MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20076N1401983-07-15015 July 1983 Rept of Overhead Fluid Grouting Test Program ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program. ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage. ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment. ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20023D1331983-05-0505 May 1983 Evaluation of Pressures in Lines of Grouting Equipment - Crack Repair Borated Water Storage Tank Foundations. ML20081J6571983-04-12012 April 1983 Test Program Status & Rev 12 - Test Schedule ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl ML20071D9271983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump ML20071D9031983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump ML20071D9361983-02-0202 February 1983 Rev 1 to Hydraulic Snubbers 1985-12-13
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program. ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage. ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment. ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl ML20071D9271983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump ML20071D9361983-02-0202 February 1983 Rev 1 to Hydraulic Snubbers ML20071D9031983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump ML20076G1841983-01-28028 January 1983 Rev 1 to ATP-5-Q, Procedure for Providing Project Orientation ML20076G1651983-01-28028 January 1983 Rev 1 to ATP-4-Q, Procedure for Providing Mgjec QA Program ML20069Q4131982-10-25025 October 1982 to QA Dept Procedure B-3M-1, Qualification & Certification of Insp & Test Personnel 1985-12-13
[Table view] |
Text
~
4
,,e -
% k l k . s PROCEDURE FOR DOCUMENTATION y OF POSTULATED INTERACTIONS B
- 8 t ,
> g v d '
i 5 '
E E' $
E
- m. u S
( E 1 5 PROJECT: Midland Energy Center E Y '
o Sp s.t i al Systems 5 $ (,h% Interaction Program / Seismic g EQ , g PROJECT NO: 8301
PROCEDURE NO: 8301-WTP-1-0 REVISION NO: 2 DATE: June 01, 1983 ,
PAGE: 1 of 7
?FORMAIDF ON.Y PREPARED BY/DATE: h d ' /'[I
. 0 .
APPROVED BY/DATE:
8306140546 830607 PDR A
ADOCK 05000329 PDR MARK G. JONES ENGINEERING CONSULTANTS, INC.
333 Hayes Street San Francisco, California 94102 l
l
^
i l
l l
- 8301-WTP-1-Q Revision 2 Page 2 of 7 TABLE OF REVISIONS Revision 0, Date Aoril 15. 1983 Original Issue Revision 1, Date May 26. 1983 Revised: IVB, C, and D and Exhibit A.
Deleted: Exhibit B.
Added: VB and VIB.
Revision 2, DateJune 01, 1983 Revised: Paragraphs IVB, IVC, V and VI.
e 4
0 .
e i
! l l
l
O /'
8301-WTP-1-Q Revision 2 Page 3 of 7 Procedure for Documentation of Postulated Interactions I. SCOPE This procedure describes the method of documentation and control of postulated interactions identified during plant walkdowns.
II. RESPONSIBILITIES' The Walkdown Team Leader shall be responsible for ensuring that interactions are documented in accordance with this procedure.
III. DEFINITIONS A. Interaction Identification Sheet (IIS) - The IIS is the document which describes the interaction and contains resolution information. (See EXHIBIT A)
IV. PROCEDURE A. Postulated interactions are identified by the walkdown team in accordance with the Spatial Systems Interaction Program / ~
Seismic (SSIP/S) criteria and procedures.
B. Interaction Identification Sheets (IIS's) are used to document interactions identified during SSIP/S walkdowns.
Minimum documentation requirements for inclusion on the IIS at the time of walkdown identification include:
- 1. Unique numbering of-each interaction consisting of the room number and a seque'nce number.
- 2. Location of each interaction in the plant
- 3. Identification of the interacting source and target components
~
- 4. A physical description of the interaction
- 5. A recommended resolution
- 6. Identification of responsible discipline for resolution
- 7. Signatures of the walkdown team member and leader
8001-WTP-1-0 Revision 2 Page 4 of 7 The ab'ove required minimum documentation shall be included in the initial issue (Revision O) of sheet 1 of the IIS.
C. Interaction Identification Sheets are used to document and summarize subsequent actions during the resolution phase of the identified interactions, and include:
- 1. Final resolution / verification - a brief description of the final interaction resolution is provided. The resolution may differ from the resolution recommended by the walkoown team on sheet 1. The MGJEC SSIP/S Project Manager's signature indicates the acceptability of analytic work supporting the interaction resolution.
- 2. Field verification - when the final resolution includes a plant modification, the Walkdown Team Leader shall endorse the IIS indicating that the installed modification satisfactorily resolves the identified interaction and that no new interactions have been created.
- 3. Final CPCo approval - upon completion of all required actions, the IIS shall be submitted to the CPCo SSIP/S Project Engineer for approval. Whether interactions are resolved by No Action Necessary or require the use of the IIS sheet 2, the final approval shall be made on sheet 1 of 2. -
The CPCo SSIP/S Project Engineer's signature indicates final, complete and acceptable close out of all interaction resolution and plant walkdown activities associated with the IIS. IIS's shall be issued as a subsequent revision upon endorsement by the CPCo SSIP/S Project Engineer.
D. Selected information contained on the IIS is entered into the SSIP/S computerized data base system which is "for ,
inf ormation oply".
V. REQUIRED DOCUMENTATION A. IIS (EXHIBIT A)
B. Interaction Identification Sheets shall be controlled in accordance with the provisions of ATP-10-0 for contro11ed' documents. Original, completed and signed-off IIS's are maintained in the files of the SSIP/S on-site group at the '
Midland Energy Center.
l l
8C01-WTP-1-Q Revision 2 Page 5 of 7 VI. REFERENCES A. " Program Manual: Spatial Systems Interaction Program /
Seismic, Midland Energy Center," Consumers Power Company, latest revision.
B. ATP-10-Q, MGJEC Procedure For Document Control (l atest revision).
m T
q
.- Shoot 1 of CONSUMERS POWER COMPANY 8301 Sn'P-1-h "
MIDLAND ENERGY CENTER Revision 2' SPATI AL SYSTEMS INTER ACTION PROGR AM/ SEISMIC Page 6 of ,7 Exhibit A INTERACTION IDENTIFICATION SHEET (IIS)
POSTULATED INTERACTION NO: .
ROOM NO.: FLOOR FLEVATION: SOURCE ELEVATION:
LOCATION WITHIN ROOM:
IDENTIFICATION OF INTERACTION COMPONENTS:
SOURCE: SOURCE CODE:
TARGET:
i POSTULATED INTERACTION DESCRIPTION:
IC NO.:
RECOMMENDED RESOLUTION BY WALKDOWN TEAM (SEE SHE'ET TWO IF FINAL RESOLUTION REQUIRED): ..
RR NO.:
WALKDOWN TEAM ORIGINATOR /DATE CPCo PROJECT ENGR. APPROV AL/DATE
- WALKDOWN TEAM LEADER APPROVAL /DATE REV DATE BY APP , DESCRIPTION Rev. 5/83
~ -
i Shoot 2 at 8,301-WTP-1-Q CONSUMERS POWER COMPANY ,
MIDLAND ENERGY CENTER SPATIAL SYSTEMS INTERACTION PROGRAM / SEISMIC Exhi.
bit A (cont,).
. INTERACTION IDENTIFICATION SHEET (IIS)
POSTULATED INTERACTION NO.:
continued from page one:
t FINAL RESOLUTION / VERIFICATION OF POSTULATED INTERACTION:
FR NO.:
SSIP/S PROJECT MANAGER /DATE FIELD VERIFICATION:
WALKDOWN TEAM LEADER /DATE REFERENCE RESOLUTION DOCUMENTS:
DESIGN CHANGE DOCUMENT NO.: