Requests Expedited Relief from Current 850331 Equipment Qualification Deadline for Facility Drywell & Oxygen Analyzers Until 851130 Due to Recent Change in Schedule for Upcoming Refueling Outage
ML20112H308
Person / Time
Site: Hatch, 05000365
Issue date: 03/27/1985
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
0551Y, 551Y, NED-85-195, TAC-57133, NUDOCS 8504020214
Download: ML20112H308 (2)


Text

\J

#8 Georgia Power Corrany 333 Piedmont Avenue Atlanta. Georgta 30308 Telephone 404 5266526 Maihng Address

Post Office Box 4545 At:anta. Georgia 30302 h Georgia Power L T. Gucwa the southem electnc system Manager Nuclear Engineenng and Ch:ef Nuclear Eng'neer NED-85-195 0551y March 27, 1985 Director of N1 clear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. N1 clear Regulatory Commission Washirgton, D. C. 20555 NRC DOCKET 50-366 OPERATItG LICENSE NPF-5 EIMIN I. HA'ICH NUCLEAR PLANP UNIT 2 REQUEST FOR EXPEDITED ACPION ON EQUIPMENT QUALIFICATION DEADLINE EXTENSION REQUEST Gentlemen:

By letter dated March 1,1985 (NED-85-061) , Georgia Power Coupany (GPC) recuested an extension of the 10 CFR 50.49 (g) eculpment cualification deadline for the Plant Hatch Unit 2 Drywell Hydrogen (H 2) and Oxygen (02) analyzers, from March 31, 1985 to November 30, 1985. Due to a recent change in the sched21e for the upcoming refueling outage at Unit 2, GPC is in urgent need of relief from this March 31, 1985 deadline, in order to avoid premature shatdown of the plant.

At the time that our letter (NED-85-061) was albnitted, Unit 2 was sched11ed to begin its next refueling outage in late March,1985. Since the plant was sched21ed to remain shatdown for about eight weeks, this meant that GPC effectively had until late May, 1985, to resolve this particxilar l

deadline issue with the NRC, witholt inpacting schedaled plant operation, i

However, the schediled shitdown date for that oatage was recently changed to j

April 5, 1985, which falls beyond the cxtrrent deadline for the H2 and O2 t

analyzers.

GPC therefore reglests that expedited relief be granted from the current ecpipntnt cualification deadline for the Plant Hatch Unit 2 H2 and O2 analyzers.- This relief would not create any undue hazard to the public health and safety based on the Justification for Contin 1ed Operation (JOO) l previaasly albnitted, which justifies plant operation using these analyzers with inconplete cualification.

I I

8504020214 850327 PDR ADOCK 05000365 p PDR 1 IJ

e' GeorgiaPower d Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 March 27, 1985 Page Two Should yal reach any decisions or have any cuestions regarding this recuest, please contact this office inmediately.

/ Very tmly yours,

$-[W L. T. G1 cwa CBS xc: J. T. Beckham, Jr.

H. C. Nix, Jr.

J. N. Grace (NRC - Region II)

Senior Resident Inspector 70077S