Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20076N1401983-07-15015 July 1983 Rept of Overhead Fluid Grouting Test Program ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program. ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage. ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment. ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20023D1331983-05-0505 May 1983 Evaluation of Pressures in Lines of Grouting Equipment - Crack Repair Borated Water Storage Tank Foundations. ML20081J6571983-04-12012 April 1983 Test Program Status & Rev 12 - Test Schedule ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl ML20071D9271983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump ML20071D9031983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump ML20071D9361983-02-0202 February 1983 Rev 1 to Hydraulic Snubbers 1985-12-13
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program. ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage. ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment. ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl ML20071D9271983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump ML20071D9361983-02-0202 February 1983 Rev 1 to Hydraulic Snubbers ML20071D9031983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump ML20076G1841983-01-28028 January 1983 Rev 1 to ATP-5-Q, Procedure for Providing Project Orientation ML20076G1651983-01-28028 January 1983 Rev 1 to ATP-4-Q, Procedure for Providing Mgjec QA Program ML20069Q4131982-10-25025 October 1982 to QA Dept Procedure B-3M-1, Qualification & Certification of Insp & Test Personnel 1985-12-13
[Table view] |
Text
i x
D
% On
%s v M'
N1 QUALIFICATIONS OF QUALITY 3 I
$ %y ASSURANCE AUDIT PERSONNEL b y a ! I sN e eK '
2 a k o k 3 /
5 % 7 3 .
5 $ % %
E M $
8 % .
- 8 -
D E # I MGJEC STANDARD N': O STD-1-0 REVISION NO: 2
= .
DATE: Jun'e '01, 1983 PAGE: 1 of 7 8
8 ii / hf hk'[
me (c
. ' PREPARED BY/DATE: 4-/- f8 c
. 9 APPROVED BY/DATE: i- - - -
y db b 8306140544 830607 PDR ADOCK 05000329 A PDR MARK G. JONES ENGINEERING CONSULTANTS, INC.
333 Hayes Street San Francisco, California 94102
STD-1-Q Revision 2 Page 2 of 7 9
TABLE OF REVISIONS Revision 0, Date January 28. 1983 Original Issue Revision 1, Date May 26. 1983 Added: Paragraph IV C '
EXHIBIT A & B Revised: Paragraph III, IV A1, IV B2, B3, B5 and V Revision 2, Date June 01. 1983 Revised Revision 1 Description on Page 2, Revised Paragraphs III and IVA G
STD-1-Q Revision 2 Page 3 of 7 Qualifications of Quality Assurance Audit Personnel I ~. SCOPE
. This document establishes the requirements for Audit Team leaders and Audit Team Members for internal audits of Projects covered by the MGJEC Quality Assurance Manual.
II. RESPONSIBILITY The President or his designee shall be responsible for verifying that the Audit Team Leaders and Members meet the requirements for the set forth in this document. He shall also be responsible training of the auditing personnel.
III. DEFINITIONS Audit - a documented activity perfortaed in accordance with A.
by examination written procedures or checklists to verify, applicable and evaluation of objecti.ve evidence,. that of the Quality Assurance program have been elements in developed, documented and effectively implemented -
accordance with specified requirements.
Qualified Audi tor- not working B. Audit Team Leader -A directly on the project, who is qualified to organi:e and direct an audit, report findings and evaluate corrective actions.
Qualified Auditor, not working C. Audit Team Member -A of an directly on the project, who performs any portion audit. .
D. Qualified Auditor - An individual trained in accordance with ATP-7-Q.
IV. QUALIFICATIONS A. Audit Team Member
- 1. Auditors shall have experience or training commensurate with the scope, comple::ity and special nature of the to be audited. His competence shall be activities developed by the following methods:
1
STD-1-Q Revision 2 Page 4 of 7
- a. Orientation to provide a working knowledge and understanding of the MGJEC Quality Assurance Manual and Project Instructions and Procedures and Contractual Requirements for projects to be audited.
- b. General training consisting of fundamentals, objectives, characteristics, organization, performance and results of quality auditing.
- c. Specialized training consisting of methods of examining, questioning, evaluating and documenting specific' audit items and closing out audit findings.
B. Audit Team Leader
- 1. The Audit Team Leader snall meet the requirements of the Audit Team Members described in IV A above.
- 2. He shall have a thorough understanding of the requirements of the MGJEC QA Manual, Project
'Instuctions and Procedures.
- 3. He shall be capable of organizing and conducting an -
audit in accordance with ATP-6-Q.
- 4. He shall be capable of documenting the results of the audit and reporting the results to management personnel in accordance with the MGJEC OA Manual and applicable OA procedures.
- 5. He shall be capable of evaluating and verifying implementation of corrective actions.
C. The Audit Team Leader and Audit Team Member shall be certified to meet the requirements set 'forth in this
, document, by the President or his designee. (See EXHIBIT A l and B)
=
l V. REFERENCES
- 1. MGJEC Ouality Assurance Manual (latest revision) .
l l
O STD-1-Q Revision 2 Page 5 of 7
- 2. MGJEC Procedure for Performing Internal Quality Assurance Audits, ATP-6-Q (latest revision)
- 3. MGJEC Procedure for Training MGJEC Audit Team Members, ATP-7-Q (latest revision) .
O g
.=
EXHIBIT A STD-1-Q Revision 2 Page 6 of 7 CERTIFICATION FOR AUDIT TEAM LEADER This certifies that has met th e requirements for A ud it Team Lead er in accordance with MGJEC Standard STD-1-Q, " Qualifications of Quality Assurance Audit Personnel."
He/she has previously been certified as an Audit Team Member and he meets the f ollowing requirement' s:
o Has an und er stan ding of the re quiremen ts of th e MGJEC OA Manual.
o Is capable o f or ganizing and conducting an audit in i accordance with the guidelines provided by the mana g em en t personnel, o Is capable of documenting the results of the audit and reporting the results to managecent- p er sonn el in 1
accordance with the MGJEC QA Manual and applicable QA
, Procedures.
o Is capable of evaluating corrective actions.
By Mark G. Jones, President i
MARK G. JONES ENGINEERING CONSULTANTS, INC.
333 Hayes Street San Francisco, California 94102
. ?-
EXHIBIT B STD-1-Q Revision 2 Page 7 of 7 4
CERTIFICATION FOR AUDIT TEAM MEMBER This certifies that has met the requirements for A ud it Team Member.in accordance with MGJEC Standard STD-1-Q, " Qualifications of Quality Assurance Audit Personnel."
It has been demonstrated that he/she has experience or training commensurate with the sc. ope, complexity and .special nature of the activities to be audited. This competence has been developed by the f ollowing:
o Had orientation to provide working kn o wie d g e and un d e rs ta nd in g of the MGJEC Quality Assurance Ma nu al and c project instructions.
o Training co ns is ti ng .o f f u nd a m en ta ls , objectives, characteristics, or ga ni za ti on , per f o rmance and results of quality auditing.
o Training consisting of me thod s of e xamining questioning ,
. evaluating and docurenting specific audit items and closing out audit finding.
o On-the-job training, guidance and counseling und er the direct supervision of an Audit Team L e a d e'r .
B'y Mark G. Jones, President MARK G. JONES ENGINEERING CONSULTANTS, INC.
333 Hayes Street.
San Francisco, California 94102 1
1 6