate l

l 16.* Feedwater

[

l 17.* Reactor Protection 18.* Instrument Air I

  • Not modeled in PRA.

i ATTACHMENT B BSEP-PRA/ RIG EFFORT DRAWINGS REQUIRED DUE TO MINOR ILLEC7BILITY OR NON-INCLUSION IN PRA Drawing No. Title D-2523, Sheet 1 Reactor Building Piping Diagram High Pressure Coolant Injection System, Sheet 1 Unit No. 2 D-2523, Sheet 2 Same, Sheet 2 D-2521-1A Main Steam System D-2521-1C Feedwater System D-2040-1 B Condensate Supply Grav. Unit 2 F-4073 Standby Gas Treatment D-2529, Sheet 1 Reactor Building - Piping Diagrks Reactor Core Isolation Cooling System, Sheet 1. Unit No. 2 D-2529, Sheet 2 Same, Sheet 2 D-25,16, Sheet 1A Reactor Building Piping Diagram Control Rod Drive Hydraulic System Sheet 1A, Unit No. 2 D-2516, Sheet 1B Same - Sheet IB D-2517-2D Instrument Air 70-75 PSIG D-7029-2A Instrument Air 30 PSIG F-P-50015-7 Reactor Protection System D-2520, Sheet 3A Reactor Building Piping Diagram Nuclear Steam Supply System Sh. 3A, Unic No. 2 D-2516, Sheet 1A Reactor Building-Piping Diagram Control Rod Drive Hydraulic System Sheet IA, Unit No. 2 D-2516, Sheet IB Same-Sheet *B F-3043 Units No. 1 & 2, Key One Line Diagram, 230KV, 24KV, & 4160 Volt Systems t

7____

Attar.hment B (cont'd)

Drawing No. Title )

l i

F-3044 Units No.1 & 2 Key One Line Diagram 480 Volt System F-3006 Unit No. 2 Single Line Diagran 125/250 Volt DC System Distribution Switchboard 2A & 25 D-20041-1 Piping Diagram-Service Water System Sheet 1 Sheet 1 - Unit No. 1 D-20041-2 Same - Sheet 2  !

D-20041-3 Same - Sheet 3 D-2034-1 Service Water to Discharge Canal 1

[

i

,_ . . _ . - . _ _ _ _ . _ _ _ _ _ _ , _ __ _ . . - . _ _ . _ . _ - . . . . _ _ _ . _ _ _ _ _ , , _ , . , . . __ . . - _ . . _ - _ _ . _ _ . .