ML20100L017

From kanterella
Jump to navigation Jump to search

Forwards Application Fee,Per NRC ,To Cover 850301 Request for Extension of 10CFR50.49 Equipment Qualification Deadline for Drywell Hydrogen & Oxygen Analyzers Currently Installed at Facility
ML20100L017
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/09/1985
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
0573Y, 573Y, NED-85-301, TAC-57133, NUDOCS 8504160337
Download: ML20100L017 (1)


Text

. .- Georga Power Company 333 Piedmont Avenue At!anta, Georgia 30308 Telephone 404 52G6526 Maing Address:

Post Off;ce Box 4545 Atlanta. Georga 30302 h

Georgia Power L T. Gucwa tre southem electoc system Manager Nuclear Engneenng and Chief Nuclear Engneer NED-85-301 0573y April 9, 1985 Director of N.1 clear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensity U. S. M1 clear Regulatory Oxtrnission Washington, D. C. 20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HA'ICH NUCLEAR PI. ANT UNIT 2 PAYENT OF APPLICATION FEE FOR EQUIPMENT QUALIFICATION DEADLINE EXTENSION REQUEST Gentlemen:

By letter dated March 1,1985, Georgia Power Conpany (GPC) alhnitted a request for extension of the 10 CFR 50.49(g) ecuipment malification deadline for the drywell hydrogen and oxygen analyzers currently installed at Plant Hatch Unit 2. By letter dated March 21, 1985, the NRC noted that an application fee of $150 is recnired by 10 CFR 170 for any alch recuest.

'Iherefore, GPC hereby remits the recnited fee payment - to cover the above referenced recuest.

Very truly ycurs; cf* C 4 : .

L. T. G1 cwa CBS xc: H. C. Nix, Jr.

NRC Regional Mministrator Senior Resident Inspector g4 I do op 8504160337 850409 f[M PDR ADOCK 05000366 1 P PDR p g #{j

.