MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20076N1401983-07-15015 July 1983 Rept of Overhead Fluid Grouting Test Program ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program. ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage. ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment. ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20023D1331983-05-0505 May 1983 Evaluation of Pressures in Lines of Grouting Equipment - Crack Repair Borated Water Storage Tank Foundations. ML20081J6571983-04-12012 April 1983 Test Program Status & Rev 12 - Test Schedule ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl ML20071D9361983-02-0202 February 1983 Rev 1 to Hydraulic Snubbers ML20071D9271983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump ML20071D9031983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump 1985-12-13
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program. ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage. ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment. ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl ML20071D9361983-02-0202 February 1983 Rev 1 to Hydraulic Snubbers ML20071D9271983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump ML20071D9031983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump ML20076G1841983-01-28028 January 1983 Rev 1 to ATP-5-Q, Procedure for Providing Project Orientation ML20076G1651983-01-28028 January 1983 Rev 1 to ATP-4-Q, Procedure for Providing Mgjec QA Program ML20069Q4131982-10-25025 October 1982 to QA Dept Procedure B-3M-1, Qualification & Certification of Insp & Test Personnel 1985-12-13
[Table view] |
Text
. _ _
( ,7 * .' ' ,
PROCEDURE FOR CONTROL OF h PROJECT CORRESPONDENCE V N A N
.. i
% bi .
N 1
~
I g E V PROCEDURE NO. : ATP-1-Q .
> tp y E REVISION NO. : 2
- a. a y hk k g\ ,
.D' ATE: May 26, 198'3 .
= h PAGE: 1 of 10 e 2 0)
O E
5 E
~
17DEiA"01 01LY PREPARED BY/DATE:
APPROVED BY/DATE:
8"")fd Eb 3 y .
8306140555 830607 .
PDR ADOCK 05000329 A PDR MARK G. JONES ENGINEERING CONSULTANTS, INC.
333 Hayes Street San Francisco, California 94102
r . .. . _ _ _ .
- ~
ATP-1-Q Revision 2 Page 2 of 10 TABLE OF REVISIONS Revision 0, Date November 4 1982 Original issue. j Revision 1, Date January 28, 1983 Add sheet 2 of 4, " Table of Revisions"; change ATP-1 to ATP-1-Q; Add paragraphs " Required . Documentation",
paragraph V, and "Re f er e nce s ", paragraph VI.
. Revision 2, Date May 26, 1983 Revised procedure title, sections I through IV and VI.,,
9
-1 ATP-1-Q Revision 2 Page 3 of '10 Procedu:e for Control of Project Correspondence I. SCOPE This procedure describes the steps to be 'followed for logging and distributing quality-rela te d p ro je ct corr es po nd en ce. Documents that are f or,"inf orma tion only" shall not be subject to th es e controls.
The requirements for the handling, storage, shipping and general cont rol of quality-relat ed d oc uments a re described i n another procedure (R'eference B). .
II. RESPONSIBILITIES ,
The Project Administrator shall be responsible for' implementing '
this correspondence control procedure.
III. DEFINITIONS Quality-related documents arb those documents that are generated in the c ou rse of perf orming task s tha t a ff ect quality. These documents shall include the technical interf ace correspondence to and from the client, reports, d rawing s, and other pertinent documents as required by the MGJEC QA Manual (Ref erence A).
I V .' PROCEDURE A. A log for all client interface co rr es po nd en ce shall be established and maintained by the Project Administrator. It shall have provisions f or rec,ording d ocum e nt control numbers .
which are assigned to documents and for recording incoming and out going dates.
B. Th e incomin g t echnic al, cont ra ct ual an d qu alit y as sura nce c9rrespondence shall be identified using Exhibit 3 and co n -
trolled as f ollow s:
- 1. The f ollowing shall be place d on the fir st sheet of the correspondence by administ ativ e personnel under the direction of the Project Administrator:
a) Received date b) ' Project number
, ,,,,--y, - - ,- , - - + - - --e,w ,,
---r -w- - -
.. . _ - . . -_ --- .- ~ . _ .
t.
ATP-1-Q Revision 2 Page 4 of 10 c) Document control number (indicates document is controlled)
, 2. Correspondence data shall be recorded in the Interface Correspondence In-Log. (See Exhibit 1.0)
- 3. The document shall be routed to the' Project Administra-tor who shall determine the distribution for the document. Copies ma y be mad e.for distribu tion or the original may be routed and returned. Incoming co rr es pond en ce which contains quality-related t
controlled documents shall not be copied unless the document is st a mpe d "In f o r m atio n Only". The Project Administrator shall verify that the document received agrees with the transmittel do'cument.
- 4. After the distribution routing, the original document '
shall be filed in the appropriate file as indicated in th e log.
! 5. If the d oc um ent is in response to an o u .t going document, the date of the incoming correspondence shall i be recorded in the appropriate' response column of the Interface Correspondence Out-Log.
I C. Out going technical, contractual and quality assurance
! correspondence shall be controlled as f ollow s:
l- 1. All correspondence' shall contain the document control number and the project number. Letters shall have the document control number on all pages except any attachments.
- 2. The document control number shall be record ed in the Interface Correspondence Out-Log. (See Exhibit 2.0)
- 3. If the document is in response to an incoming document, the out going date shall be recorded in the appropriate response column of the Interface Correspondence In-Log.
- 4. A co py 'of the out-going document shall be placed in the file that is indicated in the Log.
V. REQUIRED DOCUMENTATION j A. Interface Correspondence In-Log (Exhibit 1.0)
B. Interface Correspondence Out-Log (Exhibit 2.0) l
. + . = . . . - - , = . . --s~ -~> s.z.,- . .ax u+. - - . .--s --. -.. ..- -
ATP-1-Q Revision 2 Page 5 of 10 VI. REFERENCE A. MGJEC Quality As su ra nc e Manual. (Latest Revision)
B. MGJEC Procedure ATP-10-Q, " Procedure for Doc ura e n t Control" (latest revision).
4 O
D e
99 8
6
. O
IN1 E RFAC E 1.0 CORRESPONDENCE [yHB IN-L OG nevision 2
- 6 of 10 JOB NO.
PROJECT PROJECT MANAGER CLIENT Sheet of N0' FILE DATE RESP.
DOCUMENT O REC'D SUBJECT DATE CONTROL NO. gH. NO.
G
IN1E RFACE EXHIBIT 2.0 CORRESPONDENCE ^T#-1-0 O U T.-L'OG Revision 2
~
Page 7 of 10 JOB NO.
PROJECT PROJECT hANAGER CLIENT- Sheet of DOClhiENT FILE DATE RESP.
NO. SENT SUBJECT DATE CONTROL NO. gg, w
I O
e l
t l
l
. 1 t _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ _______
t' i
Exhibit 3.0 ATP-1-Q Revision 2 I Page 8 of 10 Quality Document Checklist The lis ting b elo w is, in part, taken from A NSI N4 5.2.11 a nd is provided to indicate the generic types of subjects to be considered as Quality Documents and/or design input. Since the selection of d esign inputs may vary with each job, the Proj ect Ma na ge r is responsible for providing a dd itional guidance to project personnel if the selection of inputs has not been fo rmally pr escribed (e.g., in the pro posal, co ntra ct, or d esign specification).
Quality Documents shall include but are not limited to the following, where applicable:
o A. Quality Assurance Documents B. Contract Documents C. Procedures D. Drawings and Specifications E. Design Inputs
- 1. Basic functions of each s tr uc tu re, system, and
. - component.
- 2. Performance requirements such as capacity, rating, system output. ,
- 3. Codes, standards, and reulatory requirements including the applicable issue and/or addenda. -
4 Design conditions such as pressure, temperature, fluid chemistry and voltage.
- 5. Loads such as seismic, wind, thermal and dynamic.
- 6. Envir onm en t al condit' ions anticipated during storage, construction and operation such as pr essu re, temperature, h u mid it y, c or ro si ve ne ss ,
site elevation, wind direction, nuclear radiation, electromagnetic radiation and duration of exposure.
- 7. Interface requirements including definition of the functional and p hy s i c a l interfaces involving structures, systems and com ponents.
- 8. Material requirements in cl ud in g such items as co m pa t abilit y, electr3 cal insulation properties, protective coating and corrosion resistance.
. Exhibit 3.0 ATP-1-Q Revision 2 Page 9 of 10
- 9. Mechanical requirements such as vibration, s t r e's s ,
shock and reaction forces.
- 10. Structural requirements covering such items as equipment foundations and pipe supports.
- 11. Hydraulic requirements such as pump net positive suction hea ds (NPSH), allo wa bl e pressure d ro ps ,
and allo wable fluid velocities.
- 12. Ch e mis tr y requirements such as provisions for sampling and limitations on water chemistry.
- 13. Electrical requirements such as source of power, voltage, ra c e wa y re quire ments , electrical insulation and motor requirements.
- 14. Layout and arrangement requirements.
- 15. Operational requirements under various conditions, such as plant startup, normal plant operation, plant shutdown, plant em er genc y operations, l
special or infrequent operation and system j , _ abnormal or emergency operation.
- 16. Instrumentation and control requirements including indicating instruments, controls and alarms re quired f or o pera tion, tes ting a nd mainten an ce.
Other requirements such as the type of instrument, installed spares, range of measurement and .
location of indication should also be included.
- 17. Access and administrative control requirements f or plant security.
- 18. Redundancy, diversity, and separation requirements of structures, systems and components.
- 19. Failure affects re quirem ents of structures, systems and c o m p o n e,n t s , including a definition of o those events and a ccid en ts w hi ch they must be designed to withstand.
- 20. Test requirements including in-plant tests and the
- conditions under which they will be perf ormed.
- 21. Accessibility, maintenance, repair, and inservice inspection requirements for the plant, including the conditions under which these will be performed..
)
Exhibit 3.0 ~l ATP-1-Q Revision 2 Page 10 of 10
- 22. Personnel requirements and limitations including the qualification and number of personnel available for plant operation, maintenance, testing and inspection and permissible personnel radiation exposures for specified areas and conditions.
- 23. Transportability requirements such as size and shipping weight, limitations, I.C.C. regulations.
- 24. Fire protection or resistance requirements.
- 25. Handling, storage, and shipping requirements.
- 26. Other requirements to prevent un du e risk to the health and safety of the public. .
- 27. Materials, processes, parts and equipment suitable for application.
- 28. Safety requirements for preventing personnel injury including such items as radiation hazards, re st ri ct in g the use of dangerouis materials,
. _ escape provisions from enclosures, and grounding of electrical s y st em s.
6 4