Rev 8 to Procedure 7220-C-211(Q), Tech Specs for Backfill for Midland Plant,Units 1 & 2
ML20090L769
Person / Time
Site: Midland
Issue date: 11/01/1979
From:
BECHTEL GROUP, INC.
To:
Shared Package
ML17198A223 List: ... further results
References
CON-BOX-04, CON-BOX-4, FOIA-84-96 7220-C-211(Q), NUDOCS 8405260058
Download: ML20090L769 (10)


Text

_ _,

(

34 '{

yE3j j Ecchtel Associates Professional Corporation Ann Arbor, Michigan jg n dig X

SjeC C-30V la

>3}

t-3 TECHNICAL SPECIFICATIONS

=

f, FOR E

BACKFILL b

a r g

MR NE g

CONSUMERS POWER CO.

E MIDIAND PLANT, UNITS 1 & 2 n

g MIDLAND, MICHIGAN 1

41fI

'.i

.; i C*

51 ji E}

Consisting Of:

i 3j 1.

Technical Specification 3

-l

}

g se a.

l ' 8

[

l t

e.

u at(

p.j.,3 Revised as noted on facing sht. Inc SCN 9002 g

pg f,*

g

g. g,g Revised as noted on facing sheet; p

g[y ' peg

)

4 T....u...A enamenes an emw.

A Alv2.

j I,

d #//g/g ifajor, reyi,sion. Igcorporated SCN 9001 Revised as f' g I

g 10/

i as noted on Facing Sheet, Incorporated g[ (pg Afh y

g"g geise as nWted on racing sheet. Incorporated g

g RLCg d

ll* 8 *'I6 Rev. as noted on Facina Sht.t Inc. SCN 6001 & 6002' @

bM

[9N i

f E

A 4. 4.'78 Refined as noted on Faefne Ehmet 8X/f--

k.D *"

P t

A I- /d =Y Raviand ma noemd an Factne Ekmae. Tncern. SCN 4801 82 8 Wi

/A 4 T3-74 Issued for Construction ~

4&A/N ' (M' #/dN

  • g save sovie.ees e,

fews fe$ '

CONSUMERS POWER b M m ** 7220 MIDLAND PLANT, UNITS 1 & 2 1

BAPC MIDLAND, MICHIGAN 8

4, l;

C-21M9)

AI 8405260058 840517

.1La PDR FOIA

,,,uv i

lii '#

ee

.\\

RICE 84-96 PDR

~_

L/.f T l^

L cT L

T T

It!. E T SHEET SHEET SHEET SHEET 6HEET CHEET g

R REV i

.8 l

11 8

l l

l iii

  • /

l 1

'7 l

l 2

7 l

l 3

7 I

4 7

5 8

6 7

_7 7

8 7

8 9

l 7 10 7

I

=

l l-278 ' dis g sgeg g thru g glg'/g 7

a i

klm

<nenExpanoed shes 1-4 YAoY'W6 l

n sH==*= 4-o

  1. dahhavisedShithru6 M N) N; l

5 4

~2kT1 Revised Sh*i,11,1,2 kG k e

i 4

3 g l.,. ;

Ra hts. 1,11,

\\3 SPLC 2 64-7(NNEINe8sSt.'$f1' -[/4 i*l/kM

'l-/f.7/ evi s ed sh t s i.11 1 2 5' *NbM j

1 R

0 (1f'24 Initial Issue Lb 6" t '. (([4 N/?v evised shts 1,11,3

,a y,p Q.{

h NO.

cATE REVISIONS SY CHK*D A

NO.

DATE REVISIONS SY CHKD APP *D FACING SHEET l

JOB No. 7220 MIDLAND PLANT UNITS 1 & 2 g

BACKFILL d

Specification No.

e g

CONSUMERS POWER COMPANY C-211 (Q) g Sheet 11 cy, ;

b a

n

Spacification 7220-C-211(Q), Rev 7 g{

TECHNICAL SPECIFICATIONS FOR BACKFILL d

FOR THE CONSUMERS POWER COMPANY MIDLAND PLANT UNITS 1 AND 2 MIDLAND, MICHIGAN TABLE OF CONTENTS SECTION TITLE PAGE 1.0 WORK INCLUDED l'

2.0 RELATED WORK NOT INCLUDED 1

3.0 ABBREVIATIONS 2

4.0 CODES AND STANDARDS 2

5.0 EXCAVATIONS 2

6.0 FOUNDATION PREPARATION 2

7.0 RECONDITIONING EXISTING EARTHWORK 3

8.0 BACKFILL 3

9.0 WINTER PROTECTION OF THE BACKFILL 10 10.0 QUALITY REQUIREMENTS 10

/A 11.0 MEASUREMENT FOR PAYMENT 1D l

.i s

e t

111 gy\\

. l j)

Specification 7220-C-211(Q), Kev 7 jg TECHNICAL SPECIFICATION FOR BACKFILL 1.0 WORK INCLUDED 1.1 STRUCTURAL BACKFILL The term " structural backfill" as used in this specification includes backfill materials to be placed within 3 feet of the exterior wall of any plant area structure.

Materials used as described above may, subsequent to such usage, also support part of another structure.

t 1.2 PLANT AREA BACKFILL The term " plant area backfill" as used in this specification shall include placement of all embankment materials required to construct the fill in the plant area, berm backfill, and dikes within the plant area except backfill l

materials to be placed within 3 feet of any plant area structures.

Only sand from offsite sources may be used in backfill areas

_Zi 4

Inaccessible to motorized rollers.

l 1.3 GENERAL

)

This specification applies to backfill l

material placed by Bechtel.

When Specification 7220-C-210 is referenced, the l

. term " Subcontractor" shall mean Bechtel work p"

i forces, and the term " contractor" shall mean Bechtel's onsite geotechnical soils engineer.

In case of conflict, this specification shall i

prevail.

)

t The backf'11 material as described in this Specification contains both Q-listed and non-Q-listed work.

l 2.0 T. ELATED WORK NOT INCLUDED The following items of related work are not included:

2.1 Site clearing and grubbing 4

I 1

V g.k

Spacification 7220-C-211(Q), Rev 7 gj i

2.2 Slurry trench 3

l 2.3 Soils testing j

l 3.0 ABBREVIATIONS ASTM - American Society of Testing and Materials MIOSHA - Michigan Occupational Safety and Health Act 4.0 CODES AND STANDARDS Unless otherwise specified herein or shown in the drawings, materials, construction requirements, and testing shall be in accordance with the following

. codes and standards to the extent indicated by references herein.

The date of issue (or revision) indicated shall apply.

ASTM D 1557-70 Structural Method of Test for Moisture-Density Relations of Soils Using 10-Pound Rammer and 18-Inch Drop ASTM D 422-63 Standard Method of Test for Particle-Size Analysis of Soils ASTM D 2049-69 Standard Method of Test for Relative Density of Cohesionless Soils ASTM D 2216-71 Standard Method of Laboratory Determination of Moisture Content of Soil 5.0 EXCAVATIONS i

All necessary precautions shall be taken to preserve all material below and beyond the limits of required excavation in a sound and firm condition.

If, as lz)i determined by the onsite geotechnical soils engineer, materials below and beyond the required excavation limits were disturbed because of excavation methods employed, such material shall be removed and replaced with suitable compacted material as required by this specification.

All excavations shall conform to f

i MIOSHA requirements (MIOSHA compliance is non-Q).

421 Immediately upon completion and approval of each excavation for building foundations, a minimum of 4 inches of lean concrete mudmat (in accordance with~

Specification 7220-C-230) shall be poured on the bottom.

i 6.0 FOUNDATION PREPARATION No fill shall be placed on any foundation until the I4

- onsite geotechnical soils engineer has approved the foundation and reviewed the applicable tests.

h r

m -

--m--

m

-e

,., w

-.,m

--,r

.&~

t Spscification 7220-C-211(Q), Rev 7 Approval for the foundation shall be made immediately A

before placement of the material.

Foundations shall be cut to firm material and shall be free of all loose and wet material.

7.0 RECONDITIONING EXISTING EARTHWORK Prior to each year of backfill placement, the onsite 9eotechnical soils engineer shall approve all areas in which backfill material is to be placed.

Criteria for this approval shall include, but not be limited i

to, the following:

7.1 The ground surface and the subgrade does not contain any frozen or disturbed material.

7.2 The ground surface and the subgrade shall be firm material and shall be free of all loose and wet material.

7.3 The layer upon which the fill is to be placed shall be tested.

The number and type of tests shall be determined by the onsite geotechnical soils engineer.

8.0 BACKFILL 8.1 STRUCTURIL MATERIAL REQUIREMENTS Unless otherwise approved, materials for structural backfill shall be obtained from a i

source approved in accordance with Section 8.1.1 of this specification.

Designation and approval of a source does not necessarily indicate that all material from that source is suitable for structural backfill.

The suitability of the material is to be determined by the onsite geotechnical i

soils engineer in accordance with Section 8.7 of this specification.

Only suitable material i

I from the approved sources shall be placed in I

the backfill.

If unsuitable material is l

placed in any part of the backfill, all such f

material shall be removed and replaced with 4

suitable material.

Material containing brush,

}

roots, peat, sod, or other organic, perishable, or deleterious matter, snow, ice,

,i or frozen soil'shall not be placed in the backfill.

J 3

4

%1 La

s Specification 7220-C-211(Q), Rev 7

/$N 8.1.1 The materials used for structural backfill within 3 feet of the exterior wall of any plant area structure shall be cohesionless and free-draining.

The grain-size gradation, as determined by ASTM D 422 without the hydrometer test, shall be within the range shown below:

i Percent Retained

  • Sieve Size Fine Course 1 inch 0

0

  1. 4 0

25

  1. 10 0

50

  1. 40 40 95
  1. 200 95 100
  • This gradation range shall not be skip jg graded and is not meant to represent or coincide with materials (Zones 1, 2, 3, etc) defined in Specification 7220-C-210.

Project engineering shall be informed of the grain size distribution and 1

characteristics of the material

. proposed for use as structural backfill (see Section 8.7.1).

8.1.2 In lieu of the structural backfill materials described above, lean concrete, as specified in Specification a

7220-C-230, may be used when approved

/Zi by the onsite geotechnical soils engineer.

Lean concrete backfill shall be made of non-Q material and workmanship.

8.2 PLANT AREA BACKFILL

)

i 8.2.1 Except for sand from offsite sources, l gpg the materials used for plant area backfill are to be in accordance with i

the material portion of Section 13.3 of Specification 7220-C-210.

/bi 8.2.2 For plant area structures where depth i

of foundations lis 6 feet or more, the top 2 feet of backfill may consist of Eone 1 material as defined'in Specification 7220-C-210.

When approved by the onsite geotechnical soili engineer,' the top 6 inches may consist of Zone 4A material conforming j

to Specification 7220-C-210.

r 4

1 i

2

~

i

..,_,.w...._-

Spscit 4 cation 7220-C-211 (0,, dev 8

' eg j

8.2.3 Sand from offsite sources shall be approved by the onsite geotechnical soils engineer.

This sand shall be 100% passing the 3/4-inch sieve and a

{

maximum of 121 passing the Number 200 sieve.

Sand from offsite sourcos used as random fill needs no gradation requirements.

/$$

8.2.4 In lieu of sand from offsite sources, lean concrete, as specified in Specification 7220-C-230, may be used when approved by the onsite 4

geotechnical soils engineer.

Lean concrete backfill shall be made of non-Q material and workmanship.

8.3 PLACEMENT 8.3.1 After the completion of footings and walls and prior to placement of backfill, all forms will be removed, and the excavation shall be cleaned of all trash, debris, and unsuitable e

material.

8.3.2 No backfill material shall be placed in 4

any excavation until the condition of the subgrade has been approved by the onsite geotechnical soils engineer.

l The gradation and distribution of materials throughout the backfill shall be such that the completed backfill will be uniform and free from lenses, pockets, streaks, or other amterial i

imperfections except as required for utilities and other applications as 2$k j

determined by the onsite geotechnical soils engineer.

Material placed in the backfill shall not contain large solid i

lumps or clods of material which will not break down and compact satisfactorily when compacted as i

specified.

No backfill shall be placed upon a frozen surface, nor shall any

]

frozen material be incorporated in the backfill.

i The uncompacted lift thickness of the backfill material shall be determined by the onsite geotechnical soils engineer after evaluation of the proposed compaction equipment.

I However, in no case shall the uncompacted lift thickness exceed 5

t

-n


E e

Specification 7220-C-211(Q), Rev 7

/h, 8 inches for heavy, self-propelled equipment and 4 inches for hand-operated equipment.

8.3.3' Unless otherwise specified, backfill areas being placed shall be raised simultaneously with the top surface of the backfill to form an approximately horizontal plane or parallel with the final grade.

8.3.4 When placing material next to an area that has already been compacted, the intersecting surfaces shall extend into the previously compacted area.

This benching into the previously placed s

\\

material for each lift shall be a j

minimum of the lift thickness.

\\

8.3.5 All soils work shall be performed under the direction of a qualified onsite

~

geotechnical soils' engineer.

8.3.6 Backfilling in which moisture conditioning is required shall be suspended when the ambient temperature is 32F and falling unless otherwise approved by the.onsite geotechnical soils engineer.

G.4 MOISTURE CONTROL 8.4.1 Structural backfill and sand materials I

from offsite sources shall have

- g adequate moisture content to-obtain the.

I

' required-density.

If the material does i

not have sufficient moisture content to adequately compact the material, such material shall be conditioned by sprinkling, aerating, harrowing, disking, draining,. or by other approved means as determintJ by the onsite jg geotechnical engineer.

8.4.2 Plant Area Backfill Moisture control for plant area backfill,~except for sand from offsite sources, shall-be 12% of optimum in

/k1 accord'nce with Section 13.6 of Specif :ation 7220-C-210.

9 w

6 q.

Specification 7220-C-211(Q), Rev 7 8.4.3 Moisture Content The method to determine moisture content at the time of density testing (i.e., point of. acceptance) shall be in accordance with ASTM D 2216.

The method to determine moisture content for information purposes (i.e.,

before and during compaction) may be made by using rapid determination methods, provided the following is met.

3 a.

The code and/or manufacturer's instructions shall be followed.

I I

b.

The results using rapid determination methods shall be compatible with these obtained using ASTM D 2216.

c.

Compatibility of the methods shall be determined by the onsite geotechnical soils engineer.

d.

Nuclear density devices shall not be used to determine moisture content.

8.5 COMPACTION EQUIPMENT 8.5.1 Selection and approval of all of the

~

proposed compaction equipment shall be on the basis of demonstrated ability to accomplish adequate compaction without damage to, or overstressing of, the adjacent structural members.

8.5.2 Structural backfill and sand from g{,

offsite sources shall be compacted.

l using either rubber-tired rollers, i

vibratory rollers.or compactors, or power. tampers.

Use of compaction j

equipment other than operator-held I

equipment within 3. feet of the j

structural walls shall be reviewed by project engineering.

The onsite geotechnical soils engineer snall provide information regarding the proposed compaction equipment and location sufficient for an adequate i

review of the adjacent structural l

l members.

l'

'i I~

7 o

z4{

\\o

__