Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
- _ - _ _ _ _ _ __
c,e u p tw , cm,-on y c m.co e rce w tw o.o, iset UHa e b: s*/ '
- 4. m, ; s :o i , , ,
- . 1 >> . < 6 s m. 3, .
u\
(ieoi,t;iti Poner w e e,m aro - w em t i at ' f ': ?'
HL-2040 000116 rebruary 7. 1992 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50 321, 50 366 OPERATING LICENSES DPR 57, NPF 5 MONTHLY OPERATING REPORTS Gentlemen:
Enclosed are the January 1992 Monthly Operating Reports for Edwin 1.
Hatch Nuclear Plant - Unit 1 Docket No. 50 32), and Unit 2 Docket No.
50 366. These reports are submitted in accordance with the requirements of Technical Specifications Section 6.9.1.10.
Sincerely.
0'/
J. T. Beckham, Jr.
SRP/sp
Enclosures:
- 1. Monthly Operating Report for Plant Hatch - Unit 1
- 2. Monthly Operating Report for Plant Hatch - Unit 2 c: (See next page.)
y, 9202110230 920131 PDR ADOCK 05000321 R PDR
4 GC(ilglillbhel U.S. Nuclear Regulatory Conunission February 7, 1992 Page lwo ct Geacq1h_P_qwet C.ctnpany Mr. li. L. Sumner, General Manager Nuclear Plant NORMS VillRcitet_lleg41aiory Cone 15110nuJaihinaiuni.A02 Hr. K. Jabbour, Licensing Project Manager Hatch U.S. ((utlear Reuulator.LComittigndkg101Ll3 Mr. S. D. Ebneter, Regional Administrator Mr. (.. D. Wert, Senior Resident inspector - llatch Ill-2040 000116
i ,
ENCLOSURE 1 PLANT HAICH UNIT 1 NRC DOCKET 50 321 MONTHLY OPERA 11NG REPORT JAngary 1_992 TABLE Of CONTEN15 EA92 Narrative Report El-1 Operating Data Report El.2 ,
Average Daily Power level El 3 Unit Shutdowns and Power Reductions El 4 i
l 4
i
)
sV ,
11t 2040 000116 :
. . . - , , . , ,, v4 , . ,- , - c---,,-,...- , , - - ~ . . . _ . . . . . . , , , , _ , . ~ . - 47..,,. ,,-m.. ,,.~m._ _
r . , ---. . - . . . . - ---.
s PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 1 DATE: 1992 i NARRATIVE REiORT COMPLETED FEBRUARY BY: R. 3,H. BEARD 1 I
TELEPHONE: (912) 367-7781 x2878 JANilARY l 0000 Shift continued to maintain rated thermal power.
JANUARY 24 0005 Shift reduced power to approximately 700 GMWe to perform Turbine Control Valve and Turbine Bypass Valve Testing.
JANUARY 24 0200 Shift reduced load to approximately 650 GMWe to investigate the performance of a relay associated with the No.1 Turbine Stop Valve.
JANUARY 24 0637 The unit was returned to rated thermal power.
JANUARY 31 2400 Shift continued to maintain rated thermal power. ,
I El-1 l
. l l
l OPERATlHG DAM M tz g) itLEPHONEt 7, hxtB78 OPERATlHG IIAIU$
- 1. UNIT NAME: E. I. HATCH - UNIT ONE
- 2. REPORT PERIOD - JANUARY 1992 L
- 3. LICENSED THERMAL POWER MWt l: 2436 4.NAMEPLA1 CRATING (GROSS (MWe;it 850 i 5.-DES ;GN ELECTRICAL RATING LNLT MWe) 776.3
- 6. MAX.' MUM DEPENDABLE CAPAC fY (GROSS MWe 774
- 7. MAX. MUM DEPENDABi.E CAPACLTY 741 8.IFCHANGESOCCURINCAPACITY(NETMWe):) RATINGS JITEMS 3 THROUGH 7) SINCE LAST REPORT GIVE REASONS: NO CHANGES 9.IbWERLEVELTOWHICHRESTRICTED NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, :- if ANY IF AkY N/A (NET MWe):
THIS MONTH YEAR-TO-DATE CUMULATIVE r
- 11. HOURS IN REPORTING PERIOD: 744.0 744 -140999 !
- 12. NUMBER OF HOURS REACTOR WAS CRITICAlt 744,0 744,0 103081.8 '
- 13. REACTOR RESERVE SHU1DOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE: 744,0 744.0 98337.1 -
- 15. Uhli RESERVE SHUTDOWN HOURS:- 0.0 0.0 0.0
- 1808472 1808472 218315492 :
16.'GRO.3 THERMAL ENERGY GENERATED (MWHt)He):
- 17. GROSS ELhiRICAL ENERGY GENERATED (MW 583170 583170 70289850 18.'NETELECTRICALENERGYGENERATED(HWHe): 558750 558750 66839670
- 19. UNIT SERVICE FACTOR: 100.0% 100.0% 69.7%
, 20. UNIT AVAILABILITY FACTOR: 100.0% 100.0% 69.7% '
210 UNIT CAPACITY FACTOR 101.4% 101.4% 63.2%-
22.UNITCAPACITYFACTOR"quSINGMDCNET;it I
USING DER NETJ: 96.7% 96.7% 60.8%
- 23. UNIT FORCEO OUTAGE RA E 0.0% .
C.0% 13.0% i
- 24. SHU1 DOWNS SCHEDULED OVER THE NEXT 6 MONTHS fTYPE DATE AND DURATION OF EACH): NA 25.-IF SHUT 00WN AT END OF REPORT PERIOD ESTIMA"EDDATEOF,STARTUP: NA :
26.UNITSINTESTSTATUS(PRIORTOCOMMERCIALOPERATION):
NA l 4
3 El-2 ,
PLANT E. 1. HA1CH - UNIT DNE DOCKET NO.: 50-321 DATE: 1992 AVERAGE DAILY POWER LEVEL FEBRUARY COMPLETED BY: R. 3,M. BEARD TELEPHONE: (912) 367-7781 x2878 DAY Net HWo 1 .............. 753 ,
2 .............. 751 3 .............. 749 4 .............. 753 5 .............. 752 6 .............. 753 7 .............. 753 8 .............. 751 9 .............. 748 10 .............. 752 11 .............. 756 12 .............. 752 13 .............. 745 14 .............. 751 15 .............. 755 16 .............. 754 17 .............. 755 18 .............. 755 19 .............. 756 20 .............. 755
' 21 .............. 754 22 .............. 753 23 .............. 747 24 .............. 754 25 .............. 725 26 .............. 753 ,
27 .............. 751 28 .............. 751 29 .............. 750 30 .............. 749 31 .............. 746 1
i El-3
UNIT SHUTDOWNS AND POWER REDUCil0NS DOCKET NO - 50~32 UNIT NAME: DATE: FEBRUARY 3, Joog E. 1. HATCH - UNIT ONE COMPLETED DY: R. M -
x2878 REPORT HONTH: JANUARY 1992 R H 3 y
A f LICENSEE 5C h thRT NO.
DATE (Nhh0N
) N Dh NUMBER ED HE hEENT (SUBCODE)
CAUSE & CORRECTIVE A TION TO
_. _ __, PREVENT RECURRENCE No significant power reductions this month.
TYPE-REASON:
METHOD-F-FORCED EVENTS REPORTED INVOLVE A-E0VIPM FAILURE S-SCHEDULED B-MAINTEt t EORTES[' EXPLAIN) 1-MANUAL A EDUCTION GREATER THAN 20%
IN AVERAGE C-REFUElli.'G 2-MANUAL SCRAM D f.'hht4kfhfgh,C ThfRkkfpfNg E L
!'$P WfdfffffCION Rs.
F-ADMINISTRATIVE LICENSE 5-LOAD REDUCTION G-OPERATIONAL ERROR (EXPLAIN) 9- THER (EXPLAIN)
H-0THER (EXPLAIN)
El-4
c ENCLOSURE 2 PLANT HATCH UNif 2 NRC DOCKET 50-366 MONTHLY OPERATING REPORT unnrL1291 ,
b TABLE OF CONTEN15 .
EGt Narrative Report E2-1 l Operating Data Report E2-2 Average Duily Power Level E2-3 Unit Shutdowns and Power Reductions E2-4 F
' HL-2040 000116
PLANT C. 1. HATCH - UNIT TWO DOCKET NO: 50-366 DATE: 1992 NARRATIVE P)RT FEBRUUY COMPLETED BY: R. 3,M. BEARD TELEPHONE: (912) 367-7781 x2878 JANUARY l 0000 Shift continued to maintain rated thermal power.
JANUARY 23 1800 shift began reducing load for unit shutdown to identify and repair the source of increased drywell floor drain leakage.
JANUARY 24 0455 The generator was removed from the trid.
JANUARY 24 0948 1he reactor was manually scrammed.
JANUARY 28 1354 Shift began withdrawing control rods to bhng the reactor critical, JANUARY 28 1710 The reactor achieved critical status.
JANUARY 28 2240 Shift began returning the unit to hot shutdown to investigate and >
repair the source of high turbine vibration.
JANUARY 29 0043 The reactor was placed in hot shutdown.
JANUARY 30 1240 Power ascension activities were initiated.
JANUARY 31 0232 The generator was tied to the grid.
JANUARY 31 2400 Shift continued returning the unit to rated thermal power.
fuel 3 reconditioning measures were implemented to minimize the possi)ility of further fuel damage.
E2-1 i
i OPERATING DATA-REPORT DOCKET NO: 50-366 DATE: 1992 COMPLETEDFEBRUARY BY: R. 3,M. BEALD
~
OPER/11NG STATUS:
- 1. UNIT NAME: E. I. HATCH - UNIT TWO
- 2. REPORTING PERIOD: JANUARY 1992 MWt : 2436
- 3. LICENSED
- 4. NAMEPLATE THERMAL RATING (GROSS POWER (MWe : 850
- 5. DESIGN f_ECTRICAL RATING N T MWe : 784
- 6. MAXIMbH OEPENDABLE CAPACI Y GROS MWe): 798
- 7. MA?! MUM DEPENDABLE CAPACITY NET MWe /65
- 8. If c.HANGES OCCUR IN CAPACITY RATINGS):
SINCE LAST REPORT GIVE REASONS:
(!TSMS 3 THR0VCH Maximum Depen 7)dable Capacities for 1992 are 798 MWe Gross and 765 MWe t).
Southern Company Services determined the values usi a.
- 9. POWER LEVEL TO WHICH RESThlCTED, IF ANY (NET MWe): 199 oEerational NO E*TRICT.0NS
- 10. REASONS FOR RESTRICTION.-IF ANY: N/A THIS MONTH YEAR-TO-bnTE CUMULATIVE
- 11. HOURS IN REPORTING PER!00: 744,0 744 108625
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 640.8 640.8 81502.3
- 13. REACTOR RESERVE SHtlTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE: 578.4 578.4 78398.0
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 1372643 1372643 17352?cSI
- 16. GROSS THERMAL ENERGY GENERATED (MWHt)He):
- 17. GROSS ELECi3ICAL ENERGY GENERATED (MW 444900 444900 56883020
- 18. NET ELECTRICAL ENERGY GENEkATED (MWHe): 424722 424712 54171136
- 19. UNIT SERVICE FACTOR: 77.7% 77 7% 72.2%
- 20. UNIT AVAILABILITY FACTOR: 77.7% 77.7% 72.2%
- 21. UNIT CAPACITY FACTOR USING MDC NET : 74.6% 74.6% 65.2%
- 22. UN!1 CAPACITY FACTOR USING DER NET : 72.8% 72.8% 63.6%
- 23. UNIT FORCED OUTAGE RA E: 4.6% 4.6% 7.4%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH): NA 25.IFSHUTDOWNATr?OOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP: NA
- 26. UNITS IN TEST hi?.fUS (PRIOR TO COMMERCIAL OPERATION): N/A E2-2
Pladi E. I. HATCH - UNil-TWO DOCKET NO: 50-366 DATE: 1992 AVERAGE DAILY POWER LEVEL FEBRUARY COMPLETED BY: R. 3,M. BEARD TELEPHONE: (912) 367-7781 x2878 DAY .iet MWe 1 .............. 768 2 .............. 765 3 .............. 765 4 .............. 762 5 .............. 768 6 .............. 768 7 .............. 767 8 .............. 767 9 .............. 764 10 .............. 766 11 .............. 771 12 .............. 767 13 .............. 762 14 .............. 767 15 .............. 770 16 .............. 768 17 .............. 768 18 .............. 770 19 .............. 769 20 .............. 770 21 .............. 769 22 .............. 769 23 .............. 688 24 .............. 24 25 .............. 0 26 ............., 0 27 .............. 0 28 .....,,,...... 0 29 . ........... 0 30 .. .......... 0 31 ............... 174 l
~
E2-3
UNIT SHUTDOWNS AND 00WER REDUCTIONS DOCKET NO: 50-366 DATE: FEBRUARY 3, 1992 UNIT NAME: E. I. HATCH - UNIT TWO COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: JANUARY 1992 R h S E E Y T A T LICENSEE SC Y S H EVENT T0 C0'iPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED 40DE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 92-001 920124 S 137.7 a 2 N/A CB PIPEXX The unit was shut down due to (A) an unidentified source of floor drain leakage inside the drywell.
Investigation revealed the Packing Leakoff Line for the "B" Reactor Recirculation Pump's Discharge Isolation Valve had separated.
The discharge valve was repacked and the leatoff line reconnected.92-002 920129 F 27.9 8 4 N/A HA TURBIhE The turbine could not be placed in service due to high vibration. Investigation revealed the rotor for the "B" !ow Pressure Turbine was not properly balanced. A balance shot was installed and the turbine returned to service.
TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%
F-FORCED 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED A-EQUIPMENT B-MAINTENANCE OR TEST FAILURE (EXPLAIN) 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.
D-REGULATORY RESTRICTION 4-CONTINUATIONS E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
E2-4