ML20138M343
| ML20138M343 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 02/18/1997 |
| From: | Gibson G SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20138M347 | List: |
| References | |
| NUDOCS 9702250348 | |
| Download: ML20138M343 (2) | |
Text
.
g som,-au,ou-
. EDISON 4
,=
I An LDISON IVTI RNATION Al Company
/
t i
February 18,1997 i
i U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 l
Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for January 1997 j
San Onofre Nuclear Generating Station, Units 2 and 3 l
i l
Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the l
San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Edison to provide a Monthly Operating Report of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit.
l Enclosures 1 and 2 provide the January 1997 Monthly Operating Reports for Units 2 l
1 cnd 3, respectively. There were no challenges to the pressurizer safety valves during January 1997, i
As a separate item, Enclosure 3 provides corrected pages for the October, November, cnd December 1996 reports for Unit 3. Changes are noted by revision bars in the right margin.
I If you have any questions, please contact Mr. C. E. Williams at (714)368-6707.
Sincerely, I_
/U E 250067 aregory T. oibson Manager, Compliance Enclosures I
cc:
J. E. Dyer, Acting Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV l
M. B. Fields, NRC Project Manager, Units 2 and 3 1
plf(
J. A. Sloan, Senior NRC Resident inspector, San Onofre Units 2 & 3 j
d 9702250348 970218 PDR ADOCK 0500o3611--
4 s
PDR P. O. Ikn 128 San Clemente, CA 92f 74-012H m
N Y
4 4
NRC Monthly Operating Report San Onofre Nuclear Generating Station, Unit 2 1
1 1
l
)
i 1
l I