Provides Status of Environ Qualification Effort for Drywell Hydrogen & Oxygen analyzers.Architect-engineer Determined Equipment Located in Mild Environ Will Remain Operable During & for at Least 180 Days Following LOCA
ML20137T681
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/27/1985
From: Gucwa L
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
0036C, 36C, SL-17, TAC-57133, NUDOCS 8512090083
Download: ML20137T681 (2)


Text

y(+

y g

s

~ SN i GeorgiaMr C5mpany '

-i

@Mj 7-M A. '

~2 1333 Piedmont Avenuei gy Q.

"f

( Atlanta, Georgia 30308 :;

Telephone 404 5264526 '

. Jib ^

yd

"a,.

,1 4

~

' Mailing Address:-1.

' ^I t Post Offce Box 4545-j i 'e jAtlanta, Georgia 30302' '

{

~

~

GeorgiaPower?

~,

CT.GucweN the southem ekxtnc system S Manager Nuclear Engineering -

,[

r',

, and Chiet Nuclear Engineer r

q.

' ^

SL-17 o

y

~

November 27, 1985

~ %

Director.~of Nuclear Reactor Regulation

,i; (Attention:-:Mr'. D. Muller,! Project Director

BWR Project Directorate No.-21 "pl
Division of'8 oiling Water Reactor Licensing s ;

^

'[U.:S. Nuclear Regulatory; Commission-LWashington,"D. C. :205551

^

~

~NRC DOCKET 50-366

+

OPERATING LICENSE:NPF-5

'EDWINiI. HATCH NUCLEAR PLANT UNIT 2

~

m iSTATUS OF ENVIRONMENTALLQUALIFICATION EFFORT

'r FOR THE DRYWELL-HYDROGEN AND OXYGEN ANALYZER $

s.

^

y

~ IGentlemen:-

By fletter' dated ' August. 16, 1985 (NED-85-523),. Georgia Power Company.

(GPC) linformed; the NRC 'of L significant ' problems with the qualification

' effort fore the ~. Primary?- Containment.- Hydrogen -(H ) and OxygenE(0 ) gas 2

2 N

analyzersEdedicated for use at ~ Plant Hatch linits 1 and 2.

The - specific.

A

- problemsinoted in 'that letter had occurred : during. the Loss of Coolant -

4

- Accident 1(LOCA) testing for 'the heat < tracing on the sample input tubing lfor these_ analyzers.

g, T

~ Following ~the date-of ' submittal. of letter 'NED-85-523, the y

9 Architect / Engineer.(A/E) sfor.. Pl ant-Hatch-determined-that the-

< environmental :profiies (temperature / pressure) which the analyzer ! vendor

was1using to specify the qualification testing for the heat tracing -on;

~

the JH

.and /0 : analyzers,* were'- considerably more, severe ~ than.the 2 ^

2-conditions which this : equipment.is expected. to experience during design 4 -.

.basisfevents for which its function is required. The A/E then reanalyzed x

lf,yh 8512090003 851127 PDR tADOCK 05000366 m

p>

PDR 4

):

J

'.h:

^ e' r

a

e l

c Georgia Power

Director of Nuclear Reactor Regulation

~

4 Attention:

Mr.7D. Muller, Project Director

BWR~ Project Directorate No.-2 November 27,
1985 lPage Two th'e portions of the testing program which had been successfully completed and subsequently made a determination' that.the Hatch Unit 2 equipment,:

lwhich is : located in a mild environment, would remain operable-during and for-at least :180 days following any such event and is qualified for' its intended use at Plant Hatch.as required by 10 CFR'50.49.

~

Sincerely yours,

  1. f~ Q=4 L. T. Gucwa

'CBS/lc-

.c:

Mr.-J. T. Beckham, Jr.-

-Mr.1 H.-C. Nix,:Jr.

- Dr. J. N. Grace (NRC-Region II)

-Senior Resident Inspector.

~

.GO-NORMS

^ynny;g.