Text

.

n y 11HHerlei eeClOgy action n n BOX 761 gh POTTSTOWN, PA.19464 . (215) 326 9122 Lawrence Brenner, Chairman Sep t emb er 6, '1964-

~

Administrative Judge U.S. Nuclear Regulatory Commission

,df my Washington, D.C. 20555

/!? ,*V

~'

Dr. Richard F. Cole Administrative Judge U.S. Nuclear Regulatory Commission Uas.hington, D,C. 20555 C

Dr. Peter A. Morris Administrative Judge U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Limerick Generating Station, Units 1 and 2 Philadelphia Electric Company Docket Nos. 50-352, 50-353 o (__,

Gentlemen, Enclosed please find Limerick Ecology Action's Respecification of Off-site Emergency Planning Contentions admitted by the B o a r d's Order of April 20, 1984 This filing is being made according to the schedule established by your Order of August 15, 1984 for the respecification of LEA's admitted Off-site Emergency Planning Contentions.

I have also enclosed the following supplemental information which I previously stated that LEA would provide to the Philadelphia Electric Company:

1)PSEA letter from Don Morabito dated 9/4/84 discussing concerns about teacher contract collective bargaining matters 2)PEMA Office of Training and Education, Report on the RERP.

Exercise at the Limerick Generating Station on July 25, 1984

3) Additional info on Respectfully submitted, LEA-24/FCE-1 (_j#

.!aureen Mull gan LEA Vice Pre ident 8409120311 840906 PDR ADOCK 05000352 0 PDR

  • Catawba Balancing Test For Late-filed Contentions i

In its July 26, 1983 Second Special Prehearing Con-farence Order, the Board directed Limerick Ecology Action (LEA) to address the factofs set forth in the Catawba decisions, which factors the Board will then balance in determining whether or not so-called " late-filed" contentions-are admissible.

The five factors of 10 CFR 52.714 (a) (1) are as follows:

(i) good cause, if any, for failure to file on time; (ii) the availability of other means whereby the petitioner's interest will be protected; (iii) the extent to which the petitioner's participation may reasonably be expected to assist in devel-opment of a sound record; 4

(iv) the extent to which the petitioner's interest will be represented by existing parties; i

(v) the extent to which the petitioner's participation I will broaden the issues or delay the proceeding.

The three-part test overlayed by the Appeal Board in Catawba (and affirmed by the Commission as appropriate in an j

admissibility determination) is that the contention:

(a)- is wholly dependent upon the content of a particular l

\

l

1. Duke Power Co. (Catawba Nuclear Station, Units 1 and 2) ,

l 1 ALAB-687, 16 NRC 460, 469-70 (1982); Duke Power Co.

l (Catawba Nuclear Station, Units 1 and 2), CLI-83-19, j 18 NRC , , slip op. at 5-6 (July 1, 1983).

i

~

O L

document; (b) could therefore not have been advanced with any degree of.specifity (if at all) in. advance of the public availability of the document; and (c) is tendered with the requisite degree of promptness once the document comes into existence and is accessible for public examination.

Limerick Ecology Action has respecified previously admitted off-site emergency-planning contentions, pursuant to the Board's Orders, and hereby. addresses the'five 2.714 (a)(1) factors as overlaid by the three part test.

, LEA first submitted emergency. planning contentions in this proceeding on Nov. 24, 1981, based on all available information at that time.

The Board's June 1,.1982 Special Prehearing Conference Order stated that the " Board finds that emergency planning contentions should be deferred-until the emergency plans are available" (p.156). The  ;

schedule-for filing "off-site" emergency planning contentions.was established by the Board's Order of May 16, 1983 (Second Prehearing Conference Order). Page 5 states, "The triggering event for submission-of these contentions-will be the receipt by intervenors and the City of Philadelphia of the emergency plans as they are being sub-mitted to FEMA following PEMA's review of them." The Applicant served these documents on Dec. 9, 1983. The Board's Order of Jan. 20, 1984, established a' filing deadline of Jan. 31, 1984 for the recepit of all "off-site" emergency planning contentions. On April 20, 1984, the Board ruled on the admissibility of LEA's contentions, chosing to admit some of the contentions, and to again defer others.

Discovery on LEA's admitted "off-site" emergency planning contentions lasted from April 20, 1984 to June 25, 1984. On August 15, 1984, the Board issued an Order that established the schedule for respecification of LEA's admitted contentions, which required service on all parties by Sept. 6, 1984 (receive dates).

-Limerick Ecology Action has good cause for filing these contentions according to the schedule discussed above. These contentions could not have been advanced with any more specificity on an earlier schedule

~

due to the fact that much 'of the Applicant's consultant's work on the development of off-site emergency response plans is yet to be completed. LEA's respecification of admitted contentions has been

" tendered with the requisite degree of promptness" since we are fol-lowing the schedule established by the Boards Orders of April 20,1984 and August 15, 1984. LEA has no other means to protect its interests relating to "off-site" emergency planning contentions in that no other regulatory or judicial body has jurisdiction to hear LEA's concerns'in a. timely fashion. It is the NRC's duty, under its licensing authority to review all matters relevant to the licensing and operation of the Limerick facility, and that authority cannet be userped by any other body.-Furthermore, considering the potential

~

political and other interests that influence their decision-making, participating governmental entities cannot beexfected to adequately represent LEA's interests. .

t

, i No other intervenor has standing on "off-site" emergency planning issues that can represent LEA's interests. The only individual intervenor that had any contentions admitted on "off-site" emergency planning issues has been consolidated under LEA.

LEA's participation in this matter can be expected to assist in the development of a sound record in this proceeding. LEA hopes to obtain expert assistance in pursuing many of its contentions, which while not required for licensing proceedings, is ar, aid to the Board as well as to LEA.

While the litigation of LEA's contentions may broaden the issues to be heard by the Board in this proceeding, and may impact the Applicant's schedule due to the fact that "off-site" emergency planning contentions are the only issues remaining to be litigated in this case, LEA did nonetheless raise these matters in a timely matter in 1981 when other contentions were first filed.

Overall, for the reasons set forth above, LEA believes that it is appropriate for the Board to accept LEA's voluntary narrowing and

, focusing of LEA's admitted "off-site" emergency planning contentions.

Sept. 6, 1984

^

c, , ', ,

, "I'AW4CL)ltt$ ,

LEA-11 The draft Chester and Montgomery County and School District RERP's are deficient in that there is insufficient informati,on

'available to reasonably assure that the numbers of buses to. meet the needs of any of the schools are available, or that they will be-able to reach the schools during a radiological emergency.

Specifically, 1.'There is no assurance that bus companies are committed to providing even a " minimum" number of buses to assist in an evacuation in the event of a radiological emergency at Limerick.

2. School District and County RERP's do not contain reliable letters of agreement with bus companies in that:

a) there are no stated and set forth obligations b) bus contracts are vague and unenforceable 3.'There are no provisions for transportation from host schools t'o mass care centers,-nor any assurance that bus companies are even aware of transportation needs beyond host schools.

4. School District and County RERP's are deficient because they

^

fail to indicate assignment of buses to particular schools, including required mobilization time.

5. Radiological emergency planning for School Districts adjacent to and outside the Plume EPZ must take into consideration whether or not bus resources have been conmitted to provide assistance in the EPZ in the event an evacuation is recommended. These School Districts must develop emergency procedures that do not conflict with agreements made by bus companie,s to provide transportation assistance to risk school districts within the EPZ.

For example, page I-2-9 of the Montgomery County RERP, draft

  1. 6 indicates that North Penn School District operates 66 buses.

Due to the fact that the section marked " units available for mobilization" and " Limerick assignments" are ' blackened out' in the plan, it is very difficult to determine where and if these buses have been assigned to assist with an evacuation within the EPZ. In addition, North Penn High School is a Mass

1 I

N Care Feeding is important C' enter. and a Transportation S taging Area. It to verify that normal and/or early dismissal  ;

procedures for this School District due to a radiological

-- emergency at Limerick wguld not interfere with or take ,

i precedent a risk schooloverdistrict.

a commitment to provide assistance evacuating

6. There is no assurance that unmet transportation needs identified in the most recent draft county RERP's have been or can be obtained.

.7..There is no. assurance that buses sent from other areas can evacuate children in a timely manner, due to the fact that the RERP's fail to include. assignment listings and re-quired mobilization time.

8. Shere'is no-basis for the assumption in the Applicant's HMM Evacuation Time Estimate Study that "up to one hour may be required to assemble buses, transport vehicles and to load students onto buses". (page 5-5)

On June.8th, 1984, Dr. Claypool announced an early dismissal of the Owen J. Roberts School District, which indicated that unless bus drivers were notified while they were physically in their buses, that-at least a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> de-lay should be anticipated before Owen J. Roberts School District would have enough buses for an_early dismissal.

(See Attachment #1 of LEA's'7/16/84 Response to Philadelphia Electric Company Interrogatory Responses ---- Memo from Dr. Claypool, District Superintendent, dated 6/12/84)

9. Chester County has not obtained any written agreements with 3

. bus companies to provide transportation for School Districts i in the event of a radiological emergency. (Conversation with  ;

John MecNamara, Assistant Director of Emergency Services for I Chester County 9/5/84). ~

a 10.-Additional traffic control measures are necessary around School District buildings to insure that parents attempting to pick up their children will not block the access of buses to the school attempting to transport children to a host school.

(See 5/1/84 letter from Dr. Claypool, Superintendent at [

Owen J. Roberts School District to John McNamara, Cheater @

County Dept. of Emergency Services, page 4, included with PEMA's 7/11/84 Answers to LEA Interrogatories.) ["

BASIS: '10 CFR 50.47 (a ) (1) , (2)(b); NUREG 0634, Criteria D.4:

School District and County RERP's

l i

l LEA-12

-The draft Montgomery, Chester, and Berks County RERP's and the School District RERP's are not capable of being implemented because there is no reasonable assurance that there will be sufficient numbers of teachers and staff required to stay at school during

.a radioNogical emergency if sheltering is recommended as a protect 1.'e measure, or that there will be sufficient numbers of school staff available to evacuate with children in the event

  • of a radiological emergency. Therefore, children are not adequately protected by the draft RERP's.

Specifically,

1. Adequate consideration has not been given to parental / child behavior and to family decision making patterns in the emer-gency planning process. Families residing within the 10 mile EPZ have not been given any information or instructional brochures.

To be effective, emergency planning information must be widely disseminated, extremely detailed, and available in several languages. Most parents do not know much about the existence of emergency response plans for radiological emergencies. Few parents have seen a school or municipal emergency response plan. The-same is true for most teachers.

2. There has been no pre-identification of teacher volunteers willing to stay on duty in the event of a radiological emer-gency. There is no basis to assume that such performance is considered part of a teacher's contractual obligations. PSEA, the legally certified bargaining representative for all teachers (and other professional bargaining unit employees) sees a clear conflict between the evacuation plan provisions and virtually all collective bargaining agreements currently in place in the school districts. (See attached letter from Mr. Morabito, Regional Field Director for PSEA, dated 9/4/84.)

I l

3. There has been no determination of which school district l buildings are adequate for sheltering purposes. Lack of confidence in the workability of plans for carrying out sheltering as a protective measure will impact on the degree of confidence a teacher or school staff member will have in the safety of the plans, which will in turn bear on the willingness of teachers / school staff to stay on duty in the' event of a radiologiccl emergency. i
4. Post training surveying is necessary to determine if there is reasonable assurance that teachers / school staff are willingly making an informed decision to volunteer to participate in the event of a radiological emergency, and to evaluate the effectiveness of the training program.
5. Unnannounced evacuation and sheltering drills should betssed to determine the effectiveness of training programs, and will help to increase the degree of confidence that school staff /

teachers have in the workability of the school district Radiological Energency Response Plans. These assurances are critical to the workability of the School district-RERP's.

6. The School District RERP's do not require the provision of trained school staff on buses in the event an evacuation is ordered. The plans also fail to establish minimum staffing requirements to cope with the psychological trauma that children will undergo during a radiological emergency. Frantic, uncontrolled behavior may hamper energency response efforts.

BASIS: PEMA Report on the RERP Exercise at the Limerick Generating Station, on July 25, 1984, dated August 10, 1984 (Office of Training and Education): comments on page 5 regarding Pottstown School District, and page 10 regarding Boyertown School District - copy of the re-port is included with th1s filing.

10 CFR g 50.47(a) & (t)(1), (b) (') , (b)(15); NUREG 0654 Criteria A.1, Criteria A.2, Criteria A.3, Criteria G.1, Criteria N.1, and 10 CFR g 50-47 (b)(14).

School District RERP's, Basic Plan, Logistics of Evacuation II.G.3(d). (for all School District RERP's expect Owen J. Roberts)

9- /9 )

i PENNSYLVANIA STATE EDUCATION ASSOCIATION w-15 West Brinton's Bricge Road West Cheste'. Pennsylvania 19353

  • phone: 215/3994922 215!399-6923 Nancy M. Noonan, president John M. Yamovic, vice president J:mes Stevens, treasurer K. Eugene Preston, executive director September 4, 1984 To Whom It May Concern:

The following is in response to cuestions regarding the position of PSEA on the school district evacuation plans proposed by-PECO for the Limerick Generating Station.

First of all, let me make it clear that PSEA/NEA is the legally certified bargaining representative for all teachers and other professional bargaining unit employees in the majority of the school districts surrounding the Limerick Generating Station.

As the certified bargaining representative, PSEA is bound by the Public Employee Relations Act to represent our members in all matters concerning their " wages, hours, terms and conditions of employment."

After examining several of the proposed evacuation plans (which were almost identical), I contacted our legal division for their opinions on the issue. Mr. Anthony Newman, PSEA's general counsel, has advised us that any unilateral acceptance of these evacuation plans (which clearly impact on teachers' wages, hours and terms and conditions of employment) without bargaining the impact of such plans with the certified bargaining agent is an unfair. labor practice in violation of Section 1201, (a) (5) of the Public Employee Relations Act.

Mr. Newman also sees a clear conflict between the evaculation plans and virtually all of the collective cargaining agreements currently in place in the school districts. Those agreements outline working hours and responsibilities not addressed in the evacuation plans.

Thirdly, Mr. Newman is of the cpinion that the evacuation plans assume an extension of the dc: trine of "In Loco , Parentis" that is untenable. This doctrine, which prctides that teachers operate in place of the parents or legal guardian of a child, extends only to discipline and control, anc aces not include out of school custody in an emergency cr crisis. That responsibility rests solely with the parents.

nar ,:"EC%"?'c: an.

.m -

.To Whom It May Concern S3ptembar 4, 1984 page 2 Finally, Mr. Newman makes the point that the evacuation plans do not take into account teachers' own family and personal ob:igations in the event of a nuclear emergency.

In addition, the National Education Association, our national affiliate, has adopted a resolution (A-25, 1982) re-garding Nuclear Accident Emergency Plans. That resolution states in pertinent part that:

teachers and other school personnel must be involved in the development of emergency plans in case of accidents involving nuclear reactors and/or radioactive materials. All teachers must receive copies of these plans as they would pertain to their schools.

A reading of the proposed plans does not indicate the inclusion of teachers in the development of the evacuation procedures.

NEA'a resolution also calls for training for all involved school personnel. Members of our bargaining unit at Owen J. Roberts School District have reported to us that the presentation which they were given by PECO after their school district had approved the evacuation plans was primarily an information session on the values of nuclear energy. As of this date, no teachers have received any actual training in the duties which would be re-quired of them under the evacuation plans.

The Resolutions Committee of the State Association has been alerted to the issue of teacher involvement in Nuclear Accident Emergency Plans and is considering the presenta-ion of a re-solution on this issue to its representative assembly.

If there are any further questions on this issue, please do not hesitate to contact us.

Sincerely,

. ~ .4 T;:

l

, j Y.-

/

  • J-

.y ;-

Donald F. Morabito Regional Field Director, SER dss cc: Chase Beatty i

REPORT OF THE RERP EXERCISE AT THE LIMERICK GENERATING STATION ON JULY 25. 1984 i

i 2

2 k

L Office of Training and Education Pennsylvania Emergency Management Agency August 10, 1984

. CONTENTS I. Introduction i II. Montgomery County 2 A. -County EOC 2

B. Risk Municipalities 2

1. Collegeville Borough 2
2. Douglas Township 2
3. Green Lane Borough /Marlborough Township 2

'4. Limerick Township 3

5. Lower Frederick Township 3
6. Lower Pottsgrove Township 3
7. Lower Providence Township 3
8. Lower Salford Township
  • 3
9. New Hanover Township 3
10. Perk 1 omen Township -

3

11. Pottstown Borough 3
12. Royersford Borough 4
13. Schwenksville Borough 4
14. Skippack Township 4
15. Trappe Borough 4
16. Upper Frederick Township 4
17. Upper Pottsgrove Township 4
18. Upper Providence Township 4
19. Upper Salford Township 4
20. West Pottsgrove Townr. hip ,

4 C. Decontamination Station 5 D. Risk Hospital 5 E. Risk School District , 5 F. Reception / Mass Care Center ,

5 l III. Chester County 6 A. County EOC i 6

i 2

a I

E e

P

._m____ _ _ _ _ _ ____.__.___--___ ------

o'

. B. Risk Municipalities 6

1. Charlestown Township 6
2. East Coventry Township 6
3. East Pikeland Township 6
4. East Nantmeal Township 6
5. East Vincent Township ^

6

6. North Coventry Township 7
7. Phoenixville Borough 7
8. Schuylkill Township 7
9. South Coventry Township 7
10. Spring City Borough 7
11. Upper Uwchlan Township 7
12. Uwchlan Township 7
13. Warwick Township 7
14. Kest Pikeland Township 7

'15. West Vincent Township 7 C. Decontamination Station 8 D. Eospitals 8 E. Reception Center 8 F. Mass Care Center 8 IV. Berks County 9 A. County EOC 9 B. Risk Municipalities 9

1. Amity Township 9
2. Boyertown Borough 9
3. Colebrookdale Township 9 4.. Douglass Township 9 .
5. Earl Township 9
6. Union Township 9
7. Washington Township 9 C. Decontamination Station 10 D. Risk School District 10 E. Reception Center 10 F. Macs Care Center 10 V. Lehigh County 11 A. County EOC 11

-iii-

1

. 1 B. D2centamination Stction 11 C. Mass Care Center. 11

' D. Recsption Center 11 E. H'st o School Pick-Up Point _

11 VI. Bucks County 12 VII. Conclusions and Recommr.ndations 13 A. Conclusions 13 B. Recommendations 13 1

1 f

l b

i I

-iv-4 we-wy -m.

I. INTRODUCTION An exercise involving the Limerick Generating Station and a number of governmental bodies was conducted on Wednesday, July 25, 1984. -The Limerick Generating Station, operated by. the Philadelphia Electric Company, is located in Limerick Township in Montgomery County.

Portions of the site extend to Lower Pottsgrove Township, Montgomery County, and East Coventry Township, Chester County.

The governmental bodies involved in this exercise included the Commonwealth of Pennsylvania, Berks County (risk / support), Chester County (risk / support), Montgomery County (risk / support), Lehigh County

- (support), and 37 risk municipalities in the 10-mile emergency planning zone (EPZ) surrounding the Limerick facility. Also involved were the regional office of the Federal Emergency Management Agency (FEMA) and the regional office of the Nuclear Regulatory. Commission (NRC).

The purpose of the exercise was to test the viability of the county and municipal' plans that have been developed to assist the various

,, governmental bodies to effectively respond to an accident that may occur t*'

at the Limerick Generating Station. Specifically, communications, noti-fication procedures, route alerting, the sounding of sirens, the activation of 'the Emergency Broadcast System (EBS), the distribution and effective utilization of dosimetry, the activation of reception and mass care centers, the manning of traffic control points (TCPs) and access control points (ACPs), and the general response of the emergency services were observed during ::his exercise to determine that the health and safety of the people residing in the 10-mile EPZwere effectively protected. .

The Pennsylvania Emergency Management Agency (PEMA) placed observers / instructors at each action location who then provided assistance to the county and -local personnel who were participating in the exercise.

Additionally, these observers / instructors assessed the procedures that were followed and the actions that were taken. These assessments are contained in this report.

i FEMA also had observers at 33 action locations. These federal observers evaluated the procedures and actions taken by the county and local participants. A report will be prepared by FEMA and submitted to the NRC and PEMA. The latter will, in turn, submit this report to the counties that participated in the exercise. This federal report is scheduled to be released on or before October 1,1984.

- 1-O y , , - - . - -.<--,.,-,nn,s -

~,--m, e , -- -,,.m . , - - --,,--,,e y.m,,- ..y- -m--- --m-----e-v- - - n --n--, e wyw-,4

. II. MONTGOMERY COUNTY

'A. County EOC The coordinator and his staff did an outstanding job in virtually all aspects of the exercise. The only minor. problem concerned control of dosimetry. .The capability is there but the radiological officer could use some additional training. 'In general, this staff performed-in an exceptional manner.

B. Risk Municipalities

1. Collegeville Borough: The EOC staff, including municipal elected officials, were well trained and well prepared for the exercise.

The EOC was manned with sufficient staff in a very timely' manner. The

. staff proceeded to set up the EOC in an organized and orderly fashion (i.e.,

designating each staff . members' working space, cor.necting phones and radios, manning security, posting maps and status boards and providing each staff member with appropriate documents). The staff ; demonstrated a good working knowledge of the municipal plan and of the goals of the operation. Messages were received, transmitted, recorded, and logged in a very professional manner. The fact that:the EOC staff.was not afraid to discuss various procedures of the plan.for' clarification was highly commendable. In checking with institutions within the jurisdiction for transportation requirements, it was learned that Ursinus College had a soccer camp in session and would require transportation for 250 students. Had there been an actual emergency, these students would have been provided with bus transportation. The bor'ough coordinator is a very effective leader -and has a good grasp of her duties and responsibilities.

2. Douglas Township: This township did not participate in the exercise.
3. Green Lane Borough /Marlborough Township: The facility and staf f were adequate but some probicos occurred dealing with communications.

The EOC staff was not familiar with. radio equipment available. Confusion also developed when the county EOC 'sent a message to begin route alerting land the local coordinator had already started the process. However, overall response was adequate. This 2-municipality EOC was located in Marlborough Township.

e

4. Limerick Township: The organization in Limerick Township seems capable of responding adequately to an emergency at the plant.

However, there were some problems evidenced during the exercice caused by the absence of the local coordinator. The police chief acted as coordinator and did a good job. He would show improvement with some additional training. The staff had to operate short handed but was able to . perform their tasks satisfactorily. General enthusiasm and dedication overcame many shortfalls. Not all events were reported to the municipality by the county EOC.

5. Lower Frederick Township: The local emergency management organization was able to adequately respond to a simulated emergency at the Limerick plant. There were no serious deficiencies identified by the PEMA observer during the exercise.
6. Lower Pottsgrove Township: The EOC personnel did an excellent job. Staff training was adequate as was EOC and communications capability. Only deficiencies involved the outgoing message log and updating of status board. Of special note: when the exercise was terminated.

-EOC staf f critiqued their performance and proposed remedies to deal with the deficiencies.

7. Lower Providence Township: This township did not participate in the exercise. ,
8. Lower Salford Township: The emergency management coordinator and his staff appeared to be capable of performing their required functions and successfully conducting an evacuation if necessary.

This exercise and other training sessions in the future will certainly help to fine-tune the EOC staffs' familiarity with the township plans.

9. New Hanover Township: The EOC staff demonstrated that they would be able to perform the required tasks should an actual emergency occur. The operation could be improved in the following areas: more ef fective use of township building space, designation of persons to serve as messengers / telephone operations, provisions ,

for'two-meter radio antenna hookup inside township building, use of status boards / visual displays, desk space for all EOC staff persons.

If these improvements are made, the overall operation will be more effective.

10. Perkiomen Township: The emergency management coordinator and staff were familiar with the township plan. They followed the procedures laid out in the plan throughout the exercise. All aspects of the EOC appeared to be adequate.
11. Pottstown Borough: The emergency management coordinator and staff are to be commended for their efficient and professional manner. During the siren sounding, it was learned that the sirens are barely audible even when standing outside. Though the E0C did have a security person posted, a sign-in/ sign-out sheet wasn't maintained.

Without reservation, this municipality is well prepared to respond to an actual plant energency.


g- .-,n, . . - ~ ~ . - . - , - - - - . . - . . - ~ - - - - . ~ -- .---..n-..- - - - - - , ~ - - - - - - - - - - -

12. Roy2rsferd Borough: Th2 local coordinrter cnd his secff appeared knowledgeable and well trained. The staff was also able to respond to a structure fire in the middle of the exercise without detracting from their EOC response capability. There was initial confusion on

" General Emergency" and " Disaster Emergency" but that was clarified by the county.

13. Schwenksville Borough: The coordinator and his staff acted in a professional manner and demonstrated a good knowledge of the plan. The municipality demonstrated its ability to function adequately in an emergency in an acceptable mannar. However, the current location of the EOC, in the municipal water treatement facility laboratory, is viewed as a major problem and consideration should be given to relocation to a more appropriate site.
14. Skippack Township: While communications were adequate, most EOC functions were not adequately demonstrated because of lack of personnel. Most of the operations were carried out by the local coordinator. Elected officials were not present during the exercise.

There is serious concern that Skippack Township could not adequately respond in the event of an accident at Limerick.

15. Trappe Borough: The local coordinator was able to demonstrate that the borough could adequately respond according to their plan but some deficiencies were identified. The capability for 24-hour operation appears to be inadequate and the ability of the staff and their emergency workers to use dosimetry was not clearly demonstrated.
16. Upper Frederick Tcwnship: The staff performed in an adequate manner during the exercise. The basic skills exist at this level but additional training should be given to " iron-out" the rough spots. The communications capability is adequate and so is the EOC.

In general, the municipality operated a solid "no frills" operation.

17. Upper Pottsgrove Township: The municipal EMC and his staff demonstrated a working knowledge of the procedures laid out in the plans throughout the exercise. No significant problems were noted*
18. Upper Providence Township: There were no significant discrepancies observed. The staff worked well together and were well

. organized throughout the exercise. The addition of an EOC major events status board will improve the operation in future exercise.

19. Upper Salford Township: The EMC and staf f perf ormed quite well throughout the exercise. They demonstrated familiarity with the municipal plan and its procedures. No significant problems were noted.
20. West Pottsgrove Township: This township did not participate in the exercise.

5

C. Decontamination Station

1. Pennsburg This station was not opened as of 7:00 p.m.
2. Hatboro, Upper Moreland School: This station was not opened as,of 4:30 p.m.

D. Risk Hospitals Pottstown Memorial Medical Center: This hospital is well prepared to undertake required functions in the event of an accident at the nuclear power plant.

E. Risk School District Pottstown: Though there is a plan on file, it is considered to be grossly inadequate. Neither school employees nor parents are knowledgeable as to the procedures of the plan. The superintendent received only one call, which was the " Alert" notification. No further updating on the status of the problem was provided.

F. Reception / Mass Care Center Willow Grove: This center was not opened as of 6:00 p.m.

II. CHE' STER COUNTY A. County EOC The county coordinator and his staff adequately demonstrated their capability _ to manage an emergency of the magnitude simulated during the exercise. Communications capabilities were well-situated and the EOC was well-organized. - The coordinator ran the operations section, which did not allow him to act as efficiently as he might have. The news media was allowed in the EOC for extended periods of time and this created undue distractions.

B. Risk Municipalities

1. Charlestown Township: The local coordinator and township staff are knowledgeable, well-trained and works well as a unit. The one deficiency which should be addressed is route alerting, which must be done by_-the fire department in the neighboring community. Coordination with the county should be improved and route alerting sectors should be more clearly defined.

2.. East Coventry Township: This township displayed a level of knowledge and confidence that will insure public safety during an emergency at the nuclear power plant. The operation went very smoothly and was well supported 1 by township elected officials. There was some confusion on the use of KI and dosimetry, but future training should ,

eliminate this.

3. East Pikeland Township: The entire operation-was well-run,- the staff was well-trained, the EOC was more than adequate. All-in-all, the municipality is capable of responding to a plant emergency satisfactorily.
4. East Nantmeal Township: The local coordinator and his

- staff did an excellent job. They followed the plan and impicmented all the appropriate procedures with all the necessary resources. The only problem the municipality had was getting information from the county in a timely fashion. -

5. East Vincent Township: In general, the EOC staff were knowledgeable in the plan and how to implement it. It is recommended that.a person other than the EMC serve -as message recorder. Also revealed during this exercise is the need to conduct more training for EOC personnel and emergency workers on the use'of dosimetry and dosimetry report forms.

Conducting more table-top exercises in the future will help smooth out rough spots in the operation.

6. North Coventry Township: The staff was knowledgeable and experienced and demonstrated their ability to respond to a plant accident adequately. -
7. Phoenixville Borough: In spite of minor delays and difficulties, the organization seemed well-trained and performed its mission very well.

Some additional training is needed to clarify toute alerting operations but overall performance was good. There were indications that information flowing from county to municipality could be improved.

8. Schuylkill Township: While the township may be able to respond in the event of an emergency, it was net adequately demonstrated during the exercise. The EMC handled most of the activities himself, so many of the functions of the staf f were not demonstrated. The distribution and use of dosimetry during the exercise was also not demonstrated.
9. South Coventry Township: This township did not participate

'in the exercise.

10. Spring City Borough: The coordinator and staf f responded adequately in all phases of the exercise. There appears to be ne verious deficiencies that would prevent the borough from responding adsquan-ly in the event of an accident at the plant. The most impressive thing about the operation was the presence of 18 staff people in the EOC working in a well-coordinated manner to accomplish their. tasks.
11. Upper Uwchlan Township: In general, the municipality performed in an outstanding manner for a first-time exercise participant.

There were some problems, however. The staff had difficulty with paper-work, particularly keeping the message log up to date and there was some confusion concerning some of the messages sent by the county. All-in-all, the staf f did well.

12. Uwchlan Township: The' coordinator and his staff were able to demonstrate an ability to adequately respond to a plant emergency.
13. Warwick Township: While it was commendable that this township attempted to participate in the exercise, it was evident that they did so without adequate preparation. The EMC chose not to participate at the last minute. This placed the township supervisors in a position of improvising from the outset. The efforts of the EOC staff were severely hampered due to lack of timely information/ reports from the county EOC.
14. West Pikeland Township: Staf f members were kept apprised of major events. Internal and external communications systems worked adequately. Though actual dosimetry was not issued as part of this exercise, several staff persons / emergency workers indicated that they would feel more comfortable with the instrumentation if they had additional
training.
15. West Vincent Township: The EMC and his staff demonstrated that they possess a good grasp of their duties and responsibilities.

They followed the municipal plan and carried out their assigned tasks in exemplary fashion. No glaring errors were evident.

I l

. i C. Decontamination Station *

1. Elverson Fire Company: While there were sufficient numbers of people on hand to man this station, there is a definite need to provide l these persons with additional training in the procedures to be followed.

A new fac,ility should be considered for use as a decontamination station i

as the current facility does not possess showets to accomplish the decon-tamination process.

)

2. Kennett Hig!. School: This station was not opened as of 5:30 p.m. (July 25, 1984) and therefore was not observed. Its capabilities are unknown.

D. Hospitals

1. Phoenixville Hospital (risk): This hospital is well prepared to undertake required emergency operations in the event of an accident at the Limerick facility. However, it should be pointed out that dosimetry was not received by the hospital from the county during the course of this exercise. This aspect of the operation remains untested. Additionally, no RACES operator reported to the hospital to provide communications redundancy.
2. Paoli Hospital (host): Though the planning and preparedness measures taken by this hospital appear to be adequate, the actual implementation i of the plan was not observed. For this reason, it is difficult to assess this hospital's degree of readiness.
3. Chester County Hospital (hospital providing treatment to the contaminated injured): This hospital is well prepared to treat contaninated injured if that should become necessary during a plant emergency.

E. Reception Center Exton Square Mall: This facility was not activated as of 7:15 p.m. and therefore was not observed. Its readiness is unknown.

F. Mass Care Center

'Kennett High School: This facility was not activated as of 5:30 p.m. and was therefore not observed. Its adequacy is unknown.

W

J

. IV. BERKS COUNTY A. County EOC The emergency management coordinator and his staff discharged their required tasks in an exemplary fashion. All key participants demonstrated extensive knowledge of plans and procedures. This facility and staff appears to be fully capable of. responding effectively in the event of an actual plant emergency.

B. Risk Municipalities

1. Amity Township: This township did not participate in the exercise.
2. Boyertown Borough: The local coordinator and his staff did a satisfactory job in implementing the municipal plan and seem capable of handling an actual emergency. The EOC is an excellent facility. It would appear that some adjustments shoald be cade in message flow procedures to improve operational efficiency.
3. Colebrookdale Township: The local staff demonstrated its ability to respond to a plant emergency in an effective manner.

The EMC concedes there is room for improvement and plans to make organizational and resource additions to upgrade the capabilities of his organization.

-4. Douglass Township: While there is room for improvement,'

the municipal staff performed in an adequate fashion. Three of the township's six route alerting zones are controlled by Boyertown Borough and is the source of potential proble=s and should be rectified if possible.

5. Earl Townsnip: The township staff needs additional training

~

but does appear capable of handling an emergency. Difficulties stemmed from the relative inexperience of the staff. The coordinator and his staf f had only been in the job three weeks when the exercise was held.

However, the EOC is adequate and i*.s basis for an excellent staf f has

' been put together.

6. Union Township: This township did not participate in the exercise.
7. Washington Township: Although the coordinator and his staff performed in an enthusiastic and dedicated manner, it is apparent that additional training vill be needed so that the organization can perform satisfactorily in an emergency. Co=munications were adequate and so was security. However, the coordinator was doing too much himself

. _g_

e, w + w-V y yy n 3 -, 4 -y p,. , , -- y-- -

3

inntcad of cpinding time coordinating th2 entira operation. Thnra was ,

also some confusion concerning route alerting and evacuation but additional training should remedy these deficiencies.

C. Decon'tamination Station -

1. Fleetwood High School: The decontamination facility is very adequate. The persons manning the facility were, for the most part, well trained in the use of the decontamination instruments. There is a need for more training to ensure that the reporting procedures will be followed correctly in the future.
2. Oley Valley High School: This facility is adequate to be used as a decontamination station. Some attention needs to be given to the traffic flow patterns within the station. Additional training would improve the decontamination workers understanding of the report forms and reporting requirements. The co==unications capability demon-strated was excellent.

D. Risk School District The current school district plan at 3oyercovn does not adequately address potential traffic problems at the school being evacuated or at the host school after evacuation. Teachers, staffs and parents have not yet been infcrmed of the plan because it has not yet been approved. Though the school was not actually in session during this exercise, the school superintendent did not receive notification for " site emergency" or

" general emergency." He was not kept apprised of the developing situation.

No RACES radio operator was dispatched to the school district.

E. Reception Center Oley Valley High School: This facility was not activated and therefore not observed.

F. Mass Care Center Fleetwood High School: This facility is more than adequate to be used as a mass care center. Though many functions were siculated, it is believed that the mass care center staff would be capable of an effective response in an actual emergency.

i ,

-.---.w-- -w , , - . . ----v- - .-y < w

- --e

V. LEHIGH COUNTY A. County EOC The county coordinator and his staff were very knowledgeable

-of their responsibilities. The only significant problem which occurred during the exercise was that the county did not receive the message that an evacuation'was underway.

B. Decontamination Station The persons who manned this station at the Emaus High School in Emmaus appeared.to be well informed of the required procedures and how to carry them out.

C. Mass Care Center.

~

This facility at the Emmaus High School in En=aus was observed to be well equipped and staffed with staff persons knowledgeable of ,

their. required duties.

D. Reception Center

.The reception center at Emmaus High School in Emmaus had a crew that was well prepared to perform their required assignments.

E. Host School Pick-Up Point This facility at Emmaus High Schoal in Emmaus was not activated during the exercise. It is therefore not known whether the persons assigned are' capable of performing their assigned tasks.

11-e-- se v*-y wme s< +-qw - y. +-5m -

-g e,--g,p , w -y.v--g e.---=-,p--r-, pw,,, y+-.-- .- # #.,-w.-- - - - , ,c---e--  % y.-w.- e. - -- , , ..--,

i VI. BUCKS COUNTY A. County EOC This support county did not participate in the exercise.

+

e

VII. . CONCLUSIONS AND RECOMME:;DATIONS A. Conclusions

1. In general, most governmental organizations demonstrated their capability to protect the lives of their citizens in the event of an accident at the Limerick Generating Station.
2. -The effective operation of EOCs needs to be maintained and improved.
3. Communications between the county and local EOCs need to be improved.
4. The operational readiness of school districts needs to be demonstrated.
5. Proper and effective decontamination procedures need to be demonstrated.
6. Reception and mass care centers need to be activated and evaluated.
7. The effective use of dosimetry needs to be demonstrated.

B. Recommendations

1. Counties should continue to conduct training in the effective operation of EOCs.
2. Communications drills should be conducted on a regular basis betw'een the county and local EOCs.
3. The proper activities to be conducted at each accident classification level need to be thoroughly reviewed and emphasized.

~

4. Training of effective decontamination procedures should continue to
be conducted.

l l 5. Intensive training should be conducted on an on-going basis regarding the effective use of dosimetry.

6. Training at reaeption and mass care centers should continue to be l conducted.
7. Training at schools of appropriate actions to take in the event of l

an accident at Limerick should continue.

l l .

LEA-13 There must be specific and adequate plans for children in day care, nursery and pre-school programs and in day and overnight camps in order to provide reasonable assurance that this parttcularly sensitive segment of the population is adequately protected.

Specifically,

1. Procedures for contacting parents or guardians must be adequate to enable the' children to be picked up in a timely fashion and with reasonable certainty, in the event that these facilities are going to be closed at Sice and-General Emergency Stages of an alert.
2. The general transportation survey sent out to the public is not sufficient to determine the needs of pre-school, day care / nursery school and summer camps.
3. Present Municipal and County RERP's fail to adequately identify day
  • care, nursery and pre-sch'ool centers, and summer camps.
4. Pre-assignment of transportation resources to these potentially difficult and sensitive members of the population should be arranged and coordinated by the municipality within which the facilityis located.
5. Any decision to shelter must be a last resort, because l

of the extremely volatile nature of this special population, as well as their parents.

6. The participation and coanitment  : of the staff to implement planning is essential to its workablity, since very young children need to feel a sense of continuity and trust in their caretakers.

BASIS: 10 CFR 50.47 (2), and (2)(b)(1), (2) (b) (5) , (2)(b)(15),

NUREG 0654, Appendix 4, page 4-3, Criteria C, Special Facility Populations.

- - , - , - .- , . - - , - - - v _ - - . --w , - , -

LEA-14 (a) The School District RERP's and the Chester, Berks, and Montgomery County RERP's are deficient because there are inadequate provisions for Units of dosimetry-KI for school bus drivers, teachers, or school staff who may be required to remain in the EPZ for prolonged periods of time or who may be required to make multiple trips into the EPZ in the. event of a radiological emergency due to shortagas of equipment and personnel.

Specifically,

1. School District and County RERP's are deficient because plans for distribution of Units of dosimetry-KI for bus drivers are ir> a d e q u a t e . There are no provisions to provide units of dosimetry-KI to buses that do not go to a trans-portation stag'ing area. Plans must clearly state where bus drivers are to obtain dosimetry.
2. The number of Units of dosimetry-KI available at county transportation staging areas is inadequate.

Chester County REfP, Draft 8 (6/84) states:

200 Units of dosimetry-KI are planned for distribution at transportation staging areas for use.by incoming emergency vehicles. The transportation staging area vill be used for the positioning and assignment of transpor-tation resources,and buses that may be called 6n in the event of an evacuation to provide transportation for persons requiring medical evacuation, school children, and those without automobile transportation.

(Annex I - Transportation, page I-1, Annex M, Appendix 3, page M-3-3, item #18)

Montgomery County RERP, Draft'6 (4/84) states; Total number of Units of dosimetry-KI for Montg. Co.

transportation. staging areas is 150, for incoming emergency vehicles (Appendix M-3, page M-3-9, item #29)

Berks County RERP, Draft 5 11/83 states:

Number of Units of dosimetry-KI for Berks County transportation staging areas in "to be developed" (Appendix M-4, page M-4-2, item fl0)

1 3.

Sufficient Units of dosimetry-KI must be distributed to each school district for use by school staff.

4.

School' staff must be trained in the use of dosimetry in the event that sheltering is recommended as a protective measure.

BASIS: NUREG 0654, Criteria K.3.a.,

10 CFR 5 50.47 (b) (11) & (b) (15)

- (b)

The Chester, Berks, and Montgomery County School District RERP's fail to~ provide rea'sonable assurance that school bus-driverr., teachers or other school staff are properly trained F

for radiological emergencies.

Specifically, School-staff 1.

and bus driver training should include the following:

procedures for dealing with contaminated individuals and equipment.

2.

risks of exposure equipment: to radiation and proper use of any necessary

~

a) school staff should receive instrnetion in the proper use of dosimetry b) school staff must be instructed in the adequacy of school district. buildings for sheltering purposes ..

c) school staff have not been instructed in dealing with children under " stress conditions". 7 d) school staff must clearly enderstand their roles and responsibilities to assist in implementation ,

of school district RERP's, and must be surveyed to identify those willing tomake such a commitment in the event of a radiological emergency at Limerick "

3. bus drivers need to.be_ familiar with the routes to which they are assigned.

)-

,7 h.

BASIS: 0.1, 10 CFR g 50.47 (b ) ( 15 ) , (b) (1) , (a)(1),NUREG 0654 Criteria Criteria C.4, ;7 and Criterie A.1.b, A.2.a, A.3. '

g li?

Eid

,iE a]

LEA-15 The Chester and Montgomery County RERP's and the School District RERP's are not capable of being implemented because the

-provisions made to provide bus drivers who are committed to being available during a radiological emergency, or even during preliminary stages of alert are inadequate.

Specifically,

1. There is no assurance that bus companies are able to promptly communicate with and dispatch bus drivers in the event of a radiological emergency, particularly if notification is neces-l ~

sary while a driver is enronte.

2. There are no letters of agreement to indicate that bus companies are able to provide even a minimum number of bus drivers in the event of a radiological emergency.
3. There is no indication of the terms of employment contracts between bus companies and drivers and there is no assruance of pre-identification of bus driver. volunteers assigned to carry out an evacuation in the event of a radiological emergency.

LEA has been informed by Mr. Don Morabito, Regional Field Director for the Pennsylvania State Education Association that some of the-school district bus drivers have union contracts that would be subject to the same scrutiny as unionized school teachers contracts. Any change in employment conditions would be subject to collective bargaining negotiations with the school district. (See letter-from Mr. Morabito included in this filing from PSEA, dated 9/4/84. Applicability to bus driver contracts was discussed between Mr. Morabito and Jim Murtha on 9/5/84.)

4. Tnere is no assurance that bus drivers will be familiar with j the routes to which they are assigned d,uring a radiological emer- -

gency. There is no indication of the amount of mobilization time necessary before buses will arrive at their assigned risk school district destination.

5. There is no assurance that bus drivers are aware of their role in providing transportation from Host Schools to Mass Care Centers.
6. There is no basis to assume that bus drivers will carry out i their responsibilities to assist with an evacuation of the EPZ while there-is uncertainty about the whereabouts and well-being of members cf their own families. Human response

.,-m_. - - , - . - . - . ,-,, _ _ _. ..-_.---~ - . . . _ . - _ _ _ _ _ - - . , _ _ _ _ .-_ ,,____

factors will 5ffdct the reliability of bus driver availability.

Bus driver training is essential to developing confidence in the workability of both the school district emergency response plan that the bus driver participates in, and other planning measures.that will involve members of families of' bus drivers.

7.

Bus driver assignments to schools for evacuation cannot be simultaneously used for. evacuation of the general public in need of transportation assistance. Evaluation of bus driver availability must be done in the context of other bus driver needs. Clarification of the possibilities of multiple trip scenarios-needseto.be included in training programs and in the actual plans themselves.

8.

Transportation for private school students under the juris-diction of public school districts must be assured in the plans.

Responsibilities for these schools must be clearly stated in their respectiv'e facility RERP's.

BASIS:NUREG 10 CFR0654, 50.47Criteria (a) (1)A.3,

, (2) , (b) (1) , (b)(6),(b)(11), and (b)(15),

A.4, C.4; School District RERP's, Basic Plan, Logistics of Evacuation II.G.3 (a through f)

~

8 h

b e

=*4

LEA-22 The State, County, and Municipal RERP's are inadequate because farmers who may be designated as emergency workers in order

'to tend to livestock in the event of a radiological emergency have_not been provided adequate training and dosimetry.

Specifically, 1.JThe County RERP's fail to provide the actual number of farmers in the EPZ who may require dosimetry, including provisions for multiple re-entries and replenishment of supplies to the County Agent.to insure enough units are available to cover farmers over a period of several days.

Note: The County RERP's presently contain provisions for the following:

Chester County: 200_ Units dosimetry /KI (Appendix 3, AnnexM, (Draft #8) page M-3-1,. item #2)

Montgomery County: 180 Units dosimetry /KI for farmers who (Draft #6) keep, livestock, 45 Units for animal husbandry workers, and 11. Units for reserve. (Appendix M-3, page M-3-1; item #2)

Berks County: number'of units of dosimetry /KI marked "to (Draft #5) be determined" (Appendix M-4, page M-4-1, item #2) 2.-The County RERP's must clearly define " livestock" to include fowl, ho'rses, cows, and sheep. The term " farmer" should-include people owning or operating farms, not limited to USDA lists.

i 3. An informational brochure should be regularly mailed to

'each farmer with livestock explaining their status (_as an emergency worker if necessary to tend animals), their rights, re-entry information and conditions, location and distribution of dosimetry, and information relating to the effects of radiation exposure to humans and animals, 14.-Training must'be offered regularly and should cover the same

_ points listed above in (3).

i BASIS: NUREG-0654, Criteria H.7: 10 CFR g 50.47 (b) (6), (b)(7), (b)(11), &(b)(1 NUREG 0654, Criteria G.1; NUREG 0654, Criteria J.9, J.10.a, NUREG 0654, Criteria J.10.e, NUREG 0654 Criteria J.11

essential organizations and staff must not delay siren activation.

3. The Municipal RERP's fail to indicate the number of volunteer fire compant personnel that would or could be available at the time of a-radiological emergency. Specifically, there is no basis to assume that volunteer firemen would leave their regular employment and families during an evacuation in order to assist in conducting route alerting.
4. The mobilization and adequacy of rout 3 alerting teams is a critical factor contributing to the. reasonable assurance that 3

public notification and therefore evacuation or other protective measures can be implemented. The mobilization of fire depart-ments is as much an issue .of availability of volunteers, especially in the daytime, as it is an issue of communications promptness.

BASIS: 10 CFR g50.47 (b) (5) , NUREG 0654 Appendix 3, Criteria for Acceptance , 2.a and 2.c., NUREG 0654 Criteria E.6.

., , . , , -.a

- , . . . , . - .m..n .- ,- , .g, , - - , - , - - , , . , . . , , _ . . , , , , . . . _ , - - . , -,

LEA-24/F0E-1 1

l i

9/4/84 Additional information received from Bob Anthony -

i

1. HMM - " Evacuation Time Estimate Study for the Limerick Plume Exposure Zone", final draft May 1981.

In this study " Analysis Area 11" includes Montgomery County towmships in the EPZ. This area does not include Valley Forge Park or King of Prussia, thereby excluding the county's major tourist, business, shopping, and transportation concentrations.

The NE corner of Upper Merion Township is within 10 miles of Limerick (or at most is only 800 yards beyond). Upper Merion must be included in the EPZ and emergency planning.

John Waters, Upper Merion fire chief and emergency planning supervisor, has participated in state emergency planning meetings '

on Limerick. He says -that no consideration has been given to evacuation plans for Upper Merion but':he knows that the residents will evacuate. Possibilities for Upper Merion evacuation will be handicapped by supplemental bures and ambulances coming into the township at King of Prussia Mall, which is a transportation and central resource staging area.

2. Intense present traffic congestion occaisioned Upper Merion Twp.

to commission a traffic study to evaluate the present and future.

The " Interim Report" was issued 7/6/84 The " Final Report" is scheduled for November 1984

" Upper Merion Township: Township-Wide Traffic Study" Phase 1 -

Township Overview, Interim Report Prepared by Simpson & Curtin Division of Booz-Allen & Hamilton, Inc.

page 4: "On some collector roads traffic more than doubled in the last 10 years. Accident rates are up 20% since 1981. All three thoroughways are experiencing greater than capacity volumes on segments through the township."

There are 5 roads that serve the township as arterials or collectors.

The average daily traffic on the heaviest travelled is:

North Gulph Road 26,200 South Gulph Road 20,500 West Valley Forge Road 17,800 South Henderson Road 16,200 First Avenue 14,600 Conrad. Drive 14,300

3. From PennDot and Turnpike Records, traffic figures shown previously on map submitted by Bob Anthony are as follows; Annual daily traffic:

Pa. Turnpike 120,000 Route 202 67,400 Rt. 76 Expressway 71,000 Route 363 30,800

- 4.- For the future,.added traffic congestion is predicted in "Today's Post" 1/11/84 article " Traffic Onslaught" (attached)

5. " Industrial Impacts':of Hypothetical Accidents at the Limerick Nuclear Reactor", Regional Economic Analysis Division, Bureau of Economic Analysis, U.S. Dept. of Commerce, Washington, D.C. 20230, March 1983 stated:

"...the accompanying tables show that the potential employment losses in industries directly effected by the accident could be as high as'1.2 million jobs for one year."

"... decrease in tourist activity 76,000 jobs" 4

E*

i e

m -,

m. _

y a {0$

w h= h h Y - ~

c-- . re, . . tatn,e - a w..::.%.

3 g y..Yg., . m. .%,. w-

-~

x

.,, . m~wG 4e ~ w-

%""" ^ N'.

l mn EESPF"-p - ~(.f

, ,- M@$ hM fag &a, GEMb, ?Eh,'i&' # '

k;q r t J - -

. '$$fd l M ]g M.. g c. .'". ..a..A. . ~v . m .j.p . u m z,g_ mw w- .-+- .

q%.[.h [g

~ ~ .

W@jA.Es3m Jgg ggrggi . ev.neao a ggS, j k. ',& m- * "WhY

' .., ,,; '"9 9 5 , W A W ?=m ' ~~^

bE

[f n*=

f 535 3

.g

    1. 7.3.

m .,

, . ..y .s.,.

- Mdi-%,

,s.w .

w.. ,e.n:. y u-,....

d.m.,,

e.- c= y~.v= 6 0 lii@$MViME af.-.a=:ieMsd )J.

w n

k1* m. m,.._z .-.m...-.

/,

/ h s1TE

! OF PROPCSED W "M .- ,;;,,r;i.,, . **

~~ '*

".i , = .. . 2 N}^ $r:. .. i..!PRUD1NTIAL . py. . -

3 * '

I d _ . - .===. _,?- ,p d'b' * .M,*Jh _'

~

5 RJ . W '* CFElCd CCNIb'b

  • f-2,.~-9 N *. 1m:n;*R - 9 t " ~.s.W% g~ %u c 3; .9@W. .:,.y&*f M ?s M -,- B%

p%

r

. _ t. ,

. h, .g wn,s m -. r-,

d .

,C ,

. ,dhir4 es-u : ,w.,,,,

Nf a.a p a. .,;,p.p'*.3AshounsJdGinldr ~y*"g g,etw .: n* a.u -

a.-

y ., , . * ~

4\j

  • w p - a- =

~

tv- -

'~;,';~.?* L Y hk ." -. -....:.-

m - m g a men m4. .r._ m

.C a

.  : .cs =7*=a'&' '~%- QM_*5 -

(

!;,,::.,,, s-q.";.RZ V ~ --

s a

p k a w =_s w_.~..- _._P_.-__

w g[e mw g?

i Traffic onslaught: -

Mk~~. New Prudential, Sheraton plans expected to clog area highways sy snassans

.. - em,,,e pia e idsenmas.swdacinia . M *aA 6'a a 3 Amomer(500 cars a day may sees he ma m tnps f.r S ersian expansase, wasch ta scheduaed to ytt ab-ttr - - ,,, f ff "58

  • tput there hs been se femalMN W d,, ",,",",*j . M..e o*u Y,jg Yp ve mag e. me d,s.mg h d fo, trst A ion ad pper snea # thia area at the tame," sad PennDOT

.- A Tew up -a .rt iaueit , eve = 1 N N"* @ "

V tt Prudsaust insuramee Ca. of Ametes an-a, Perm.ata,ha,ve on e me db.een _for,,a,o.50.90 t iut. ,,THteenm ,re.- = a- r' sa

,,ad ,, ,,e e,d,It,stfac, counta e.n N. Cu,;p.

f 5, named p*a la55 ="* " *"dd a " ""*

cm adh, but met for me botet. accordmg area.according a me amiecunt a Townshi venacles because of new offices openarg a me ,

, e the Pn e,a,um re.,

6=

=e om.i= - *a

AfDencas Bgttst Can'er.

==d= m, m go,.,ma nage,ri.n ad wagenmarat

. eweed by m. o, . ay. .e neu -n= C- t Ay,g,,,, yp, ,,,

a, 7,3,.

u. .T ,,,o,,m,,,a,.,,m,,e,o,4,,,,esave ngol 31sta iria co g, g g eas estabitsBang a reg enal Hev'M durmg Um evenug rust hsErs. a a effaces emp.

a rir fm wg g 1;ime sara va;w,,y r,ns_e um prep =ny.

e

]a a,,,e g, g

m

, g fagnea w 8

$"mond y in.Im somery County

-E. Prudenus presect. wadun== =* annum of si me arpaasia= = th* a**

g, Panam C====

Aceerd;rtg la a presentauce stade by Upper "They are pianfimg o subdi,we* but far cpp, meno. ofncia:a m prus.ns me 32m unma. nw trame'aa's couw be lumn na *==to Upu won te s " ac-y g",",, ," "',,7uj%"g M *o*r'ds". $i%."$' a"g8ev'ig sfha.

for h2ghway imprevetBents A prepad **> ba= 8ub="*d " the Penn-that bedy reviews Pnanaattel's stans.

  • Please hire ta page 3 2 2 s ,s,,e,s,v. s w.m n. s9ss Today's Post w

\'

i, Prudential, Sheraton plans C._ ,_ .. t Becuse Devian has mist seen ary g p*epesa!. as em4d met edw as epi- "It can be eene, but how far eff+ don't have the same leverage

  • All Baptist Churches pas asprewed a sien as as what traffsc impact imm satt a fermand twotofor what eatent =sast that,"Devtse Wierela het they have te de a tempty ent.h the leag term lease that requires 1r4 pttect we d r.an en N. Gulpa tooes." Vs6pe sa d.

Board of Supervisors Chattman Prudential to prepay $3.3 mausen for host . Upoer Stenen Concerned CI:!rens une first 50 years. The company has n.3Dh hipe. who aise has act seen Committee Presideni Orvshe 312-mcata opues en thelaat tr.eWhen a ww townsit:p. L*.eprefect developereemn eften before is the Prudential preposat, said since Encers said at was a " shame" that Conthtaons ei the lease auculate asaett ta cettriule te roadwerII, but the property a& ready has the proper the l'rudenual proposal wouid tame that tenants would not he permitted thatis a grey area.Devisa saat sentag for adjacent the project, onlyistim- away the beautalv4?y tandscaped to engage es busteess acuvsues out.

prevestets te Cat Cae "H;storical:y, when a land be mandated open space Surreunding the exisung Bade the leur bus.8 diets er use the Bapust Conventien ce.itar.

eevelopment is proposed, the gover- -v su are hated in what you esa premises for gambilag er the saJe ef

" Irs another esample of weet is sceacce er houer.

nst3 Dody can asa for so. sale Lin* do. Unless it la vehmtary.

prevementa The guestaar *f off este imprevements would have to be ad-the vaad going es an the teenshipAsthat as going affarfestive actmea plan te en-tecpttvemama as less altt " Dev4a la straag?e the township." Eaders courage meersty busaaess enterm ust jacent to the preperty,"

"The eely theg you can Yelpe requiresaidgreauf sasid. "!rs certamly gemg to add prises asincorporated mee thelease to the traffat preonem "

them to de is adjacent to the proper- suthesent parksag and unloadsag ty." Peter Ruggiere, generaa manager facdlues and ape *epriate landsesp.

af Prudent;al's real estate oggra- mg are mise rauared No bus!atag Less than a mile away is the tiens who made '.he anriour. cement can be higher than s0 feet and all Va: ley Ferge Gott Course. tAe sut> about the project, was unavadable uuhtyimes rsust be underground.

ject et pendmg Istrgauce about its to comment es we project's traffee Yeacent G. Khrg of Phadadesprua.

Sentag and poss40le gevein$ ment 6trtpact Sefore being turned dews tweet by who designed the Church head.

The Prudentf 31 developmeat is be-qtaarters, has been sesected as ar.

thesupervisors.

Corp. proposed estensave AceraDevelopment readwere Ing beHed as a hrst-skass eff.ce para thsteet of the comptes Lets commaneng high rems and appeak- Designers. Essmeers and Construe.

ee ff. Gulpa and surrounding roads toe la high. tech ausmesses to handle a proposed office and hotet lors, lac. has been samed general Cafnples en the gotf course. The General Board of American centractor.

Acert in trymg to char.ge the golf cour=e's asnculture er, fung to per.

mit the devesegment. Isut the Bapust Cester alreasy has the preper son.

ing for the Prudenual project "Once Dry have the somag, you

Environmental Assessment, Draft General Management Plan, June 1980

' Valley Forge National Historical Park park, carries a heavy volume of truck traffic and connects with PA 23 to the north and US 202 to the south. PA 363 serves as an extension of PA 23 and as a park access road from the east.

Traffic counts taken at the Valley Creek Bridge indicate a volume

exceeding 14,000 vehicles daily. The distribution of east-west traffic through the park is as follows: 9,000 vehicles on PA 23, -

4,000 on Gulph Road, and 1,200 on PA 252. Peak hour volumes on ':

23 are at 7:00-8:00 a.m. and 4:00-5:00 p.m. with approximately -

1,000 vehicles per hour in both directions. j At present PA 23 -and PA 252 are important to both external and through-traffic movement and to park visitation. The commuter or 4 commercial vehicle traveling east or west on PA 23 has no rzasonable alternative but to pass through the park. Thus, the visitor. frequently finds vehicles crowding behind him, encouraging him to proceed faster, and lessening his opportunity to enjoy the park. The park visitor should observe Valley Forge at a slow,

, unheeded pace. In contrast, commercial and commuter vehicles view -

the park as the shortest ro.?te to their destinations and are in turn frustrated by the slow-moving park visitor. Generally, the park .

visitor tends to drive at the speed limit or less, but the pressure  :

of the commuter traffic sometimes forces traffic flow to exceed

-posted speed limits. - All travelers must remain alert to avoid pntential accidents.  :

1 One may enter Valley Forge National Historical Park at Washington's '

headquarters at the western end, at the visitor center at the eastern. end, 'or indirectly from the south on PA 252, Yellow Springs ~ Road, or Gulph Road. The park is crisscrossed by a .-

network of roads that ultimately connect to major transportation  :

arteries. The variety of park entrances and the abundance of internally penetrating roads make it relatively easy for external L affic to cut through the park from any direction, using minor i reads as shortcuts to the arteries. .

t The intersection of PA 23 and PA 252 at the western entrance to .

L ' the park creates considerable conflict between commuter traffic east L and west on PA 23 and heavy truck traffic traveling north and south on PA 252. To compound this problem, the intersection lies at the bottom of a steep grade and is also a visitor entrance /

' intersection in traveling to Washington's headquarters, a heavily i visited attraction in the park.

a .

lI immediately to the southeast of the park the Schuylkill Expressway iI and the Pennsylvania Turnpike converge. Traffic from this location

is routed up PA 363 past the Upper Merion industrial / commercial development to - the eastern entrance of the park. At this major

!)l intersection PA 363 joins PA 23, and Outer Line Defense Drive joins Valley Forge Road. Commuters on PA 363 and Valley Forge Road l

1:

l'.! 41 C ___ ___ _ _ _ _ __ _ _ __ _ _ _ - -

Ih A

.9

. usually continue north to PA 23. The visitor, however, must make a dangerous left turn into the park across the path of heavy commuter traffic.

Another transportation facility in Valley Forge is the one-lane Betzwood Bridge across the Schuylkill River. This dilapidated but picturesque bridge handles one-way traffic from the Betzwood picnic a

and boat launch area. The Knox Covered Bridge, which crosses Valley Creck, is also one lane but serves two-way traffic. The I bridge, a historic structure, is the property of the Pennsylvania Department of Transportation and is in some danger of destruction b from flooding of Valley Creek. Two other bridges span Valley Creek: One carries PA 23 traffic near Washington's headquarters to and appears adequate; the other serves very limited utilitarian traffic between Lafayette's quarters and Yellow Springs Road.

/

Se Two railroad lines pass through the park. The Reading Railroad 38 line follows the south side of the Schuylkill River, and trains stop at the Valley Forge Park train station . The station has recently been renovated, and the parking lot has been improved. A former

D station located near Washington's headquarters is no longer a m scheduled stop along the Reading route.

ht in 1976, SEPTA initiated increased train service to the Valley Forge station from c'entra! city Philadelphia for a period of three months.

T3? The state park also initiated fringe parking at the Valley Forge 30 Service Plaza of the Pennsylvania Turnpike System, with shuttle d

bus service into the park. Although this has not been repeated,

' 50- trains stop at the Valley Forge Park train station every day.

mn

  • Another railroad, the Penn Central, is located immediately north of
the park and serves industrial areas.

lc pp Because of the large area covered by the park and the nature and placement of historical exhibits, it is essential that vehicles be used

! in touring the park. The circulation of vehicles, ease of the visitor to guide himself, safety of the route, and interpretation of ptc

d the park are all critical factors to internal traffic flow. Many nu.

exhibits or points of interest are in full view from the road; consequently, distractions are common. Many of the two-way roads are narrow, steep, and curved. There are times when decisions must be made as to which route to take or which attraction to visit.

Many routes are deceiving and disorienting, and the visitor is frequently confused by the abundance of alternate paths and may

)

  • even miss a portion of the park unintentionally. Routes such as 23 and 252 are extremely hazardous to cross because of heavy traffic.

led.1 Numerous internal roads are frequently used as shortcuts to arrive e

at either end of the park. Some routes tend to destroy the interpretive and aesthetic value of park sites. Traffic along Gulph and Baptist roads crosses through the Grand Parade grounds; 62

Draft' General Management Plan, Valley Forge National Park, Nov. 1981 Table 1. Park Visitor Day Use (Typical Peak Summer Month)

Projected Total  % of  % Change Annual g Contacts Totbl From 1978 Visits 'T Activity 1978 1978 1979 1980 (1981) t N

Observation Towee Use 24,620 5.2 -6 - 37 107,649 M del Airplane Flying 3,150 0.6 -58 - 17 16,820 Horseback Riding 730 0.1 -23 + 63 6,728 Bicycling 5,685 1.2 -33 D:g Walking - 15 33,640 -

1,653 0.3 +6 + 62 16,820 Jcgging 3,241 -

0.6 +70 + 78 Fishing 40,368 763- 0.1 +42 + 92 10,092 Bacting. 813 0.1 +33 + 80 10,092 '-

Bus Riding - - -

11,205 2.5 +73 +195 225,391 '

Kite Flying 140 0 +58 +241 3,364 Picnicking 12,375 2.7 +2 +129 195,115

' Visitor Center Use 25,318 5.3 +48 + 41 242,211 Bstzwood Area Use 24,060 5.1 +21 + 38 f

228,755 Plsasure Driving 243,360 51.5 -18 -

6 1,547,460 Visits to Historic Facilities 115,869 24.5 NA* NA* 824,191 s

Tctal - 472,982 100% 3,508,696

  • Not applicable because certain historic sites have been removed from the  :

tour route. '

~

lic I

Visitation figures included in this section are based on several sources, tha . most. comprehensive of which is . the park's monthly public use report. _I Another source includes a visitor use survey that was conducted during -

.tha summer. of 1979 to provide data for this plan and .to analyze a park -

bus' transit system. Staff and planning team observations were also tapped for general visitation characteristics and trends.

Tha total volume of park-related use has greatly increased since 1975.

Tha commonwealth of Pennsylvania estimated 1.7 million visits in 1975; thsre were 3.1 million visits in 1979 and 3.3 million in 1980. Traffic counts for 1979 totaled over 1.1 million.

Of all traffic through the park, 25 percent is estimated to be park visitors; of this percentage, about 25 percent has historical interest.

Tha heaviest visitation occurs from April through December, with peak c:ncentrations on holidays and weekends during special attractions such ,

as fall color and dogwood flowering. In 1978 during the peak period,

.thsre were approximately 317,000 visitors per month compared with 93,000 visitors per month during the off-season (January-March). The 317,000 visitors per month is 11 percent of the theoretical capacity of the park's l

l 25

W hicle parking spaces. Since the state rehabilitation program, the bicentennial, and the park's recent national status, historically oriented visitation has increased dramatically. In 1978 over 250,000 visits were tallied at both Washington's headquarters and the visitor center.

Whereas historically oriented visitation is spread evenly throughout the week, nearly 40 percent of all recreational use occurs on weekends between 10:30 a.m. and 3:30 p.m. on Saturdays and 1:00 and 5:00 p.m.

on Sundays. Almost 70 percent of all Sunday visits take place during a

these peak hours. On a typical peak Sunday, 90 percent of all visitors use private automobiles; the remainder use other forms of transportation, such as tour bus, horse, bicycle, or foot.

In 1979 the 25 percent of Sunday visitors with historical interest (2,322 visitors) required 580 vehicle parking spaces at Washington's headquarters, the visitor center, Varnum's quarters, and Washington Memorial Chapel. The remaining 75 percent of Sunday visitors with

, . recreational interest (6,967 visitors) required 1,742 autos to be parked at outlying areas as well as major historic sites.

At present the 1,333 parking spaces serving historic sites will hold 16,000 cars with a 30-minute turnover during peak hours. The 1,241 spaces serving recreation areas will hold 7,400 cars with a turnover every 40 minutes. Based on the visitor use survey, the typical length of stay on the weekend of the historically oriented visitor is 27 minutes each at three sites; the visitor interested in weekend recreation stays about 37 minutes at one site. Total daily park capacity at the current turnover rate is theoretically about 93,600 historical and recreational use visitors.

. Assumptions can be made about the various use patterns of visitors based on their proximity to the park and how frequently they visit. National visitors (those living more than 50 miles away and requiring lodging somewhere in the vicinity) will visit infrequently, maybe only once or twice during their lifetime. The full range of visitor information and orientation, plus all interpretive facilities, picnic areas, and trails, could '

be used in association with seeing the historic resources. The visitor use survey indicated that 27 percent of the respondents were first-timers, and 33 percent were of national or regional origin. (The heaviest -

percentage of national visitation occurs during summer months.)

Regional visitors live from 25 to 50 miles away, which means they might seek accommodations in the area. They would likely visit the park 4 several times a year though not as often as local users Special events -

would particularly attract regional visitors . They might bring friends or .

relatives from out of the region on subsequent visits. After their initial orientation, regional visitors would likely concentrate on interpretive -

programs and historic resources of interest to t'lem. Their use would be '

spread more evenly throughout the year than national visitors; and they j would probably engage in some recreational pursuits during their visit. ,

i Local users live within a 25-mile radius of the park, the majority in the j suburban Philadelphia area. These visitors would use the park for historical purposes about like their regional counterparts; however, they {,

would visit the park more frequently for recreational purposes. To i 26 t

d t

d

continually reach this audience, interpretive programs would need to

,  ; change with time or be more specialized, e.g., seminars, lectures, themes.

3 d

'l General Development Existing Visitor Use Facilities. Table 2 inventories existing visitor use

" facilities within the park. Table 4, which is included at the end of the I

"The Plan, General Development" section, shows a comparison of existing l and proposed visitor use facilities (parking spaces, picnic tables, and j restrooms).

Access / Circulation. Various geographic barriers have forced the regional transportation routes through Valley Forge. The Pennsylvania Turnpike l (1-76) and County Line Expressway (PA 363) are man-made barriers, all of which have limited access to the park. Over the years increased traffic from housing developments has reinforced their utilitarian importance.

?

The primary mode of access to Valley Forge is by private vehicle. Local

residents sometimes ride horseback, walk, or bicycle into the park.

i Direct access by public transportation is limited.

Three state routes--23, 252, and 363--lie within the boundaries of the park. PA 23, south of the Schuylkill River, carries commercial and commuter traffic. PA 252, on the western edge of the park, carries a

{.

he,avy volume of truck traffic between PA 23 and US 202. .PA 363 serves as an extension of PA 23 and as access to the park from the east.

'[ Traffic at the Valley Creek Bridge exceeds 14,000 vehicles a day, with 9,000 vehicles on PA 23, 4,000 on Gulph Road, and 1,200 on PA 252.

Peak hour volumes on 23 are at 7:00-8:00 a.m. and 4:00-5:00 p.m. with j approximately 1,000 vehicles per hour in both directions. .

At present PA 23 and PA 252 are important to both external

, through-traffic and to park visitation. Generally, park visitors tend to i

drive at or below the speed limit, whereas commercial and commuter j traffic often forces traffic flow to exceed posted speed limits. The intersection of these roads, which is at the bottom of a steep grade, is i

the main entrance to the park from the west. This creates considerable confi:ct particularly when visitors are focusing on park features rather than traffic.

' Much of the commercial and commuter traffic on PA 23 is between Phoenixville and the western fringes of Philadelphia, including King of Prussia. To alleviate traffic congestion on secondary roads in this area, a four-lane limited access expressway known as the Pcttstown bypass is

now under contract. A spur from this route to Phoenixville will be

, constructed later. The Park Service also supports construction of access

} ramps at Pawling Road. These facilities combined should significantly

reduce nonpark-related through-traffic on PA 23.

I

LEA-24/ FOE-1 There is no assurance that plans for evacuation of the Ten mile radius will not be impeded by traffic congestion in the vicinity of Marsh Creek State Park, Exton area (involving Route 100) and Valley Forge Park, King of Prussia area.

These areas should either be included in the Emergency Planning Zone or adequate plans for traffic control and direction should be made to avoid adverse effects on EPZ evacuation.

Specifically, Congestion around Marsh Creek Park, and Route 100 backing up Northfrom Exton Mall (a recep' tion center, and alternative EOC for several municipalities) including the important traffic juncture at 113 and Route 100 near the transportation staging area at Exxon Pickering Creek Industrial Park,justSouth of Turnpike entrance and Marsh Creek Purk itself, would severely limit Evacuation Plan workability, especially in light of spontaneous evacuation onto Route 100 from the relatively large developments along that main evacuation route. Note also that the Turnpike entrance on Route 100 is not planned as being used f9r evacuation.

Also, thereis a ~ lack of Emergency Planning for the Valley Forge National Park and the King of Prussia Area. This contention concerns the traffic and use patterns for Valley Forge Park and related commuter and shopping and business traffic to

.and from King of Prussia, including King of Prussia Plaza, one of the nation's largest and oldest shopping mall complexes.

All of this ! dependent on and interrelated with the highway nexus which focuses long distance travel, medium distance and regional and local traffic on this spot. This area is in the direction of the prevailing winds from Limerick, between Limerick and Philadelphia, which itself limits Southeast egress from this area.

MARSH CREEK Provision for the orderly flow of traffic from Marsh Creek Park should,in addition to traffic control, include some information to users of the p' ark as to the alternative routes to be taken

e so as to avoid the main evacuation routes (such as to avoid Route 100 at Eagle, also possibly to stay od1 R outell3 if diverted as intended onto Moore Rd from Park Rd at Traffic Control Point on Park Rd). Simple traffic control at Moore Rd and Park would not insure that up to 2500 vehicles in the Park, many from outside the area, could find their way on these small back roads to a suitable main route. Clear policy insructions are also needed at this particular TCP to allow residents at Park who live in EPZ back onto Route 100 North since it is a very long way back around the reservoir to use any other route.

B. The intersection of Route 100 and 113 gouth of Marsh Creek and the Turnpike is a critical area upon which the evacuation of the EPZ is~ dependent. Traffic flow along Route 100 South from this point to Exton Mall poses additional complications involving spontaneous evacuation of residential and corporate areas around Exton. Predistribution of basic suggested route information to residents and employees could help solve this, Also the Exton area includes the transportation staging area at Pickering creek , reception area at Exton Mall And alternate EOC next dopr.

C. Vaflev Forge The Hmm Traffic study does not take into account Valley Forge Park traffic (see LEA filing Aug 31) Assumptions of HMM study which would affect analysisof traffic flow in the affected areas tend to mischaracterizethe actual impact of traffic in area (particularly Dynamic Route Selection)

Notification and traffic routing information to Industries in King of Prussia Area is needed to prevent large releases of employee traffic into evacuation routes at critical times.

The effect of regular traffic concentrations, in addition to the flow from the EPZ and spontaneous near EPZ evacuation is not considered as it affects traffic leaving the planning tone.

Basis: NUREG 0654 Appendix 3, page 16; NUREG 0654 I.D.

page 8; 10 CFR 50.47 (c)(2) LEA incorporates by reference F0E 1 Anthony 1/31/84 incl map m

O LEA-26

'Ibe Draf.t County and. Municipal '.RERP's are deficient in that they do not comply with'10 CFR j50.47 (b)(5) because there is no prompt aler-ting system operative and in place, no assurance of prompt notification of emergency workers who must be in place before an evacuation alert can be implemented, and there is no assurance of adequate capability to conduct route al e r t in g , wi'th'in the time; req'uiro

by NUREG 0654 Appendix 3, Criteria for acceptance 2.a and 2.c.

Specifically,

1. Philadelphia Electric Company intends that individuals situated within a 10 mile radius of the plant will be alerted to a radiological emergency,,through a siren notification system.

This. system fails to meet the requirements of'10 CFR g 50.47 (b)(5) and (b)(6), and 10 CFR Part 50, Appendix E, Item D.2, and NUREG 0654 Items II.E and II.F. for the following reasons:

(a)PECO has failed to demonstrate' that siren coverage Adequately covers the EPZ and will not be adversely constricted by weather' conditions which will affect the audibility of the sirens.;

(b)PECO has not demonstrated that in the event of a loss of power to all or part of the system, that it could provide back-up power in: time to offer timely notification to the public.

(c)PECO's prompt notification system does not provide for those individuals who may be in areas not covered by the sirens.

! -2. The phone notification system of emergency response organizations

. by'the-County EOC, prior to public notification, is a complex process involving the use of an automatic dialer (RECALL system) subject to verification and manual notification as sufficient county EOC Staff arrive to man the phones. (Chester County RERP, Draft #8, Appendix C-2, page C-1-4).

LEALeontends that that notification times for emergency workers and. organizations must be rapid and certain to enable the public notification-system to be activated in the time required, as specified by NUREG 0654, Appendix 3, page 3-3. Whatever combin-ation of automatic dialers and sequential phone calls for noti-fication and-verification is to be used, the notification of

ADDITIONAL BASIS FOR CONCERNS ABOUT THE PROBABILITY OF I' , LOSS OFsPOWER RENDERING SIREN NOTIFICATION SYSTEM INOPERABLE.

LEA-26 NRC Requirements for Prompt Public Notification System NRC's regulations at 19 CFR Part. 50, Appendix E, Section IV, Part D, Paragraph 3, contain the following requirment:

By February 1, 1982, each nuclear power reactor licensee shall deonstrate that administrative and physical means have been established for alerting and providing prept instructions to the public within -the pine exposure pathway EPZ . . . We design objective of the prompt public notification syste shall be to have the capability to essentially complete the initial notification of the public within the pine exposure pathway EPZ within about 15 minutes.

. Analysis of ISS-PRA and ISS-SARA for Loss of Power Power Contribution to Core Melt Frequency

. ISS-PRA Analysis of Non-Seismic Loss of Offsite Power

. LGS-PRA calculated a mean core melt frequency of 1.5 x 10 -5 per reactor year for " internal even's"t [ LGS-PRA, page 3-112] . We term " internal events" is s mething of a misnmer in this case because the LGS-PRA analysis of

" internal events" inclu$es plant transients initiated by a loss of offsite

. - power. Such initiating events are designated T Esequences.

Of the tot &l core melt frequency of 1. 5 x 10- per reactor year, LGS-PRA estimates that 44% arises fran two accident sequences initiated by a loss of offsite power. tese accident sequences are designated T W (loss of E

. offsite power followed by failure of high-pressure and low-pressure injection;

-6

- estimated core-melt frequency contribution of 5.9 x 10 per reactor year) and T UX (loss of offsite power followed by failure of high-pressure injection and E

failure to Smely initiate the Automatic Depressurization Syste; estimated core melt u2quency contribution of . 6.9 x 10 par reactor year) (LGS-PRA, i

. pages 3-35 and 3-198] .

ISS-SARA Analysis of Seismic Loss of Offsite Power LGS-SARA apparently treated the LGS-PRA mean core melt frequency estimates. as " point estimates" (see, for ex mple, Table 12-1, page 12-22, LGS-SARA). LGS-SARA extended the LGS-PRA risk estimates by including an 9

, _ . . -+ 2 -

e u -

. i analysis of external events, incitrling seismic events.

According to the LGS-SARA analysis, offsite power is lost at a median ground acceleration of 0.20g [ LGS-SARA,- Table 3-1, page 3-161 ' Ibis is consistent with the Zion, Irrlian Ecint, and Seabrook PRAs performed by Pickard, f. owe & Garrick (these studies, as well as MS-SARA, utilized the seisuic risk analysis services of Structural Mechanics Associates) .

IfaS-SARA estimated an overall frequency of core melt due to all causes of - 4.4 x 10~ per reactor year [ LGS-SARA, page 12-4] . Of this total, 6.6 x 10- comes from the If>S-PRA analysis of " internal events" (see above) . 'Ihis represents a contribution of 15% of total core melt frequency fra non-seisnic loss of offsite power.

TraS-SARA identified a ntanber of seismic. accident sequences. Sequence Tgg E UX (seisuic loss of offsite power followed by failure of high-pressure injection and failure to timely initiate the Automatic Depressurization System) is estimated to contribute 3.2 x 10

-6 to total core melt frequency

[ LGS-SARA, Table 12-3, pages 12-23 through 12-25) . Sequence T E C Cg g M 2 (**i"*iC loss of offsite power followed by failure of the control rods to insert and

~ failure of the boron injection system) is estimated to contribute 5.4 x 10 to total core melt frequency [ LGS-SARA, Table 12-3, pages 12-23 throtgh 12-25].

In addition, TraS-SARA identifies sequence TgRPV (seismic failure of the reactor vessel upper lateral support) as contributing 9.6 x 10

-7 per reactor year to - total core., melt frequency (LGS-SARA, Ta- ble 12-3, pages 12-23 throtgh 12-25]. Althotgh riot explicitly listirg T3 (seisnic loss of offsite power; in this sequence, it is clear fra Table 3-1 that offsite power would be lost since T gRPV occurs at a median ground acceleration of 1.259, while . offsite power is lost at 0.20g [TraS-SARA, Table 3-1, page 3-16) . 'Ihus, sequence T RPV g also contributes to the frequency of accidents in which a seisnic loss of offsite power occurs.

. Stmaing the seismic . loss of offsite powr sequences, one obtains a

-6 total contribution to core melt frequency of 4.7 x 10 per reactor year.

This represents a contribution of 10% of the total core melt frequency from seisuic loss. of offsite power. Exaninire listing of daninant core melt sequences in Table 12-3 [ LGS-SARA, pages 12-23 throtsh 12-25), 3 of the top 6, 4 of the top 9, and 6 of the 17 doninant sequences are caused by or accanpanied by loss of offsite power.

t

-r Sunmary and Perspective Based on the - analyses presented in LGS-PRA and LGS-SARA, accidents caused x 10-5 by or accompanied by a loss of offsire powr contribute a total of 1.1 per reactor year to the total core melt frequency of 4.4 x 10-5 per reactor year, a contribution of 25% fran loss of offsite power sequences. In addition, three of the top six dminant accident sequences (and four of the top nine and six of the top seventeen) are loss of offsite power sequences.

Moreover, Table 12-9 demonstrates that seismic initiating events contribute about 84% of mean early fatality risk; it can be dedtred that T E

loss of offsite power sequexes contribute another 3%. 'Ihus , accident sequences involving loss of offsite power, while responsible for 25% of core melt frequency, are responsible for about 87% of mean early fatality risk.

Nreover, if energency response parameters (such as delay time and effective evacuation speed) more appropriate to seismic and loss of power conditions were modeled in the CRAC2 conseugence calculations, increase. these contribution would

'Mw conclusions rest upon the validity of the IGS-PRA and IGS-SARA analyses, te the extent that these analyses are valid, the interpretation given then in this mano argms for a re-exanination of the pranpt public alerting systen proposed by PECO for Limerick. ' Die system proposed is estimated to fail ,in 25% of all core melt accidents (and for those accidents which contribute 87k of mean early fatality risk) .

A possible replacanent would be a tone-activated radio system in which emergency messages are broadcast over the NOAA weather radio systen. Radio Shack supplies a " Weather-Radio" for roughly $30 which operates on nonnal AC g

power (backed up by a DC battery) and which is activated autanatically by a E tone broadcast by NOAA.

When the tone is broadcast by t0AA, a loud, shrill

" beep" is heard to alert the public to listen for an energency message. As a f.

side benefit, 7 the public would also receive notifications broadcast by NOAA for hurricanes, tornadoes, winter storns, and floods.

I r

b IE

?!?

3 a%

. ' s.=

=;

I

9 LEA-27 l

l There must be specific and adequate plans to protect Camp

~

Hill Village Special School, Inc. in East Nantmeal Twp.,

Chester County and for Camp Hill, Village School in West Vincent Twp., Chester County.

Specifically,

1. No written-plan has been developed for either facility
2. RNo determination of staff participation and role assignments has been made
3. No equipment needs, including telecommunications and.transpor-tation needs has been assigned ~; -
4. No evaluation of adequacy of school buildings for sheltering purposes has -been determined
5. There are indications that school staff and school officials have serious reservations about the adequacy of the planning that they are aware of. Should these staff and officials refuse to participate in the planning as proposed, either, alternate plans adopted by the schools should be coordinated and supported by their respective municipal-ities, or if no agreement to participate is reached,'the appropriate municipality should be prepared to implement all aspects of the plan, passing any unmet needs ento the county or state.
6. In the event that responsibility for emergency response plan-ning is passed on to the municipality, it must be determined that either of the municipalities involved are able to meet the needs of these schools, due to the fact that there are large numbers of mobility and incellectually impaired individuals involved..

BASIS: 10 CFR 50.47 (2), and ( 2) (b) (1) , (2) (b) (5) , and ( 2) (b) (15)

NUREG 0654 Appendix 4, Criteria C (Special Facility Populations) page 4-3.

9

- - ,,. --r-- ~ - ..~- + ,-,.,-r,c.--- -w--.-,---3,,

, . . . . - - , , , - -,.----.,e-,,,ywry ..r-, .,r, -

s LEA-28 (a) There is no assurance in the County or Municipal RERP's that the National Guard will have time to mobilize to carry out its responsibilities withregard to towing and providing emergency fuel supplies along state roads.

Specifically, I

1. The Montgomery County Draft RERP, #6 states the average Mobilization and deployment. time for the National Guard Units assigned to Montgomery County is appro-ximately 6-8 hours after order by the Governor to state active duty. (Annex M,Section IV.A)
2. The Chester County RERP Draft #8 states that the average time for the National Guard to mobilize and deploy to the area of operationsiis approximately 6-8 hours.
3. The Berks County Draft RERP #5 states that the average time for the National Grard to mobilize and deploy to the area of operations is approximately 8 to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

BASIS: NUREG 0654, Appendix 4: NUREG 0654 Criteria C.4 10 CFR g 50.47 (2), (b) (1) & (b) (6)

M OG (b) There is no assurance provided in the Municipal, or County

$% RERP's that there are sufficient recources available g6 td provide towing, gasoline, and snow removal along

< non-state roads. According to PEMA , the National el Guard has neither the resources for snow removal ga nor the responsibilities for it, according to the

, ,7 Commonwealth's Diasater Operations Plan.

<v -

.Jg Specifically, PennDOT's capability to cleai state v evacuation routes is dependent on required mobilization h

  • time, prompt notification,;and employee contractual gg limitations. Training and verification for these uv workers is essential, and unconfirmed. There is

%s no listing or reference to training of PennDot o*

-o (personnel in Applicant's which-has been provided to Training LEA) Session Analysis.

    • The resource manual (Annex K Appendix K-3) of Berks e and Montgomery County Plans includes no specific 0b agreements between counties and service / towing stations
  • with regards to a Limerick Emergency. Also, Peco's

$3 answer (8/2/84 P. 53) " Gas station employees are not being requested to remain on duty within the EPZ."

m 5 .

Snow removal on municipal roads is only assumed to be per usual arrangements with municipalities with no g

confirmation of availablity in a Limerick Emergency.

t unmet PEMAandmunicipalitieshgvgn'gorkd needs yet. Conversation.w P 8 30 8 . -

~. -

_ _ _ _ . ~ _ _ _ . _ . _ _ . - _ , _ . _ . . . _ _ _ . _ _ _ . . _ . _ . . _ . _ . . _ _ _ _ _ _ _

F-.

i l

CERTIFICATE OF SERVICE l

I'hereby certify that Limerick Ecology Action's Respecification of Admitted 0ff-Site Emergency Planning 1

on the parties Contentions has been sep ed to this proceeding listed below on this 6th.-dayCof September, 1984. Th6se (*)

othersyvere served by deposit received delivery by hand segvice. All in U. S. mail, first class pos a e # 1 .'3 0 prepaid. '

--;',5 55, c %.tMy

, (c) . Lawrence Brenner,-Chairman (2)

Administrative Judge (*) Ann P. Hodgdon, Esq.

U.S. Nuclear Regulatory Office U.S.

of the Executive Legal Director Commission Nuclear Regulatory Commission

-Washington, DC 20555 Washington, DC 20555 (0) .Dr. Richard F. Cole (*) Benjamin Vogler, Esq.

Administrative Judge Office of the Executive Legal Director U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, DC 20555 Washington, DC 20555

(*) Troy H. Conner, Jr., Esq.

(Q) fDr. Pete'r A. Morris Conner and Wetterhahn

. Administrative Judge 1747 Pennsylvania. Ave., NW U.S. Nuclear Regulatory Washington, DC 20006 -

Commission Washington, DC'20555 Philadelphia Electric Company 6 Attn: Edward G. Bauer, Jr.

I Docketing and: Service Section VP and General Counsel {

[ Office of the Secretary 2301 Market St. R Phila.,'PA 19101 i

U.S. Nuclear Regulatory Commission i Washington, DC 20555 Thomas Gerusky, Director Bureau of Radiation Protection, DER "

L Atomic Safety and 5th fl, Fulton Bank Bldg.

Licensing Board Panel Third and Locust Sts. r i

U.'S. Nuclear Regulatory Harrisburg, PA 17120 e Commission Spence W. Perry, Esq. <

, Washington, DC 20555~ p Associate General Counsel 3 FEMA Atomic. Safety and Room-840 2 Licensing Appeal Panel 500 C St., SW $

U.S._ Nuclear Regulatory Washington, DC 20472 p=

Commission-Washington, DC 20555 i Zori Ferkin, Esq.  ;

o Governor's Energy Council P.O. Box 8010 g:

1625 Front St. ~

Harrisburg, PA 17105 L A

o

_ - -