Change Wiring of Flow Controllers 2YIC-926A for Spray Additive Tank Sys on C01 in CR for Unit 2
ML20138K808
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/15/1996
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20138K159 List: ... further results
References
IWP-95-035-01, IWP-95-35-1, NUDOCS 9702190168
Download: ML20138K808 (9)


Text

.

~

WO WORK PLAN Change Wiring of Flow Controllers 2YIC-926A For IWP 95-035-01 Spray Additive Tank System on C01 In The Control May 30,1996 Room UNIT 2 ,

1. SCOPE 1.1 The scope of this work plan is to implement wiring changes to correct indication on the spray additive tank flow controller 2YIC-926A on C01 in the control room and also to eliminate excess current of 145mA from flowing through the output meter and R72, exceeding the power rating of the resistor, which would damage the resistor.

1.2 The purpose of this modification is to eliminate excess current of 145mA flowing through the output meter and R72 and provide improved indications on the controller 2YIC-926A.

l 1.3 This approach of this installation is to remove 2YIC-926A from C01 and perform wiring changes within the controller. The work will be directed by this work plan.

1.4 This work is QA Scope.

1.5 Support Requirements

1. 5.1 Operations: Equipment isolation, tagouts
1. 5.2 I & C: Modification installation and testing
2. PRE rNSTALLATION REOUTREMENTS l

2.1 References; 1 2.1.1 Working Drawings:

A. Foxhoro Alpha WE 5362, SH.1, Rev. 5 2.1.2 Permanent Drawings:

A. P&ID Westinghouse 110E035 SH. 3, Rev. 36 9702190168 970210 PDR ADOCK 05000301 P ,

PDR ,, Page 1 of 8 en aj 0107 I 7">h t b 'Att VuJ noJkt oIyI A3"l3 kliektooc!M ec*CI k!ne 1 A An o2J !

r

~

l WO WORK PLAN Change Wiring of Flow Controllers 2YIC-926A For IWP 95-035-01 Spray Additive Tank System on C01 In The Control May 30,1996 Room UNIT 2 2.1.3 Component Instmetion Manual 8.4 Foxboro Composite Book 4 00623A4 Responsible engineer has assured that all references listed above are approved and are either with the installation group or attached and assigned to the installation group.

g R.E. .

M Date 912'7/%

2.2 Installation Preparation Activities:

2.2.1 In this installation, no material is required. If any additional wiring is needed, use wiring similar to the existing wiring in the controller.

Record Quality Assurance Release (QAR) numbers on the work orders.

2.3 Identification of Permits Required 2.3.1 The work order for this work plan has been written and submitted to CHAMPS. The WO number is 9604777.

2.4 Ooerational Installation Prereauisites:

2.4.1 The plant condition required is cold shutdown or refueling.

2.4.2 The spray additive tank outlet valve,2SI-831 A must be tagged shut as the spray additive tank suction valve,2SI-836A will be stroked following the installation of the modification per Operating Procedure 3C(OP-3C)

" Hot Shutdown To Cold Shutdown."

2.4.3 Release For Installation All of the above operational installation prerequisites have been met and it is acceptable to proceed with the installation.

d D'

Date fO,I6,9(oTime 74h 1

Page 2 of 8 hn 'J AI07I77hIh 'Akt VWJ 00Jkt af VIo*J'1*J klIeklA$eiM hC *CI kine lc en C"IJ

~

~

WO WORK PLAN Change Wiring of Flow Controllers 2YIC-926A For IWP 95-035-01 Spray Additive Tank System on C01 In The Control May 30,1996 Room UNIT 2 2.4.4 All other installation prerequisites have been met.

R.E. Date / L' ' ' " '.'c

./

1

3. INSTALLATION 1 3.1 OC Reouirements QC will be satisfied by the independent wire verification that will be perfonned at the completion of the installation.

3.2 Ingallation Descrintion:

NOTE: Thefollowing is a detailed step-by-step listing of the actions necessary to perform this IWP. These steps can be completed in any logical order.

If any of the steps cannot be completed as written or a change is necessary to complete the task, work must stop and the situation must be discussed with the responsible engineer orthe installation supervisor.

3.2.1 Verify 2SI-831 A is danger tagged shut.

222 2S %g W

/-

OPS 3.2.2 Isolate power to the controller by unplugging the power at the controller.

'fWc l 3.2.3 Remove flow controller,2YIC-926A, from C01, located in the control room. ,

./ ,

I

'(& C  ;

Page 3 of 8 en ; ninvinsiu nu vua no;u ntvin m uteunneru ac et une so ca o3J

m WO WORK PLAN Change Wiring of Flow Controllers 2YIC-926A For IWP 95-035-01 Spray Additive Tank System on C01 In The Control May 30,1996 Room

. UNIT 2 3.2.4 Remove normal /off switch S7 from termmal board positions 6 and the '

negative side of the power supply, the parallel connection 1

I&C 3.2.5 Place the switch in series with output point 6 as shown per working drawing Foxboro WE-5362, SH.1, Rev. SA1.  !

.. L a . _

I&C l l

3.2.6 Verify that wires listed in 3.2.4 and 3.2.5 have been moved.

Verifier 's Initials - , Date //J 9/, Time jfiff 3.2.7 Refurbish box capacitors with QA'd capacitors if necessary. l n)[- IIRTS 01 \C . c K. /'IH$ ,

4q9 LNirnod Tc frruf 6 LCn eA' f0 hvr K. (d M' 3.2.8 QC inspector to perform a visual inspection of module internals for quality of work. Inspect for solder bridges and cold solder joints.

QC's Initials p, Date //-. 9- 9t' Time / M'Z I

/'/hT- 3.2.9 Bench test controller to verify proper wiring installation.

GJ I&C 1 l

3.2.10 Insert flow controller 2YIC-926A into the control bomi. C01 ' hen

. reconnect power to the controller.

1&C fM6- 3.2.11 Check to make sure debris is cleaned up around location of work, then 1 installation is complete.

1 n-R.E./I.S.

Page 4 of 8 00 'j A1079") % !4. 'AL I Ut1 f AO fLt A f it i N1"l"t Llf PLIAASf M AFeef SIAN 80 CA ff"t f

~ ~~

WO WORK PLAN Change Wiring of Flow Controllers 2YIC-926A For IWP 95-035-01 Spray Additive Tank System on C01 In The Control May 30,1996 Room UNIT 2 1

3.3 As-Built Description This IWP was installed by: , _ m Date / /- M- 9 (- -

The installation was performed in accordance with this IWP and working drawing Foxboro WE-5362, SII.1, Rev. sal Attach any additional documentation of this as-built description to this IWP.

]

The installation of this IWP is complete.

R.E. >- L*T Date lllltl%

I.S. ,- .L _ - Date /////91

4. TESTING 4.1 Testina Prereouisites:

4.1.1 A stopwatch is needed for valve stroke testing.

4.2 Testine Information: l l

4.2.1 The intent of this testing is to verify the indicator on the controller indicates open when the switch is off. Also these wiring changes completed above should now eliminates excess current flowing through l the R72 resistor.

NOTE 1: The valve stroke open time is defined as the elppsed dme when the valve controller is positioned to the maximum open speedposition in the manualmode and the time that the valve open light is received on the active status board.

NOTE 2: The valve stroke closed dme is defEned as the elapsed time when the valve controller is posidened to the maximum closed speedposition in the manualmode and the time that the valve ceases motion in the closed direction by local observation.

Page 5 of 8 IO 'J A f A") f "J% f A 'All Vtj i An fLf A f \f f A'1'1"? Lt f OttAA6i M ee ef Lthe 1O CA O*T .f

WO WORK PLAN Change Wiring of Flow Controllers 2YIC-926A For IWP 95-035-01 Spray Additive Tank System on C01 In The Control May 30,1996 Room UNIT 2 4.2.2 Place the switch in the manual position, and open 2SI-836A.

Record the time to open. 9. I'3 Check Iacal VPI that it indicates nill ope.._ .-

Check 2SI-836A active status panel light is on. .

OPS -

4.2.3 Close 2SI-836A. 3 O Record the time to close.MN G d-Check Local VPI that it indicates full close__ _-

Check 2SI-836A active status panel light is off. ~ ~_ ~

rw o,w;x x,wns ne run 0 Anu 1er ~i~

wroutor2d >.a (a.Jt)Je ssas.2 tm. ia'rewn" <nurw o,* Piscwl owreciw ,,1 w rp' n m i.a . D e % .~i (1.rr) ' "

,or n ,oago ,a w a aw,w newu ,avom e ,o OPS tmwi or n=p/ i cuestes s ry,+r eiatr -n ,,,as we <AraT.

4.2.4 Place the switch in the auto position, or as directed by the DSS.

OPS 4.2.5theCheck valveCriteria IST Acceptance operability binder. by comparing the valve da s

S 4.2.6 Place 2SI-836A controller's normal /off switch to the off position.

Verify that the valve goes open and the controller indication reads open as well.

OPS 4.2.7 Place 2SI-836A controller's nonnal/off switch to the normal position.

Verify that the valve goes closed and the controller indication reads closed as well.

W W'TW [pwTKPLA? is /7).+wv.rt PCR 02 01Recr7eJ .V H C J J ovi m r we -

PtMco is woernM." Mus Godwac pre of JWr- psonpJ(touuygogj,5

"" %""" 'rp ~ DMr oPA/ Parn7pp.

)

j ',," UM 1*

- ~~ M ~'~ [*g9 "- f'

  • a, as v.'
  1. ~ r r v 4.3.2 The testing is completed and adequately tests the modification and the associated installation:

Testing ~ - - ~ c m f.- Date /AA-//

R.E. tr' Date // - J L - N v

5.0 Restoration

5.1 Pre-Acceotance

5.1.1 The following items need to be completed prior to acceptance:

A. All ECRs have final approvals.

All items that need to be completed prior to acceptance have been completed.

, An .

I f R: E. .. , - w Date & 3 9 /,,

0 5.2 System Restoration:

5.2.1 Realign system as required for normal operations /per DSS. System ready for release.

L DSS Date d 7 4 Time / /

Page 7 of 8 e6 * )

. A l A") f ")? b f A 'Nf UU t Art fLt A t \f f A*f*f"1 611MtAAofu eesef L100 i O . CO 0"! J

, j WO WORK PLAN Change Wiring of Flow Controllers 2YIC-926A For IWP 95-035-01 Spray Additive Tank System on C01 In The Control May 30,1996 Room j

UNIT 2  ;

6.0 Restoration

6.1 Conditional Accentarg 6.1.1 The following items cannot be accepted and require resolution of the i listed conditions. Interim operating conditions are also listed l below(attach additional documentation as necessary).

6.1.2 Concurrence with Conditional Acceptance l

Mgr of Acceptance Group / DSS , -

Date antw 6.2 Final Acceptance 5.2.1 Realign system as required for normal operations /per DSS. System ready for release.

Mgr of Acceptance Group / DSS _

ate /2 /5'Ye RETURN TiiE COMPLETED IWP AND MODIFICATION REQUEST TO RESPONSIBLE ENGINEER Page 8 of 8

- o f 'J AIA7f77htb 'okt Vt.lJ 00JLt o t V t 63'13 kt f OktooOf M 00 0f LtAO IQ co_03J

4* y**=kN=*

IWP NUMBER: 95_-o35-oz P:ga / cf INSTALLATION WORK PL AN

~

G REC 0RD M As '

y _ -

A oQIFA T WORK PLAN i go . l FOR MODIFICATION # N ' OM ,MWRF [n O O 7 0 l

INSTALLATION WORK PLAN TITLE i SPnv Acorr,es -raa Dw ggpumoam Y12 - 924.8 l i

l I

UNIT 2. cA. SCOPE NON QA SCOPE l

l Originator . _

Date (# 3 :i6 Reviewer _ Date ~7 23 9d r I 1 Final Desi' .-

Group He .

-< s _ Date

/

[

Ouality Engineer Date F/#1/7[

Installation Group Head A Date F/ #

-' s sr ) H ,

3 7 Ma , .p . .

gj Operations or Disa Date 70 rusrcqy /

NOTE: Changes to this work plan must be done with the concurrence of the 1

responsible or toom engmeer and the installation surpevisor, or as delineated within the IWP. l DG G02.5  !