ML20151D925
| ML20151D925 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/08/1988 |
| From: | Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| Shared Package | |
| ML20151D928 | List: |
| References | |
| NUDOCS 8807250293 | |
| Download: ML20151D925 (2) | |
See also: IR 05000302/1988016
Text
.
._
"'
.l.
.p.
,
=
.y _
JUL 0 81988
Florida Power Corporation
Mr. W. S. Wilgus
Vice President Nuclear' Operations
ATTN: Manager, Nuclear Licensing
P. O. Box 219
p
Crystal River, FL 32629-
Gentlemen:-
SUBJECT: REPORT NO. 50-302/88-16
This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by
T. Stetka on May 12' - June 8,1988.
The inspection included a review of
activitics authorized for your Crystal River facility.
At the conclusion of
the' inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
-Areas examined during the inspection are identified in the report.
Within
-these areas, the inspection consisted of selective examinations of procedures
and representative' records, interviews with personnel, and observation of '
<
,
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requiremente.
The violations, references to pertinent requirements, and
elements to be included in your' response, are described in the enclosed Notice
of Violation.
The third violation described in the enclosed Notice is similar to a violation
'
contained in the Notice sent to you by our letter dated October 26, 1987.
Because "similar violations," as described in the NRC Enforcement Policy, are
of-significant concern to the NRC, please give particular attention in your
response to the identification of the root cause of this problem and your
corrective action to prevent recurrence.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
-Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and-Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original signet' by
.
l-
Bruce A. Wilson, Chief
Reactor Projects Branch 2
l.
l
Division of Reactor Projects
i
Enclosures:
(Seepage 2)
\\\\
8807250293 880708
ADOCK 05000302
IEo/
f.
- Q
7
J
_-
..
, . -
.
l
Florida Power Corporation
2
JUL 0 81933
Enclosures:
1.
NRC Inspection Report
2.
cc w/encls:
P. F. McKee, Director, Nuclear Plant
Operations
E. C. Simpson, Director, Nucleta Site
Support
bec w/encls:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
State of Florida
i
R1
Rb{,3
MLewis
RCrienjak
6/d/88
'2g/7 /88